Schedule of operating action

(example)
Daily
• Start raw water pumps
• Check pH and chlorine levels and record
• Check pH/flow readings and record
• Check water flocculation and record pH
• Check stirring chemicals in make up tanks
• Make up chemicals in tanks, if required
• Backwash filter as required
• Check that dosing pumps are pumping
• Check the chlorine dosing rate and record
• Start high lift pumps

Weekly
• Do all daily checks
• Backwash filters
• Flush the dosing line with acid