Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

DAILY SAFETY CHECK-LIST

TO PROJECT MANAGER: Date:


PROJECT Serial #:

1-SAFETY EQUIPMENTS (PPE) 4-LIFTING GEARS 8-ELECTRICITY


HELMETS HOOKS/SHACKLES CONDITION OF CABLE
SAFETY BOOTS RINGS/EYE BOLTS CABLE NOT ON WALK WAY
OVERALLS SLINGS-BELT/CHAIN CABLE PROTECTED ON WALK WAY
GOLVES CABLE NOT IN WATER
HARNESS 5-FIRE PROTECTION CORRECT PLUGS/SOCKETS
EYE PROTECTION FIRE EXTINGUSHERS
NOSE PROTECTION PERSONAL TRAINING OTHERS
EAR PROTECTION WARNING SIGNS

2-SCAFFOLDS 6-LIFTING APPLIANCES 9-SITE STATUS


BASE PLATE TOWER CRANE GENERAL TIDINES
STANDARDS/LEADGERS MOBILE CRANE NAILED WOOD
TITES/BRACING PASSANGER/GOODS HOISTS MATERIAL STACKING
LADDER/POSITION OVER RUN/ARRESTOR GEAR STRIPPING OF SHUTTERS
MOBILE ACCESS TOWERS HOIST LEVEL INDICATOR SITE LIGHTING
STATIC ACCESS TOWERS BACK & PINION HOIST ACCESS WAY
WORKING PLATFORM TRAINED HOIST OPERATOR COVERED OPENINGS IN FLOOR
GUARD RAILS/TOE BOARDS TRAINED FORKLIFT DRIVER EDGE PROTECTION
MATERIAL TOWERS BOB CATS HANDTOOLS PROTECTED
FALSE WORK SAFE EDGE WORK
CRADLES OTHERS

3-EXCAVATIONS 7-MECH PLANTS 10-HEALTH & WELFARE


ACCESS LADDERS PORTABLE TOOLS PROVISION FOR DRINKING WATER
GUARDING CARTRIDGE HAMMERS SHADED AREA
TIMBERING WOOD WORK MACHINERY TOILET FACILITIES
TEMPORARY WORK OTHER MACHINERY WASHING FACILITIES
EXCAVATION SPOILS TRANSPORT FIRST AID ROOM
SPOILS AWAY FROM EDGE EARTHMOVING PLANTS TRAINED FIRST AIDER

REMARKES:

SAFETY MANAGER:

You might also like