START SEND DATA TO


NO -Delay 1Min COMPUTER
A

check CB-G/C- y
EXIST. GEN 1 & CB-G/C-2 e
MIN. 2 NOS. SECCO
MIN. 2 SET open SECCO s
NEW GEN. POWER OK
READY ok
SET READY
SIGNAL
B
B

YES YE NO
S OPEN CB-
G/C1 OPEN CB-I/C-1
OPEN-CB BT-1 CLOSE CB-
OPEN CB-5,6 OPEN CB-
G/C2 G/C1 & CB-
CLOSE CB BT-2 CLOSE CB BT-1 G/C2
C

PRIORITY-1
CLOSE-LVB-2,S/S-PH NEW GEN. NEW GEN.
PRIORITY-1 START CMD
START CMD
CLOSE-LVB-2,S/S-PH
AT THE SAME TIME
D

NO
EXIST. GEN.
PRIORITY-2 1&2 READY
CLOSE-LVB3 PRIORITY-2
SIG.
CLOSE-LVB3

PRIORITY 1
PRIORITY-3
E

PRIORITY-3 CLOSE CB 1&2


CLOSE LVB-1 S/S-22,LVB-6
CLOSE LVB-1
NO

EXIST. GEN-3
READY
NO NEW GEN-3 PRIORITY 2
SIGNAL WAIT 15MIN.
CHECK ABLE TO
READY CLOSE LVB-7,LVB-8
TAKE LOAD SIGNAL
F

YES YES
YES

EXIST. GEN. 3
AT THE SAME TIME

READY
PRIORITY-4 PRIORITY-4
SIGNAL
CLOSE-LVB-5 CLOSE-LVB-5
G

PRIORITY 3
PRIORITY-5 CLOSE CB ,S/S-27,22A
PRIORITY-5 10,A&B
CLOSE-LVB-4
CLOSE-LVB-4

END
END END
H

Date 25.10.201 TITLE : Project No. =


Drawn 0 Project : Central Control and
Monitoring System
MAFA Est. C-10091
+
Appr. Faiz Muhamamd Adeel Faiz Ahmad FLOW Scale : Drawing No. : sheet 1