CITY OF PENTICTON ~ PROJECT STATUS SUMMARY
Report to Council
Project: Penticton Community Centre Spomsion Projact No: 210v001
Cent: The CiyofPeniicon RetNe: PSs
Nile: Ms Anse Antonie Dote: October 27.2010,
Stolus Repor Period nding: Ocober 22,2010
11 budget Update
Conscerable progress nos been mae to crys he projet’ cos! orecas ot choot in
the clocked sresctnee. The lial fencer package 7 wor eived lat week wich when
completed, wii concice the sudcontracto selection process er fe project ona
erresponcing cos! sk. Curent opproxmately Corstueton Budget nae
‘Seen commited s fed picingin the slat son Dominion contact.
As shown the project e now frecat!to come in win the $22.2 M overal budge, The Poisc!
‘Managemen! team bolever fst adequate contingencies are Plove forthe remain fs
Stichedte, chonge ates, ond wecthar, ll ofwnich neste be cisely moriored are
‘managed to achieve there.
12 Schedule Update
The occeloraton provtion previous approved bythe Slowing Convnilee have hos! a
tremendous impact in improving the schedule ft he project ond fis now expected hat he
‘bung root stuctwe ond rooting wil be completed by tne Novernber | miesene. Ths efor
ieomwatk ond communication By the General Convocto ona ubwaces. Some Ngrgns 1
work done over te Ia! few wets neice!
Complated Glam instalation incising set oo! svete ovr.
Continue back Bl bend etixe pool and mechnica room wale
Mechanical and Becticalroughinsin exiting bung.
Structural steeinstslec for Lure Poo
Slerted hol pool bow grade machenied,
Poured Concours aspended ua,
Fefesl cacti cacao,ah
SS+A
ar sewn
sm Oranmesen
over tha next tw weeks you can expect fo 390 he folowing actives take ploce ashe
Building envelop bags to get Rag onthe etleal pan ing program ated
Continue to fcleaksin Lop pot
Sertroofng and wotesproeing op p00 oot
Sor lau ode an se sree
Ser soe! stud and cans gloss wal shoctres
Freporations fr Lene pool sob pour
Form ond pour neo south shoot wee
Etec! Hot pool foo sructured tieg info above seer wat
Hoard pool crea ond slo heating
Sat le layout end prop exposed pool areas othe
Compete meson scope of work
ss with any meer renovation project the team encpotes hal there wi be chalenges long
‘Ne way. Curenity ney a deaing wih poolieaks mes! ly coused othe aining between
‘ne os end new pool suctures. Goch ime fomething Ke "hot Comae up @ wer aru
developed to keep Ihe project moving lowares the lxgel comple¥on de,
‘tpcoming Milestones
‘over tne nae! months th folowing mlasones wile vies fo mark he bullng's progress
logeal he March SI, 2011 competion schecae:
+ Lap Pool tng intoted “November 1
Masonry completed Noverbe 2
1 PootRosing compieled November 11
{eure Poo! concrete completed Noversber 23
Going comieteNoversoer 25
Lap pool compete Decembe’ 7
Cladding complete December 29°
CConctele ware completed December 31SS+A
PIVETA wn
CITY OF PENTICTON ~ PROJECT STATUS SUMMARY
Report to Council
Project Penicton Community Conte Exporion PjectNe: 210001
Cent: The iy af eniton Rel.no: PSST
Dnt Me Anette Antonio Dole: Setoter 27.010
Stats Repot Feld Ending: October 22,2010
11 tudget te
Comgerobe progress hat been made to este the pies! ost orecastasincicoted in
te ltecned serecatnes!. The tha Tender pockoge 7 wor sed last week vic, when
Completed, wi conclude. the subconocior smmcton process fr ihe pejecl ond
{cerresponcing cot Casey. porexmately $19Mol th $19 86 corscton budget hos
fort nine pocess obeing commited os tied pidgin he Sher! Ouse Dominlon cones!
As shown, the prolect I now forecast! fo come fn wlhn the §2333M overall budget, The
forecast hades @ Constucton Contingency for the romciing kt of schece, change
‘ides, ond weather al al wrien pees tobe lore montared and managed ioccheve Rs
‘eau the Pec! Managerran! foam Debves tne remaining contngancy i secuoncble, et
SS ten ee. The pect Too hora ct change montuing ove pce fo cond
(Bape Sumenery Enc)
Schedule Updote
The two acceleration provslns previous approved by the Steeng Commiee rave hod &
tremandour mpoct in improving he schedule for he pre! one snow exscied hel he
butdng oo!stucive ond decking val be completed bythe Noveriber milestone, Tir eer
has Been a ambinaion of second ahr, oaiona row, ome oaelatrcaton an goed
tomer ong communication bythe General Canactorcnd ibtades, Some ighighs ot
Lop Post Conerate Tsing Underway Foo flee capacity
Completed Gum istohoonnchsing sel root ructue ver
Conte back Ml bering esure pool ond mecnoricalroom wall
Mecnoica ond Becitectreugrnsinexstng bung
‘SuctuolSeelinid forLalure Foo ot
Srtedhot pool blow grade mechanical
Poured Concoure snpended ioe
deca conasele deck poured