Professional Documents
Culture Documents
Nikhilesh Ray (SAP QM-PP)
Nikhilesh Ray (SAP QM-PP)
Nikhilesh Ray (SAP QM-PP)
Resume Summary
Experience Summary
I am an Nikhilesh Ray having total 9+ years of professional experience. I am working
as a SAP Consultant for Quality Management module. I am much familiar in analyzing the
problem & solving it.
27th April 2010 – Till Capgemini India Pvt Ltd Senior Consultant
date ( 2 months )
Nov 2006 – 26th April Tata Consultancy Services Ltd Asst. System Engineer
2010 ( 3 yrs and 5
months)
Sept 2003 - Sept 2006 Ranbaxy Fine Chemicals Ltd. 1. Quality Control Chemist – 0.6 years
(3yrs and one month) 2. Executive in SAP Support (QM/PP) –
2.5 years
July 2002 – Aug 2003 EE Writing Pvt Ltd. Content Writer and Visualizer
(1yr and 1 month)
Jan 2002 – June 2002 GRG Detox engineering Pvt. Marketing Executive
(6 months) Ltd.
April 2001 - Oct 2001 Lakhotia Computer Center Faculty for C, C++ and VB
(7 months)
SAP-QM Skills
• Quality Planning (Inspection Plan, Inspection Method, Q-info record)
• Quality Inspection (Inspection lot processing, QM in production, Results recording,
Defects recording, Quality Level, Sample management)
• Quality Control (Dynamic modification of the inspection scope, Quality-related costs)
• Quality Certificates
• Quality Notifications (Defect Analysis, Customer Complaint, Complaint against Vendor)
SAP-DMS Skills
SAP DMS are for storing documents such as CAD drawings, Materials pictures etc.
• Creating, Changing and Displaying Documents
• Searching Documents
• Approving Documents
• Document Status Log
• Assigning Documents to a Master Record like Material Master, Q-info Record
Technology
Technology SAP QM / PP
Data Base Microsoft Access
Operating Systems Windows 95/98/NT/2000
Resume of Nikhilesh Ray
Resume of Nikhilesh Ray
Qualifications
Higher Secondary 1996 G.G.S.K. School Jabalpur (M.P) Physics, Chemistry, Mathematics,
Hindi, English (64%)
High School 1994 G.G.S.K. School Jabalpur (M.P) Science, Mathematics, Hindi, English,
Sanskrit (74.3%)
Assignments
SAP Experience
Project # 5 Honeywell Support Project
Customer Honeywell
Period July 2009 to April 2010
Highlights Offshore Support for the client for resolving tickets related to QM and PP-VC
modules. The tools used for tracking and registering the solution were Remedy
(issue Tracker), Charm and Mercury ( testing software)
Resume of Nikhilesh Ray
Customer WABCO
Period Feb. 2008 to June 2009
Description WABCO Vehicle Control Systems is a leading supplier of safety and control
systems for commercial vehicles like truck, trailer, and bus manufacturers. They
are manufacturer of:
• Anti-lock Braking System (ABS)
• Air System Protector (ASP)
• Electronic Braking System (EBS)
• Electronic Stability Control (ESC)
• Roll Stability Support (RSS)
• Electronically Controlled Air Suspension (ECAS)
• Integrated Vehicle Tire Pressure Monitoring (IVTM)
Highlights I have gone through the following phases in France & Dubai Rollout Projects:
Phase 5: Go-Live and support: Go live & support involved transporting the
customized system to the production environment and monitoring the live
system.
Description CADBURY Schweppes, based in the UK, is the world’s largest confectionery
company and has a strong regional presence in beverages in North America and
Australia. Cadbury Schweppes products – including brands such as 7Up,
Cadbury Schweppes, Halls, Dentyne, Bubblicious and Bassett – are enjoyed in
almost every country around the world.
Highlights Rollout Project of SAP R/3 ECC 6.0 in Cadbury Schweppes. This was a rollout
project for across Asia Pacific region covering PS, SD, FI, CO, MM, WM, PP and
QM modules. They had discrete manufacturing scenario.
Responsibility:
• Responsible for process mapping for “to-be” process, gap analysis, user
requirement study and approval of the same for Quality Management
Module.
• Finalizing Forms, Report, Interface, Conversion and Enhancement
(FRICE) requirement
• Consulting for scenario development and test cases preparation for Unit
testing and integration to test business processes in Prototype.
• Consulting on PS-PP-MM- WM-QM integration.
Description The group has interests in the entire range of power sector industries viz.,
Thermal, Nuclear, Hydro, Co-generation, Captive and IPP sector. GEA Energy
System India Ltd is the manufacturer of Air Fin Cooler, Tube Cleaning System,
Debris Filter, Header Boxes used in Power Plant and various process industries.
Highlights Implementation of SAP R/3 ECC 6.0 in project based industry GEA Energy
System (India) Ltd. This is an end-to-end implementation project covering PS,
SD, FI, CO, MM, PP, VC, QM and DMS modules. This project is expected to fulfill
the requirement of project based industry such as planning project activities,
budgetary control, revenue planning, material planning, manufacturing
management, quality and design document management. ASAP methodology is
being followed for implementation. The project has gone live on May 13, 2007
and it is in post go-live support phase.
Specific Responsibility:
Quality planning, Quality inspection, Quality Control and Quality certificates.
• Initial training (L1 and L2) to core team members
• Process understanding, process mapping and preparation of Business
Blueprint document
• Gap Analysis
• Configuration for Quality Management module
• Preparation of Test Scenarios for Unit Testing and Integration Testing
• Assisting technical team in Data conversion and uploading master data
for QM.
• Configuration guide preparation and training(L3) to Core Team Member
• Assisting core team member in preparation of matrix for Roles and
Authorization.
Developments:
• Master data uploads and Testing of ABAP developments
• QM Report Developments.
Project # 2 RFCL SAP R/3 ECC 5.0 Rollout and Upgrade project.
Description RFCL Ltd is derived from company called Ranbaxy Laboratories Ltd.
ICICI Venture bought RFCL from Ranbaxy. RFCL focuses on vitro diagnostics,
animal healthcare, laboratory solutions and custom synthesis through its four
strategic business units, namely, Diagnova, Vetnex, Rankem and Neosynth.
Highlights • Explaining the as–is business flow of Ranbaxy Fine Chemical Ltd to the
implementation team.
• Assisting the implementation team in mapping business processes.
• Unit testing & integration testing done on the mapped requirements.
• Downloading the Master Data from different tables related to QM, PP and
MM from legacy the 4.6c SAP server.
• Create LSMW and helping to prepare the BDC for uploading master data.
Resume of Nikhilesh Ray
Developments:
• Developed Report for BOM listing.
• Print out of Inspection Plan (Specification)
• Change History data for recorded results
• Provide functional support on the following SAP modules QM, PP and MM.
• Support end users to resolve issues on SAP systems.
• Understand or seek to understand the underlying business processes.
• Provide functional training to end users.
• Worked with ABAP programmers to resolve issues.
• Liaise with external consultant to troubleshoot and resolve issues.
Developments:
• Generate Certificate of Analysis
• Stock Report
Functional Experience:
I have worked as Quality Control Executive and Production Planner and was
responsible for:
Resume of Nikhilesh Ray
Personal Details
Date of Birth 20-10-1979
Nationality Indian
Passport Details
Name as on Relation Passport Date of Issue Expiry Date Place of
passport ship Number Issue
Nikhilesh Ray G7284409 30/01/2008 29/01/2008 Thane