Vadher Builders VJ Chotalia Patel Builders Akshar Construction
It.No Description Unit Quantity T-6 T-6 T-7 T-7 T-8 T-8 T-9 T-9
Rate Amount Rate Amount Rate Amount Rate Amount
1 Excavation with backfill: - - - - -
a upto 6' cft 220000 2.5 550,000 - 3 660,000 3 660,000
b 6 to 12' cft 10,000 2.75 27,500 - 5 50,000 3.5 35,000
c above 12' cft 3 - - 10 - 4.25 -
2
a cft 2 - 1.25 - 1.5 - 1.25 -
b cft 2.5 - 2 - 1.75 - 2.8 -
c cft 1 - - 1.5 - 4.5 -
3 Dept Labour
M no 80 - 80 - 95 - 125 -
F no 70 - 70 - 75 - 100 -
4
a cft 3.5 - 2 - 4.5 - 5.5 -
b cft 5000 3.5 17,500 3 15,000 6.5 32,500 5 25,000
6
a sft 4.25 - 1.75 - 6 - 4 -
b sft 20000 4.25 85,000 3.5 70,000 4 80,000 3.3 66,000
Page:1
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
Vadher Builders VJ Chotalia Patel Builders Akshar Construction
It.No Description Unit Quantity T-6 T-6 T-7 T-7 T-8 T-8 T-9 T-9
Rate Amount Rate Amount Rate Amount Rate Amount
8
a cft 0 4 - 6 - 5.5 - 6.5 -
c cft 10000 4.25 42,500 8 80,000 6.25 62,500 5 50,000
9
a cft 150000 4.5 675,000 6 900,000 5.5 825,000 6.75 1,012,500
b cft 5.75 - 7 - 6.5 - 7.5 -
c cft 4.5 - 8 - 8.5 - 7.3 -
d cft 4.5 - 10 - 9.5 - 7.7 -
11
a rft 3000 23 69,000 25 75,000 40 120,000 100 300,000
b rft 18 - 20 - 40 - 90 -
c rft 18 - 20 - 40 - 90 -
12
a 800 35 28,000 60 48,000 125 100,000 250 200,000
b 800 75 60,000 100 80,000 150 120,000 300 240,000
13 sft 7 - 6 - 10 - 6 -
14 sft 25 - 8 - 40 - 11 -
17 0
Page:2
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
Vadher Builders VJ Chotalia Patel Builders Akshar Construction
It.No Description Unit Quantity T-6 T-6 T-7 T-7 T-8 T-8 T-9 T-9
Rate Amount Rate Amount Rate Amount Rate Amount
18 skilled no 200 - 250 - 225 - 250 -
M no 90 - 100 - 95 - 130 -
F no 70 - 80 - 75 - 100 -
Palakh no 90 - 125 - 150 - 150 -
19
a sft 8400 19 159,600 21 176,400 35 294,000 45 378,000
b sft 8400 19 159,600 30 252,000 33 277,200 50 420,000
c sft 4200 19 79,800 25 105,000 35 147,000 55 231,000
22 sft 0 - - - 12 -
23 Skilled no 175 - 175 - 225 - 310 -
Unskilled no 90 - 100 - 95 - 220 -
24 - - - -
25 sft 13.5 - 8 - 8 - 10.5 -
30 sft 16 - 15 - 21 - 20.8 -
Page:3
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
Vadher Builders VJ Chotalia Patel Builders Akshar Construction
It.No Description Unit Quantity T-6 T-6 T-7 T-7 T-8 T-8 T-9 T-9
Rate Amount Rate Amount Rate Amount Rate Amount
31 sft 16 - 18 - 23.1 - 25.3 -
36 rft 12 - 12 - 12 - 11 -
rft 12.5 - 15 - 16 - 16 -
rft 1000 13 13,000 18 18,000 19 19,000 20 20,000
41 rft 15 - 21 - 10 - 32 -
42 rft 21 - 35 - 35 - 230 -
a sft 13 - 23 - 28 - 17 -
sft 1200 11 13,200 25 30,000 29 34,800 15 18,000
b sft 10 - 20 - 18 - 16 -
45 sft 22 - 15 - 16 - 30 -
46 rft 2000 10 20,000 18 36,000 25 50,000 50 100,000
Page:4
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
Vadher Builders VJ Chotalia Patel Builders Akshar Construction
It.No Description Unit Quantity T-6 T-6 T-7 T-7 T-8 T-8 T-9 T-9
Rate Amount Rate Amount Rate Amount Rate Amount
48 a rft 10 - - 38 - 60 -
b rft 1400 10 14,000 - 38 53,200 50 70,000
49 sft 24 - 20 - 80 - 75 -
50 0 10
51 0 10
57 sft 4 - 5 - 5 - 2.8 -
58 sft 40000 3 120,000 4 160,000 3.5 140,000 6 240,000
60 a rft 3 - 2.5 - 6 - 12 -
b rft 2000 1.75 3,500 3 6,000 7 14,000 10 20,000
61 a rft 2 - 5 - 12 - 12 -
b rft 6000 2.25 13,500 10 60,000 10 60,000 15 90,000
c rft 2.5 - 12 - 8 - 30 -
Page:5
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
Vadher Builders VJ Chotalia Patel Builders Akshar Construction
It.No Description Unit Quantity T-6 T-6 T-7 T-7 T-8 T-8 T-9 T-9
Rate Amount Rate Amount Rate Amount Rate Amount
66 rft 0 - 5 - - -
67 rft 0 - 7 - - -
73 a rft 3 - 5 - 7 - 10 -
b rft 3.5 - 8 - 9 - 11 -
Page:6
