No: 41.01.09/ Petrobangla Date: 1-2/12/2010 (from 8:00 to 8:00)


Production & Marketing Division Gas in MMCFD
3, Kawran Bazar, Dhaka-1215 Units: Condensate/NGL in BBLD
LPG in Kg
Daily Gas & Condensate Production and Distribution Report
I. Production III. LPG Production
Gas No.of Produc Production Production Pro.as a % of Pro.as a % of
Company Fields ing Wells Capacity Gas Condensate T.Cap(Gas) T. Prod(Gas)
Titas 14 420 400.1 369.0 20.0 20.9 NGL To Production
Bakhrabad 4 34 33.7 20.0 1.6 1.7 LPG Plant LPG MS
Habiganj 9 240 261.9 14.0 1.7 1.8 603.8 n/a n/a
1. BGFCL
Narsingdi 2 35 31.9 67.5 1.6 1.7
Meghna 0 0 10.0 16.4 0.5 0.5 N-S & RA pipeline
Sub-Total 29 729 737.6 486.9 36.9 38.5 Delivered from N-S pipeline
Sylhet 1 2 9.5 84.6 0.5 0.5 AB 391.7 ,,
Kailashtila #1 2 23 21.4 209.1 1.1 1.1 BB: -1 116.1 ,,
2. SGFL Kailashtila #2 4 74 74.3 641.7 3.7 3.9 BB: - 2 210.4 ,,
Rashidpur 5 53 50.2 52.1 2.5 2.6 VS3: 31.5 ,,
Beanibazar 2 18 11.5 184.7 0.6 0.6 AM 400.6 ,,
Sub-Total 14 170 167.0 1172.2 8.3 8.7 Total: 1150.3 mmcfd
Salda 2 11 6.8 4.1 0.3 0.4
Fenchuganj 2 32 23.6 24.0 1.2 1.2 Remarks:
3. BAPEX
Shahbazpur 1 15 0.0 0.0 0.0 0.0
Sub-Total 5 58 30.4 28.1 1.5 1.6
Sub-Total (1+2+3) 48 957 935.0 1687.2 46.8 48.8
4. IOCs
CAIRN Sangu* 6 35 11.9 0.1 0.6 0.6
Jalalabad 4 230 124.3 1022.4 6.2 6.5
CHEVRON Maulavibazar 4 75 53.6 6.1 2.7 2.8
Bibiyana 12 600 679.5 3257.6 34.0 35.5
NIKO Feni 1 3 0.0 0.0 0.0 0.0
TULLOW Bangura 4 100 110.1 370.0 5.5 5.8
Sub-Total 31 1043 979.4 4656.2 49.0 51.2
Grand Total (1+2+3+4): 79 2000 1914.4 6343.4 95.7 100.0
II. Company-wise Distribution
Power Fertilizer
Company Power Plants Demand Supply Company Max.Demand Supply Others-Supl. Total
Ashuganj (610 MW) 160.0 114.0 AFCL 52.0 52.1 Remarks:
Ghorasal (845 MW)* 185.0 53.9 JFCL 45.0 34.9
Siddhirganj (190 MW) 48.0 0.0 UFFL 45.0 40.4 *APS unit 1, 3, 4 shutdown.
Siddhirganj (120X2 MW) 20.0 20.3 PUFF 14.0 14.5 *GPS unit 2, 3, 4, 6 shutdown.
Haripur (SBU 96 MW) 25.0 20.8 *NEPC is being operated by L.F.
1. TGTDCL Haripur(NEPC)110 MW 20.0 0.0 *SPS 190 MW shutdown.
Haripur P. P. 360 MW 55.0 54.8 *Meghna 450 MW GT-2 shutdown.
Meghna P. P. 450 MW 75.0 38.2
Tongi (105 MW) 25.0 16.3
RPCL (210 MW) 35.0 18.4
Madhabdi REB 35 MW 7.2 4.4 Total TGTDCL Power (including
Ashulia REB 45 MW 9.6 6.8 non-grid power) = 410.9
Tangail 22 MW SIPP 4.8 3.6
Narsingdi 22 MW SIPP 4.8 3.5
Maona 33 MW SIPP 7.5 6.4
Rupganj, N'ganj-SIPP (33) 7.5 6.1 Total TGTDCL (including
Sub-Total 689.4 367.4 156.0 141.8 837.1 1346.3 non-grid power) = 1389.8
Rauzan(2x180 MW) 90.0 0.0 CUFL 52.0 45.1 4.5 Remarks:
2. BGSL Sikalbaha (40 MW) 11.0 0.0 KAFCO 63.0 48.9 167.1 *Rauzan shutdown.
Sikalbaha (150 MW)* 38.0 0.0 *Sikalbaha (40 MW) shutdown.
Comilla REB 24 MW 5.0 4.7 *Sikalbaha (150 MW) shutdown.
Feni-22 MW SIPP 4.8 4.7 Total BGSL Power (including
Mohipal-11 MW SIPP 2.4 2.3 non-grid power) = 26.8
Barabkunda 22 MW SIPP 5.0 3.5
Jangalia-33 MW SIPP 7.5 6.1 Total BGSL (including
Sub-Total 163.7 21.3 115.0 94.0 171.7 287.0 non-grid power) = 292.5
Shahjibazar 2x30 MW 16.8 24.9 NGFF 18.0 0.3 Remarks:
S.Bazar 3 yrs rental 50 MW 7.2 6.7
S.Bazar 15 yrs rent 86 MW 19.2 14.8
Fenchuganj CC1 90 MW 16.8 16.1
Fenchuganj CC2 90 MW* 0.0 0.0 *Fenchuganj CC 2 shutdown
3. JGTDSL Kumargaon 20 MW 4.8 0.0 *F.ganj 3 yrs rent 50 MW shutdown.
K.gaon 3 yrs rent 50 MW 9.6 10.9 *NGFF shutdown for
K.gaon 15 yrs rent 10 MW 2.4 1.9 maintenance work.
Habiganj 11 MW SIPP 2.4 2.2
F.ganj 15 yrs rent 50 MW 10.0 6.7
F.ganj 3 yrs rent 50 MW* 7.5 0.0
Sub-Total 96.7 84.2 18.0 0.3 41.2 125.7
Westmont 70 MW 22.0 16.6 Remarks:
4. PGCL Baghabari (100+71 MW) 47.0 48.1
Bogra 15 yrs rent (20 MW) 4.8 4.6
Ullapara 11 MW SIPP 2.4 1.6
Sub-Total 76.2 70.9 0.0 17.0 87.9
5. BAPEX Bhola 3 yrs rent 34.5 MW 10.0 0.0 0 0.0 0.0
Total : 1036.0 543.8 289.0 236.2 1067.0 1847.0
Non-Grid Power : 848.3 (Considering diversity factor 0.85)
Meghna Energy 1.0
Rahim Energy 8.1 Remarks :
TGTDCL Unique Power 7.5
Alpha Power 40.0 1.7
Shah Power 2.5
CSI Power 6.0
Abdul Monem Power 2.9
Malancha Holdings 7.3
A. S. M. Power 1.7
Partex Energy 3.0
Everest Power 1.9
Sub-Total 40.0 43.5 43.5
BGSL Malancha Hold.45 MW 5.6 5.6
Total Non-Grid Power : 49.1 49.1
Grand Total 1076.0 592.9 289.0 236.2 1067.0 1896.0
% of Total Distribution 31.3 12.5 56.3 100
Copy to:
1. Chairman, Petrobangla.
2. Chairman/Member (Generation), BPDB (Fax: 9564765 / 9551093 / 9551296).
3. Director (Finance/PSC/Operation & Mines/Planning), Petrobangla. (Signed by)
4. PS to Hon' ble State Minister, Ministry of Power, Energy & Mineral Resources (Fax: 7170464). General Manager
5. PS to Secretary, Energy & Mineral Resources Division, MOEMR (Fax: 7161110). Production & Marketing Div.
6. Chevron/ CAIRN /Hydrocarbon Unit/ IT Dept.(www. petrobangla.org.bd) Tel: 9132092
2:23 PM

