Table of Contents

Acknowledgement
Abstract

Chapter 1:

1.0 COMPANY BACKGROUND


1.1 ZECON BERHAD
1.2 LICENSES
1.3 ACCREDITATION
1.4 QUALITY POLICIES
1.5 HEALTH AND SAFETY POLICIES
1.6 INFRASTRUCTURE & CONSTRUCTION DIVISION QUALITY
OBJECTIVES
1.7 ZECON HEADQUARTERS
1.8 ZECON MATANG OFFICE
1.9 CORPORATE STRUCTURE
1.10 ORGANIZATIONAL STRUCTURE

Chapter 2:

2.0 FEDERAL ADMINISTRATIVE COMPLEX (FAC) ACCESS ROAD


2.1 Project Description
2.2 Contract Details
2.3 Scope of Work
2.4 Gateway Bridge
2.5 Sg. Sebubut Minor Bridge

Chapter 3:

3.0 REVISED ROUTE FROM TAMAN MATANG JAYA TO DEMAK


3.1 Project Description
3.2 Contract Details
3.3 Scope of Work
3.4 Sg. Siol Bridge

i
Table of Contents

Chapter 4

4.0 SUMMARY OF WORK EXPERIENCES DURING TRAINING


4.1 INTRODUCTION

4.2 EARTHWORKS
4.2.1 SITE CLEARING
4.2.1.1 Supervising Works
4.2.1.2 Problems Encountered
4.2.1.3 Solutions to Problems Encountered
4.2.2 EARTH CUT AND FILL
4.2.2.1 Supervising Works
4.2.2.2 Problems Encountered
4.2.2.3 Solutions to Problems Encountered
4.2.3 TURFING WORKS
4.2.3.1 Supervising Work
4.2.3.2 Problems Encountered
4.2.3.3 Solutions to Problems Encountered

4.3 SUB-GRADE LEVEL


4.3.1 Supervising Works
4.3.2 Problems Encountered
4.3.3 Solutions to Problems Encountered

4.4 ROADWORKS
4.4.1 LAYING OF GEOTEXTILE
4.4.2 PREPARATION OF ROAD SUB-BASE
4.4.2.1 Supervising Works
4.4.3 PREPARATION OF ROAD-BASE
4.4.3.1 Supervising Works
4.4.3.1.1 Steps in Coring Stone Base
4.4.3.2 Problems Encountered
4.4.3.3 Solutions to Problems Encountered

i
Table of Contents

4.4.4 PREMIX WORKS


4.4.4.1 Supervising works
4.4.4.2 Problems encountered
4.4.4.3 Solutions to Problems Encountered
4.4.5 ROAD KERB
4.4.5.1 Supervising works
4.4.5.2 Problems Encountered
4.4.5.3 Solutions to Problems Encountered
4.4.6 ROAD MARKINGS
4.4.6.1 Supervising works

4.5 DRAINAGE & CULVERT WORKS


4.5.1 SUBSOIL DRAIN
4.5.2 ROADSIDE DRAIN
4.5.2.1 Supervising Works
4.5.2.2 Problems Encountered
4.5.2.3 Solutions to Problems Encountered
4.5.3 MEDIAN DRAIN
4.5.3.1 Supervising Works
4.5.3.2 Problems Encountered
4.5.3.3 Solutions to Problems Encountered
4.5.4 TOE DRAIN
4.5.5 CULVERT

4.6 SURVEYING WORKS


4.6.1 SETTING OUT / OFFSET
4.6.1.1 Supervising Works
4.6.1.2 Problems Encountered
4.6.1.3 Solutions to Problem Encountered
4.6.2 Leveling Survey
4.6.3 Asbuilt Survey

i
Table of Contents

4.7 LABORATORY TESTS


4.7.1 STANDARD PENETRATION TEST
4.7.1.1 Procedure
4.7.1.2 Purposes
4.7.1.3 Correlation with Soil Mechanical Properties
4.7.2 STANDARD COMPACTION TEST
4.7.2.1 Supervising work
4.7.3 SIEVE ANALYSIS TEST
4.7.3.1 Procedure
4.7.3.2 Preparation
4.7.3.3 Engineering applications

4.8 OFFICE / ADMINISTRATIVE WORKS


4.8.1 PURCHASING ITEMS
4.8.2 REQUEST FOR INSPECTION FORMS (RFI)
4.8.3 DAILY SITE REPORT
4.8.4 H.E.S.S. STATISTICS REPORTS

Chapter 5

5.0 ASSIGNMENT

References
Appendices

You might also like