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
Vadher Builders VJ Chotalia Patel Builders Akshar Construction
It.No Description Unit Quantity T-6 T-6 T-7 T-7 T-8 T-8 T-9 T-9
Rate Amount Rate Amount Rate Amount Rate Amount
76 a sft 0 - 9 - - -
b sft 8 - 13 - 7.5 - 35 -
79 a rft 14 - 18 - 15 - 50 -
b rft 14 - 18 - 15 - 50 -
81 rft 0 - 5 - - -
Page:7
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
Vadher Builders VJ Chotalia Patel Builders Akshar Construction
It.No Description Unit Quantity T-6 T-6 T-7 T-7 T-8 T-8 T-9 T-9
Rate Amount Rate Amount Rate Amount Rate Amount
85 sft 21 - 9 - 9 - 20 -
86 rft 0 - 12 - - -
89 MT 5000 - - - -
90 sft 500 - - - -
91 rft 10 - - - -
92 rft 8 - - - -
Page:8
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
Vadher Builders VJ Chotalia Patel Builders Akshar Construction
It.No Description Unit Quantity T-6 T-6 T-7 T-7 T-8 T-8 T-9 T-9
Rate Amount Rate Amount Rate Amount Rate Amount
H Steel Fabrication - - - -
Page:9
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
Vadher Builders VJ Chotalia Patel Builders Akshar Construction
It.No Description Unit Quantity T-6 T-6 T-7 T-7 T-8 T-8 T-9 T-9
Rate Amount Rate Amount Rate Amount Rate Amount
Discount ( - ) % 0 - 0.0118 124,550.8
Page:10
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
11%
Page:11
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
Page:12
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
11%
Page:13
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
11%
11%
Page:14
Date of Opening:11.2.02
BAPS Swaminarayan Temple, Gondal
Tender For Construction Of New Guesthouse
Revised Comparative Statement
Date :19.2.02
Page:15
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
1 Excavation with backfill:
a upto 6' cft 13,000 0 0 2 26,000 2.5 32,500 4.5 58,500
b 6 to 12' cft 2,000 - 0 2.5 5,000 3.25 6,500 8.5 17,000
c above 12' cft 0 0 0 - 0 - 0 -
-
d incl.dewatering - upto 6' cft 8,000 0 2.5 20,000 2.5 20,000 9.5 76,000
e 6 to 12' cft 2,000 0 3 6,000 3.4 6,800 12 24,000
f above 12' cft 0 0 0 - 0 - 0 -
-
2 Back fill - excavated spoil -
a cft 10,000 0.7 7000 1.25 12,500 2.2 22,000 3.5 35,000
b cft 30,000 0.7 21000 3.5 105,000 2.4 72,000 6 180,000
c sand filling cft 1,800 0.7 1260 1.25 2,250 2.6 4,680 7 12,600
-
3 Dept Labour -
M no 0 80 0 160 - 140 - 0 -
F no 0 80 0 150 - 130 - 0 -
-
4 Foundation concrete -
a BBCC cft 0 3.5 0 3 - 6.1 - 0 -
b PCC cft 700 4 2800 25 17,500 6.5 4,550 15 10,500
-
5 Rubble soling cft 0 0 0 - 0 - 0 -
-
6 Floor concrete -
a BBCC sft 0 2 0 3 - 5.05 - 0 -
b PCC sft 5,400 2 10800 12 64,800 7.4 39,960 8 43,200
46721142.xls Page 16
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
-
7 skilled no 0 200 0 300 - 250 - 0 -
M no 0 80 0 160 - 140 - 0 -
F no 0 80 0 150 - 130 - 0 -
-
8 Masonary - upto PL -
a Brick masonary - upto pl cft 2100 3.25 6825 6 12,600 5.9 12,390 8 16,800
c Ruble masonary - upto pl cft 0 0 0 - 0 - 0 -
-
-
9 Masonary - above PL 9" TH. -
a Brick - upto 12' (FLOOR HT.) 9000 3.5 31500 6 54,000 6.1 54,900 10 90,000
b Brick - 10 to 15' sft 0 3.85 0 0 - 0 - 0 -
c Ruble - upto 10' sft 0 0 0 - 0 - 0 -
d Ruble - 10 to 15' sft 0 0 0 - 0 - 0 -
-
10 Partition wall sft 1500 2.5 3750 4.5 6,750 4.5 6,750 10 15,000
-
-
11 Perapate wall 0 -
a 9" thick rft 400 35 14000 60 24,000 16 6,400 110 44,000
b 4.5" thick rft 0 35 0 0 - 15 - 0 -
c 3" thick rft 0 35 0 0 - 0 - 0 -
-
12 D/W frame fixing 0 -
a with masonary 50 80 4000 100 5,000 80 4,000 125 6,250
b after masonary 50 90 4500 100 5,000 190 9,500 150 7,500
46721142.xls Page 17
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
-
13 Fixing grill sft 0 4 0 0 - 0 - 0 -
14 Compound Gate fixing sft 200 6 1200 25 5,000 20 4,000 15 3,000
-
