Professional Documents
Culture Documents
J&D R-10
J&D R-10
Work Description
QTY DESCRIPTION PRICE AMOUNT
Sanded down tub twice and cleaned with solution twice to remove residue
Painted tub with epoxy
Removed old sink and replaced with new
Removed old plumbing and replaced with new
Installed new toilet seat
Replaced kitchen floor
Installed blinds and smoke detector
Removed old refrigerator and replaced with new
TOTAL $470.00
COMMENTS: