This document summarizes a site investigation for a flow meter installation project. It provides details about the project location, date and crew, as well as measurements and conditions at the site. Specifically, it notes the manhole depth and diameter, measured flow depth and velocity, antenna installation considerations, and includes a sketch of the pipe cross section with dimensional measurements. Potential installation challenges are identified, such as needing a long antennae chord to reach outside the structure if a cellular signal cannot be obtained inside.
This document summarizes a site investigation for a flow meter installation project. It provides details about the project location, date and crew, as well as measurements and conditions at the site. Specifically, it notes the manhole depth and diameter, measured flow depth and velocity, antenna installation considerations, and includes a sketch of the pipe cross section with dimensional measurements. Potential installation challenges are identified, such as needing a long antennae chord to reach outside the structure if a cellular signal cannot be obtained inside.
This document summarizes a site investigation for a flow meter installation project. It provides details about the project location, date and crew, as well as measurements and conditions at the site. Specifically, it notes the manhole depth and diameter, measured flow depth and velocity, antenna installation considerations, and includes a sketch of the pipe cross section with dimensional measurements. Potential installation challenges are identified, such as needing a long antennae chord to reach outside the structure if a cellular signal cannot be obtained inside.
Project: Location: Date/Time: Crew: Omaha FM CS0 205 3-4-10 / 11:00 JN-RC MH#: Pipe Shape: Pipe Material: Pipe Size (in): CSO 205 Square Concrete 144” x 119” Site ID: Address: Site Quality: Basin: 3 64th & Dupont Good
Location Map Planar Description
Summary Description:
Site Hazards Measurements Site Conditions
Heavy Traffic? No Manhole Depth (ft): See drawings Surcharge Evidence? N/A Needed Traffic Attendants: 0 Manhole Dia. (in): See drawings Depth of Surcharge (ft): 0 H2S: 0 O2: 20.7 MH Cover Size (in): N/A Depth of Debris (in): 0 LEL: 0 CO: 0 MH Cover Type: N/A Usable MH Steps? No Describe potential hazards: Measured Flow Depth (in): 5 Meter: 2150 Velocity (fps): 0.50 Cellular Signal Strength: Good Mounting Band Description: Antennae Install Considerations: Plate w/ conduit for A/V will need 75’ Antennae may work in structure. If not + or – of Probe chord to hang meter will need at least 50’ antennae chords outside lines to reach outside. Other Comments: Permanent Power Available? Not sure, in structure w/ no visible power might get power from structure. Page 2