15 R/W pipe no 8 10 80 25 200 10 80 15 120
16 Cement grill sft 0 6 0 20 - 10 - 15 -
-
17 Load wall 0 0 0 0 - 0 -
-
18 skilled labour no 0 200 0 300 - 250 - 0 -
M no 0 80 0 160 - 140 - 0 -
F no 0 80 0 150 - 130 - 0 -
Palakh no 0 125 0 180 - 200 - 0 -
-
-
Price increase for each floor 0 -
height in % % 10% 0 0% 15% 20% -
19 D/W -frame & shutter 0 -
a Panel sft 2000 0 0 - 0 - 75 150,000
b Composite sft 0 0 0 - 0 - 0 -
c Fixed glazing sft 300 0 0 - 0 - 75 22,500
-
20 Vantilators sft 50 0 0 - 0 - 60 3,000
21 Grill work sft 1100 0 0 - 0 - 15 16,500
-
22 Glass fixing sft 0 0 0 - 0 - 0 -
23 Skilled no 0 0 0 - 0 - 0 -
46721142.xls Page 18
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
Unskilled no 0 0 0 - 0 - 0 -
-
24 RCC works - R,F & C - -
25 Basement slab sft 0 7 0 0 - 0 - 0 -
-
26 Florr slab at PL sft 0 7 0 0 - 0 - 0 -
27 GF slab sft 5800 7 40600 21 121,800 19.8 114,840 40 232,000
-
28 FF slab sft 5700 7.7 43890 26 148,200 22.8 129,960 50 285,000
29 SF slab sft 160 8.4 1344 30.5 4,880 25.1 4,016 60 9,600
-
-
30 GF sloping slab sft 0 10.5 0 25 - 0 - 0 -
31 FF sloping slab sft 0 11.5 0 35 - 0 - 0 -
- -
32 SF sloping slab sft 0 12.5 0 42 - 0 - 0 -
33 GB / PB cft 1400 28 39200 70 98,000 72 100,800 35 49,000
-
34 Beams - R,F & C cft 2500 28 70000 70 175,000 76 190,000 50 125,000
35 Footing cft 1400 12 16800 40 56,000 40 56,000 50 70,000
-
36 Coping - 9" rft 930 10 9300 20 18,600 20 18,600 30 27,900
- 14" rft 0 12 0 25 - 25 - 0 -
-18" rft 0 14 0 28 - 0 - 0 -
-
37 Columns - PL cft 600 28 16800 70 42,000 150 90,000 40 24,000
38 - above PL cft 1000 28 28000 70 70,000 70 70,000 50 50,000
46721142.xls Page 19
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
-
39 Lintel rft 430 15 6450 30 12,900 25 10,750 25 10,750
40 Raft Fdn cft 0 12 0 0 - 0 - 0 -
-
41 Hidden beam rft 50 6 300 30 1,500 20 1,000 50 2,500
-
42 RCC drop pardi rft 25 0 40 - 40 - 0 -
a 4" sft 0 20 0 40 - 35 - 0 -
UP TO 9" sft 0 20 0 50 - 48 - 0 -
b One face formwork sft 0 15 0 35 - 16 - 0 -
-
43 Weather shed sft 600 10 6000 30 18,000 16 9,600 40 24,000
44 Loft sft 0 10 0 30 - 0 - 0 -
-
45 Galary sft 100 10 1000 30 3,000 25 2,500 50 5,000
46 Patta rft 400 10 4000 10 4,000 30 12,000 50 20,000
-
47 Sunk slab up to 12 sqft only 0 200 0 0 - 0 - 0 -
-
48 a - steps - PL rft 300 35 10500 60 18,000 40 12,000 50 15,000
b - steps above PL rft 250 35 8750 60 15,000 46 11,500 60 15,000
-
49 Stair railing sft 0 20 0 0 - 0 - 0 -
50 Fan hook 0 5 0 18 - 0 - 0 -
51 Swing hook 0 50 0 18 - 0 - 0 -
51A Band Iron Designe tn 0 0 0 - 0 - 0 -
52 skilled no 0 200 0 325 - 250 - 0 -
46721142.xls Page 20
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
unskilled no 0 80 0 210 - 180 - 0 -
-
Price increase for each floor -
height in % % 10% 0 15% 15% 15% -
-
53 a -20mm plaster sft 0 3 0 0 - 0 - 0 -
b - water proof plaster sft 0 3.5 0 0 - 0 - 0 -
54 Mala - single coat sft 11000 3.5 38500 5.5 60,500 6 66,000 12 132,000
-
55 Mala - two coates sft 6400 7 44800 7.25 46,400 6.8 43,520 15 96,000
56 Sandfaced - with spong sft 5000 7 35000 6.3 31,500 6.5 32,500 15 75,000
-
57 Sand faced - one coat sft 0 3.5 0 0 - 0 - 0 -
58 Rough plaster sft 2600 2.75 7150 5 13,000 4.8 12,480 10 26,000
-
59 Tapak - patti rft 500 2 1000 10 5,000 15 7,500 15 7,500
-
60 a - 1/2" groove rft 500 1.5 750 10 5,000 7 3,500 15 7,500
b - 1" groove rft 0 1.5 0 0 - 0 - 15 -
-
61 a - 3" patta rft 1000 0 10 10,000 7 7,000 40 40,000
b - 6" patta rft 1000 0 10 10,000 9 9,000 60 60,000
c - 9" Patta rft 0 0 10 - 0 - 0 -
-
62 Ceiling plaster sft 11000 3.25 35750 5.75 63,250 7 77,000 15 165,000
63 3 - side beams etc plaster sft 3000 4 12000 8 24,000 7.8 23,400 15 45,000
-
46721142.xls Page 21
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
