Professional Documents
Culture Documents
Integrated Bridge Systems (IBS) : T.C. Dokuz Eylül University Maritime Faculty Marine Transportation Engineering
Integrated Bridge Systems (IBS) : T.C. Dokuz Eylül University Maritime Faculty Marine Transportation Engineering
İZMİR-2010
1
INTEGRATED
Combining or coordinating separate elements so as to provide harmoni
ous, interrelated whole, organized or structured so that constituent
units function cooperatively.
2
DEFINITION OF IBS
3
IBS IN MARITIME STATUTORY DOCUMENTS
4
PERFORMANCE STANDARDS OF IBS
A. SYSTEM REQUIREMENT
1. passage execution;
2. communications;
3. machinery control;
4. loading, discharging and cargo control; and
5. safety and security.
5
B. GENERAL REQUIREMENTS
GENERAL
6
INTEGRATION
7
INTEGRATION ( CONT. )
8
DATA EXCHANGE
FAILURE ANALYSIS
9
C.OPERATIONAL REQUIREMENTS
HUMAN FACTORS
* For actions which may cause unintended results, the IBS should request
confirmation from the operator.
10
FUNCTIONALITY
* The system management should ensure, that one user only has the
focus of an input or function at the same time. If so, all other users
should be informed about that by the IBS.
11
D. TECHNICAL REQUIREMENTS
SENSORS
ALARM MANAGEMENT
12
ALARM MANAGEMENT ( CONT.)
* The number of alarm types and their release should be kept as low as
possible by providing indications for information of lower importance.
* Alarms should be displayed so that the alarm reason and the resulting
functional restrictions can be easily understood. Indications should be
self-explanatory.
13
POWER INTERRUPTIONS AND SHUT-DOWN ( CONT. )
POWER SUPPLY
14
POWER SUPPLY ( CONT.)
15
INTEGRATED BRIDGE SYSTEM (IBS) FOR SHIPS - FURUNO DEEPSEA
16
TRANSAS INTEGRATED BRIDGE SYSTEMS
17
GENERAL INFO ABOUT IBS
* Rules from classification societies such as Det Norske Veritas
(DNV) specify design criteria for bridge workstations.
- technical system,
- human operator,
- man/machine interface,
and operational procedures
18
An IBS generally consists of at least:
* Dual ECDIS installation – one serving master and the other as backup
and route planning station.
* DGPS positioning
19
DNV APPROVED INTEGRATED BRIDGE SYSTEM LAYOUT
OF M/S BOA GALATEA
20
Aft conning station of M/S BOA GALATEA 21
BIBLIOGRAPHY
22
THANK YOU FOR YOUR PATIENCE !!!
23