64 4 - side beams etc plaster sft 0 4 0 0 - 0 - 0 -
65 Skirting zari filling rft 1500 1.5 2250 8 12,000 5 7,500 10 15,000
-
66 Vata rft 0 0 0 0 - 0 -
67 Hole filling rft 0 0 0 - 0 - 0 -
-
68 skilled 0 200 0 300 - 250 - 0 -
M no 0 80 0 160 - 140 - 0 -
F no 0 80 0 150 - 130 - 0 -
Palakh no 0 125 0 180 - 200 - 0 -
-
Price increase for each floor 0 -
height in % % 10% 0 15% 15% 10% -
-
69 Wall tiles sft 2600 15 39,000 0 - 9 23,400
-
70 a - PK stone - hand cut sft 0 10 - 0 - 0 -
b - PK stone machine cut sft 0 10 - 0 - 0 -
-
71 PK skirting rft 0 10 - 0 - 0 -
72 Mosaictiles - floor sft 0 0 - 0 - 0 -
-
73 a - Mosaic skirting rft 0 0 - 0 - 0 -
b - Sk with groove rft 0 0 - 0 - 0 -
-
74 a - Steps riser rft 550 25 13,750 0 - 20 11,000
b - Trade rft 550 25 13,750 0 - 20 11,000
46721142.xls Page 22
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
-
75 ceramics tiles dedo (vitrifide) sft 10000 15 150,000 0 - 10 100,000
75A 1500 15 22,500 0 12 18,000
-
76 a - PK Dado sft 0 0 - 0 - 0 -
b - Granite /marble dado sft 300 25 7,500 0 - 20 6,000
-
77 a - Marble etc. flooring sft 0 20 - 0 - 0 -
b - above dado sft 0 25 - 0 - 0 -
c - above skirting sft 0 23 - 0 - 0 -
-
78 a - machine cut - It 77 sft 0 22 - 0 - 0 -
b- above dado sft 0 27 - 0 - 0 -
c - above skirting sft 0 23 - 0 - 0 -
-
79 a - marble tread rft 0 32 - 0 - 0 -
b - marble riser rft 0 32 - 0 - 0 -
-
80 a - stone patti rft 0 13 - 0 - 0 -
b -above machine cut rft 0 13 - 0 - 0 -
-
81 patti in flooring rft 0 0 - 0 - 0 -
-
-
82 a- rough stone sft 0 8 - 0 - 0 -
b- above- handcut sft 0 9 - 0 - 0 -
-
46721142.xls Page 23
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
83 a -soap disc no 0 0 - 0 - 0 -
b- above in tiles no 0 0 - 0 - 0 -
-
84 a- china mosaic sft 5000 18 90,000 0 - 25 125,000
b- above patta rft 400 18 7,200 0 - 30 12,000
c - above vata rft 400 18 7,200 0 - 35 14,000
-
85 Terrazo sft 0 0 - 0 - 0 -
86 Above steps rft 0 0 - 0 - 0 -
-
87 stone partitions sft 0 40 - 0 - 0 -
-
88 skilled no 0 375 - 0 - 0 -
M no 0 180 - 0 - 0 -
F no 0 180 - 0 - 0 -
-
Price increase for each floor -
height in % % 10% 15% 0% 10% -
-
Increase in price for biger
size stone % 10% 17% 0% 20% -
-
89 Fabrication MT 0 0 - 0 - 0 -
90 roof covering (G.I. sheet) sft 0 0 - 0 - 0 -
roof covering (A.C. sheet) sft 0 0 - 0 - 0 -
91 ridge fixing (G.I.) rft 0 0 - 0 - 0 -
ridge fixing (A.C.) rft 0 0 - 0 - 0 -
46721142.xls Page 24
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
92 gutter fixing (G.I.) rft 0 0 - 0 - 0 -
gutter fixing (A.C.) rft 0 0 - 0 - 0 -
46721142.xls Page 25
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
H Steel Fabrication - - - -
Discount ( - ) % - - - -
46721142.xls Page 26
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
1 Excavation with backfill:
a upto 6' cft 13,000 0 0 2 26,000 2.5 32,500 4.5 58,500
b 6 to 12' cft 2,000 - 0 2.5 5,000 3.25 6,500 8.5 17,000
c above 12' cft 0 0 0 - 0 - 0 -
-
d incl.dewatering - upto 6' cft 8,000 0 2.5 20,000 2.5 20,000 9.5 76,000
e 6 to 12' cft 2,000 0 3 6,000 3.4 6,800 12 24,000
f above 12' cft 0 0 0 - 0 - 0 -
-
2 Back fill - excavated spoil -
a cft 10,000 0.7 7000 1.25 12,500 2.2 22,000 3.5 35,000
b cft 30,000 0.7 21000 3.5 105,000 2.4 72,000 6 180,000
c sand filling cft 1,800 0.7 1260 1.25 2,250 2.6 4,680 7 12,600
-
3 Dept Labour -
M no 0 80 0 160 - 140 - 0 -
F no 0 80 0 150 - 130 - 0 -
-
4 Foundation concrete -
a BBCC cft 0 3.5 0 3 - 6.1 - 0 -
b PCC cft 700 4 2800 25 17,500 6.5 4,550 15 10,500
-
5 Rubble soling cft 0 0 0 - 0 - 0 -
-
6 Floor concrete -
a BBCC sft 0 2 0 3 - 5.05 - 0 -
b PCC sft 5,400 2 10800 12 64,800 7.4 39,960 8 43,200
46721142.xls Page 27
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
-
7 skilled no 0 200 0 300 - 250 - 0 -
M no 0 80 0 160 - 140 - 0 -
F no 0 80 0 150 - 130 - 0 -
-
8 Masonary - upto PL -
a Brick masonary - upto pl cft 2100 3.25 6825 6 12,600 5.9 12,390 8 16,800
c Ruble masonary - upto pl cft 0 0 0 - 0 - 0 -
-
-
9 Masonary - above PL 9" TH. -
a Brick - upto 12' (FLOOR HT.) 9000 3.5 31500 6 54,000 6.1 54,900 10 90,000
b Brick - 10 to 15' sft 0 3.85 0 0 - 0 - 0 -
c Ruble - upto 10' sft 0 0 0 - 0 - 0 -
d Ruble - 10 to 15' sft 0 0 0 - 0 - 0 -
-
10 Partition wall sft 1500 2.5 3750 4.5 6,750 4.5 6,750 10 15,000
-
-
11 Perapate wall 0 -
a 9" thick rft 400 35 14000 60 24,000 16 6,400 110 44,000
b 4.5" thick rft 0 35 0 0 - 15 - 0 -
c 3" thick rft 0 35 0 0 - 0 - 0 -
-
12 D/W frame fixing 0 -
a with masonary 50 80 4000 100 5,000 80 4,000 125 6,250
b after masonary 50 90 4500 100 5,000 190 9,500 150 7,500
46721142.xls Page 28
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
-
13 Fixing grill sft 0 4 0 0 - 0 - 0 -
14 Compound Gate fixing sft 200 6 1200 25 5,000 20 4,000 15 3,000
-
15 R/W pipe no 8 10 80 25 200 10 80 15 120
16 Cement grill sft 0 6 0 20 - 10 - 15 -
-
17 Load wall 0 0 0 0 - 0 -
-
18 skilled labour no 0 200 0 300 - 250 - 0 -
M no 0 80 0 160 - 140 - 0 -
F no 0 80 0 150 - 130 - 0 -
Palakh no 0 125 0 180 - 200 - 0 -
-
-
Price increase for each floor 0 -
height in % % 10% 0 0% 15% 20% -
19 D/W -frame & shutter 0 -
a Panel sft 2000 0 0 - 0 - 0 -
b Composite sft 0 0 0 - 0 - 0 -
c Fixed glazing sft 300 0 0 - 0 - 0 -
-
20 Vantilators sft 50 0 0 - 0 - 0 -
21 Grill work sft 1100 0 0 - 0 - 0 -
-
22 Glass fixing sft 0 0 0 - 0 - 0 -
23 Skilled no 0 0 0 - 0 - 0 -
46721142.xls Page 29
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
Unskilled no 0 0 0 - 0 - 0 -
-
24 RCC works - R,F & C - -
25 Basement slab sft 0 7 0 0 - 0 - 0 -
-
26 Florr slab at PL sft 0 7 0 0 - 0 - 0 -
27 GF slab sft 5800 7 40600 21 121,800 19.8 114,840 40 232,000
-
28 FF slab sft 5700 7.7 43890 26 148,200 22.8 129,960 50 285,000
29 SF slab sft 160 8.4 1344 30.5 4,880 25.1 4,016 60 9,600
-
-
30 GF sloping slab sft 0 10.5 0 25 - 0 - 0 -
31 FF sloping slab sft 0 11.5 0 35 - 0 - 0 -
- -
32 SF sloping slab sft 0 12.5 0 42 - 0 - 0 -
33 GB / PB cft 1400 28 39200 70 98,000 72 100,800 35 49,000
-
34 Beams - R,F & C cft 2500 28 70000 70 175,000 76 190,000 50 125,000
35 Footing cft 1400 12 16800 40 56,000 40 56,000 50 70,000
-
36 Coping - 9" rft 930 10 9300 20 18,600 20 18,600 30 27,900
- 14" rft 0 12 0 25 - 25 - 0 -
-18" rft 0 14 0 28 - 0 - 0 -
-
37 Columns - PL cft 600 28 16800 70 42,000 150 90,000 40 24,000
38 - above PL cft 1000 28 28000 70 70,000 70 70,000 50 50,000
46721142.xls Page 30
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
-
39 Lintel rft 430 15 6450 30 12,900 25 10,750 25 10,750
40 Raft Fdn cft 0 12 0 0 - 0 - 0 -
-
41 Hidden beam rft 50 6 300 30 1,500 20 1,000 50 2,500
-
42 RCC drop pardi rft 25 0 40 - 40 - 0 -
a 4" sft 0 20 0 40 - 35 - 0 -
UP TO 9" sft 0 20 0 50 - 48 - 0 -
b One face formwork sft 0 15 0 35 - 16 - 0 -
-
43 Weather shed sft 600 10 6000 30 18,000 16 9,600 40 24,000
44 Loft sft 0 10 0 30 - 0 - 0 -
-
45 Galary sft 100 10 1000 30 3,000 25 2,500 50 5,000
46 Patta rft 400 10 4000 10 4,000 30 12,000 50 20,000
-
47 Sunk slab up to 12 sqft only 0 200 0 0 - 0 - 0 -
-
48 a - steps - PL rft 300 35 10500 60 18,000 40 12,000 50 15,000
b - steps above PL rft 250 35 8750 60 15,000 46 11,500 60 15,000
-
49 Stair railing sft 0 20 0 0 - 0 - 0 -
50 Fan hook 0 5 0 18 - 0 - 0 -
51 Swing hook 0 50 0 18 - 0 - 0 -
51A Band Iron Designe tn 0 0 0 - 0 - 0 -
52 skilled no 0 200 0 325 - 250 - 0 -
46721142.xls Page 31
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
unskilled no 0 80 0 210 - 180 - 0 -
-
Price increase for each floor -
height in % % 10% 0 15% 15% 15% -
-
53 a -20mm plaster sft 0 3 0 0 - 0 - 0 -
b - water proof plaster sft 0 3.5 0 0 - 0 - 0 -
54 Mala - single coat sft 11000 3.5 38500 5.5 60,500 6 66,000 12 132,000
-
55 Mala - two coates sft 6400 7 44800 7.25 46,400 6.8 43,520 15 96,000
56 Sandfaced - with spong sft 5000 7 35000 6.3 31,500 6.5 32,500 15 75,000
-
57 Sand faced - one coat sft 0 3.5 0 0 - 0 - 0 -
58 Rough plaster sft 2600 2.75 7150 5 13,000 4.8 12,480 10 26,000
-
59 Tapak - patti rft 500 2 1000 10 5,000 15 7,500 15 7,500
-
60 a - 1/2" groove rft 500 1.5 750 10 5,000 7 3,500 15 7,500
b - 1" groove rft 0 1.5 0 0 - 0 - 15 -
-
61 a - 3" patta rft 1000 0 10 10,000 7 7,000 40 40,000
b - 6" patta rft 1000 0 10 10,000 9 9,000 60 60,000
c - 9" Patta rft 0 0 10 - 0 - 0 -
-
62 Ceiling plaster sft 11000 3.25 35750 5.75 63,250 7 77,000 15 165,000
63 3 - side beams etc plaster sft 3000 4 12000 8 24,000 7.8 23,400 15 45,000
-
46721142.xls Page 32
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
64 4 - side beams etc plaster sft 0 4 0 0 - 0 - 0 -
65 Skirting zari filling rft 1500 1.5 2250 8 12,000 5 7,500 10 15,000
-
66 Vata rft 0 0 0 0 - 0 -
67 Hole filling rft 0 0 0 - 0 - 0 -
-
68 skilled 0 200 0 300 - 250 - 0 -
M no 0 80 0 160 - 140 - 0 -
F no 0 80 0 150 - 130 - 0 -
Palakh no 0 125 0 180 - 200 - 0 -
-
Price increase for each floor 0 -
height in % % 10% 0 15% 15% 10% -
-
69 Wall tiles sft 2600 15 39,000 0 - 9 23,400
-
70 a - PK stone - hand cut sft 0 10 - 0 - 0 -
b - PK stone machine cut sft 0 10 - 0 - 0 -
-
71 PK skirting rft 0 10 - 0 - 0 -
72 Mosaictiles - floor sft 0 0 - 0 - 0 -
-
73 a - Mosaic skirting rft 0 0 - 0 - 0 -
b - Sk with groove rft 0 0 - 0 - 0 -
-
74 a - Steps riser rft 550 25 13,750 0 - 20 11,000
b - Trade rft 550 25 13,750 0 - 20 11,000
46721142.xls Page 33
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
-
75 ceramics tiles dedo (vitrifide) sft 10000 15 150,000 0 - 10 100,000
75A 1500 15 22,500 0 12 18,000
-
76 a - PK Dado sft 0 0 - 0 - 0 -
b - Granite /marble dado sft 300 25 7,500 0 - 20 6,000
-
77 a - Marble etc. flooring sft 0 20 - 0 - 0 -
b - above dado sft 0 25 - 0 - 0 -
c - above skirting sft 0 23 - 0 - 0 -
-
78 a - machine cut - It 77 sft 0 22 - 0 - 0 -
b- above dado sft 0 27 - 0 - 0 -
c - above skirting sft 0 23 - 0 - 0 -
-
79 a - marble tread rft 0 32 - 0 - 0 -
b - marble riser rft 0 32 - 0 - 0 -
-
80 a - stone patti rft 0 13 - 0 - 0 -
b -above machine cut rft 0 13 - 0 - 0 -
-
81 patti in flooring rft 0 0 - 0 - 0 -
-
-
82 a- rough stone sft 0 8 - 0 - 0 -
b- above- handcut sft 0 9 - 0 - 0 -
-
46721142.xls Page 34
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
83 a -soap disc no 0 0 - 0 - 0 -
b- above in tiles no 0 0 - 0 - 0 -
-
84 a- china mosaic sft 5000 18 90,000 0 - 25 125,000
b- above patta rft 400 18 7,200 0 - 30 12,000
c - above vata rft 400 18 7,200 0 - 35 14,000
-
85 Terrazo sft 0 0 - 0 - 0 -
86 Above steps rft 0 0 - 0 - 0 -
-
87 stone partitions sft 0 40 - 0 - 0 -
-
88 skilled no 0 375 - 0 - 0 -
M no 0 180 - 0 - 0 -
F no 0 180 - 0 - 0 -
-
Price increase for each floor -
height in % % 10% 15% 0% 10% -
-
Increase in price for biger
size stone % 10% 17% 0% 20% -
-
89 Fabrication MT 0 0 - 0 - 0 -
90 roof covering (G.I. sheet) sft 0 0 - 0 - 0 -
roof covering (A.C. sheet) sft 0 0 - 0 - 0 -
91 ridge fixing (G.I.) rft 0 0 - 0 - 0 -
ridge fixing (A.C.) rft 0 0 - 0 - 0 -
46721142.xls Page 35
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
92 gutter fixing (G.I.) rft 0 0 - 0 - 0 -
gutter fixing (A.C.) rft 0 0 - 0 - 0 -
D Wood works - -
46721142.xls Page 36
MANUBHAI LALABHAI CHANDRAKANT D. DALAL
MAHESH BHAI VALJI BHAI PATEL MU. HALOL, 137, PRABHU KUNJ.
SAVANI 89/ NATASHA, NR, JYOTINAGAR-35, SOCIETY, OPP. SHRIMALI
CHANI JAKAT NAKA, PH. KANAZARI ROAD. WADI, PH. 02672 243076,
Un 9998054695 PH.9925210682 9327711085
It.No Description it Quantity Rate Amount T-1 T-1 T-2 T-2 T-2 T-2
Rate Amount Rate Amount Rate Amount
H Steel Fabrication - - - -
Discount ( - ) % - - - -
46721142.xls Page 37
TENDER
PROJECT: SAPUTARA
SCHEDULED
IT. NO. DESCRIPTION UNIT RATE AMOUNT R.A.Quantity R.A. Amount
Quantity
A EARTH WORK
1 Excavation with backfill:
EXCAVATION IN LINE AND LEVEL AND ANYTYPE OF SOIL/LAND UP TO 6'0"
DEPTH AS PER THE DRAWING AND AS DIRECTED BY ENGINEER IN CHARGE
a INCLUDING SPRADING/DUMPING THE EXCAVTED SOIL AS DIRECTED BY
ENGINEER INCHARGE
SCHEDULED
IT. NO. DESCRIPTION UNIT RATE AMOUNT R.A.Quantity R.A. Amount
Quantity
B R.C.C. WORK
3 Floor concrete (THIS SHALL BE IN PANNEL OF LESS THAN 70 SQ.FT. AREA
COMPACTED 4" TO 6"TH. P.C.C. IN M15 WITHOUT STEEL AS PER THE
DRAWING IN LINE AND LEVEL WITH COMPECTION, WATERING REQUIRED ETC.
COMPLETE AS DIRECTED BY ENGINEER INCHARGE P.C.C. 4" TH. OR AS PER
a THE DETAIL GIVEN IN 1:2:4 OR 1:3:6 IN FLOOR IN LINE AND LEVEL INCLUDING
COMPECTION WATERING REQUIRED ETC. COMPLETE AS PER THE DIRECTION
OF ENGINEER INCHARGE
sft 2000 7 14000
b DO- AS ABOVE M 20 WITH NOMINAL STEEL AT FLOOR LEVEL sft 8,000 10 80000
AS PER THE STRUCTURAL DRAWINGS REINFORED CEMENT CONCRETE WORK
IN 1:1½:3 OR 1:2:4 INCLUDING REQUIRED APPROVED SHUTTERING,
REINFORCEMENT PLACING, BINDING, CONCRETING WITH 10/7 CONCRETE
MIXER ON SITE, USING VIBRATOR FOR COMPECTION,REQUIRED GOODS LIFT
1 OR ANY OTHER MACHINARY, FINISHING IN LINE AND LEVEL, CURING FOR
SPECIFIED DAYS, ROUGHNING THE PLASTER SURFACE WITH TANCHA ETC.
COMPLETE IN THE DIRECTION OF ENGINEER INCHARGE FOR ALL THE
FOLLOWING CONCRETE ITEMS: CONSIDER FOR FLOOR HT. AS PER DISIGN
2 FOR SLAB ABOVE BASEMENT FLOOR UP TO GROUND FLOOR sft 3,500 23 80500
3 FOR SLAB ABOVE GROUND FLOOR sft 6,000 26 156000
4 F F SLAB ABOVE GROUND FLOOR SLAB ( WITH STAGING) sft 2,000 30 60000
5 DO- (WITH FULL HEIGHT PROP) sft 2,000 35 70000
6 FOR GROUND BEAM / PLINTH BEAM cft 400 60 24000
7 FOR BEAMS AT GROUND FLOOR / SLAB LEVEL ALL LEVEL ANY SHAPE & SIZE cft 2,000 60 12000
8 BEAMS AT FIRST FLOOR SLAB LEVEL cft 2,000 66 13200
9 FOR FOOTING cft 350 50 17500
10 FOR COPING : M20 AS PER DRAWING AT ANY LEVEL
rft 400 35 14000
FOR COLUMNS UP TO GROUND FLOOR SLAB LEVEL PLINTH INCLUDING
11 PADESTAL ANY SIZE SHAPE. cft 500 60 30000
12 COLUMN ABOVE GROUND FLOOR SLAB cft 800 66 52800
13 FOR COLUMNS ABOVE PLINTH ALL LEVEL ANY SIZE & SHAPE cft 2,000 60 12000
14 FOR LINTELS ALL LEVEL ANY SIZE & SHAPE AS PER DRAWING rft 500 35 17500
15 FOR HIDDEN OR SLAB BEAM(BEAM INERT IN SLAB) ALL LEVELS rft 100 20 2000
16 FOR DROP PARDI ALL LEVEL ANY SIZE & SHAPE rft 100 35 3500
17 FOR PARDI ABOVE 6" TO 9" TH. ALL LEVEL ANY SIZE & SHAPE sft 400 35 14000
SCHEDULED
IT. NO. DESCRIPTION UNIT RATE AMOUNT R.A.Quantity R.A. Amount
Quantity
SCHEDULED
IT. NO. DESCRIPTION UNIT RATE AMOUNT R.A.Quantity R.A. Amount
Quantity
C PLASTER WORK
4
12mm TO 20mm THICK PLASTER IN 1:4 SMOOTH NERU/CHUNA FINISHING IN
LINE AND LEVEL INCLUDING RACKING JOINTS AND WATERING BEFORE
25 PLASTERING AT ALL PLACES AND LEVELS INCLUDING CURING OF PLASTERED
SURFACE ETC. COMPLETE AS DIRECTED BY ENGINEER INCHARGE
sft
12mm TO 20mm THICK WATER PROOF PLASTER IN 1:4 IN LINE AND LEVEL
INCLUDING RACKING JOINTS AND WATERING BEFORE PLASTERING AT ALL
26 PLACES AND LEVELS INCLUDING CURING OF PLASTERED SURFACE ETC.
COMPLETE AS DIRECTED BY ENGINEER INCHARGE
sft
12mm TO 20mm THICK SINGLE COAT MALA OR CEMENT OR NEERU PLASTER
UP TO GROUND FLOOR SLAB LEVL IN 1:4 IN LINE AND LEVEL INCLUDING
RACKING JOINTS AND WATERING BEFORE PLASTERING AT ALL PLACES AND
27
LEVELS INCLUDING CURING OF PLASTERED SURFACE ETC. COMPLETE AS
DIRECTED BY ENGINEER INCHARGE
sft 6,000 8 48000
12mm TO 20mm THICK SINGLE COAT AND IF REQUIRED WIRED ROUGH
PLASTER IN 1:4 IN LINE AND LEVEL INCLUDING RACKING JOINTS AND
28 WATERING BEFORE PLASTERING AT ALL PLACES AND LEVELS INCLUDING
CURING OF PLASTERED SURFACE ETC. COMPLETE AS DIRECTED BY
ENGINEER INCHARGE
sft 1,000 8 8000
29 DO-DO AS ABOVE GROUND FLOOR INCLUDIG TARRACE sft 6,000 8.8 52800
20mm THICK DOUBLE COAT MALA PLASTER OR DOUBLE COAT SAND FACED
PLASTER UP TO GROUND FLOOR SLAB LEVEL IN 1:4 IN LINE AND LEVEL
30 INCLUDING RACKING JOINTS AND WATERING BEFORE PLASTERING AT ALL
PLACES AND LEVELS INCLUDING CURING OF PLASTERED SURFACE ETC.
COMPLETE AS DIRECTED BY ENGINEER INCHARGE
sft 6,000 10 60000
31 DO-D0 AS ABOVE GROUND FLOOR INCLUDIG TARRACE sft 6,000 11 66000
32 TAPAK PATTI MIN 1" WIDE rft 500 7 3500
33 a - 1/2" X 1/2" GROOVE/ GISSI rft 500 4 2000
12mm THICK PLASTER IN 1:4 MALA/NERU/CHUNA FINISHING FOR CEILING
/BEAMS/COLUMNS/CHHAJJA ETC. IN LINE AND LEVEL INCLUDING RACKING
34 JOINTS AND WATERING BEFORE PLASTERING AT ALL PLACES AND LEVELS
INCLUDING CURING OF PLASTERED SURFACE ETC. COMPLETE AS DIRECTED
BY ENGINEER INCHARGE
sft 9,000 9 81000
SCHEDULED
IT. NO. DESCRIPTION UNIT RATE AMOUNT R.A.Quantity R.A. Amount
Quantity
SCHEDULED
IT. NO. DESCRIPTION UNIT RATE AMOUNT R.A.Quantity R.A. Amount
Quantity
D BRICK WORK
5 BRICK MASONARY UP TO PLINTH
BRICK MASONARY UP TO PLINTH FROM FOUNDATION OR GROUND BEAM AS
PER THE DETAIL IN 1:6 OR AS DIRECTED IN LINE AND LEVEL INCLUDING
a REQUIRED SCAFFOLDING, WATERING ETC. COMPLETE AS PER THE
DIRECTION OF ENGINEER INCHARGE
cft
SCHEDULED
IT. NO. DESCRIPTION UNIT RATE AMOUNT R.A.Quantity R.A. Amount
Quantity
AMOUNT
A Earthworks 200850
B R C C works 854500
C Plastering works 379300
D BRICKS WORKS 109550
I/WE confirm having read and understood the terms and conditions, specifications and codes, architectural and structural drawings with its details
and instructions for the construction work of a B.A.P.S. Temple at Saputara, and here by agree to execute legal documents accordingly in the state
of Gujarat.
I/We hereby agree to execute any and all the changes as may be directed by the consultants M/s Akshar Techno, Ahmedabad,
through drawings/ designs/ revisions/ additions/ ommissions/ alterations/ issued, in any form either written or verble or through their