No: 41.01.09/ Petrobangla Date: 30/11-1/12/2010 (from 8:00 to 8:00)


Production & Marketing Division Gas in MMCFD
3, Kawran Bazar, Dhaka-1215 Units: Condensate/NGL in BBLD
LPG in Kg
Daily Gas & Condensate Production and Distribution Report
I. Production III. LPG Production
Gas No.of Produc Production Production Pro.as a % of Pro.as a % of
Company Fields ing Wells Capacity Gas Condensate T.Cap(Gas) T. Prod(Gas)
Titas 14 420 399.2 366.0 20.0 21.0 NGL To Production
Bakhrabad 4 34 33.7 20.0 1.6 1.7 LPG Plant LPG MS
Habiganj 9 240 260.7 13.3 1.7 1.8 647.8 n/a n/a
1. BGFCL
Narsingdi 2 35 31.9 67.5 1.6 1.7
Meghna 0 0 10.0 21.8 0.5 0.5 N-S & RA pipeline
Sub-Total 29 729 735.6 488.6 36.8 38.7 Delivered from N-S pipeline
Sylhet 1 2 9.8 79.3 0.5 0.5 AB 392.8 ,,
Kailashtila #1 2 23 14.7 141.9 0.7 0.8 BB: -1 119.0 ,,
2. SGFL Kailashtila #2 4 74 75.8 634.6 3.8 4.0 BB: - 2 209.4 ,,
Rashidpur 5 53 50.2 52.4 2.5 2.6 VS3: 26.8 ,,
Beanibazar 2 18 11.3 183.7 0.6 0.6 AM 401.4 ,,
Sub-Total 14 170 161.8 1091.9 8.1 8.5 Total: 1149.5 mmcfd
Salda 2 11 6.6 4.0 0.3 0.3
Fenchuganj 2 32 23.5 21.5 1.2 1.2 Remarks:
3. BAPEX
Shahbazpur 1 15 0.0 0.0 0.0 0.0
Sub-Total 5 58 30.1 25.5 1.5 1.6
Sub-Total (1+2+3) 48 957 927.5 1606.0 46.4 48.8
4. IOCs
CAIRN Sangu* 6 35 11.9 0.4 0.6 0.6
Jalalabad 4 230 122.2 1101.6 6.1 6.4
CHEVRON Maulavibazar 4 75 54.2 6.7 2.7 2.8
Bibiyana 12 600 671.6 3162.2 33.6 35.3
NIKO Feni 1 3 0.0 0.0 0.0 0.0
TULLOW Bangura 4 100 113.7 376.0 5.7 6.0
Sub-Total 31 1043 973.6 4646.7 48.7 51.2
Grand Total (1+2+3+4): 79 2000 1901.1 6252.7 95.1 100.0
II. Company-wise Distribution
Power Fertilizer
Company Power Plants Demand Supply Company Max.Demand Supply Others-Supl. Total
Ashuganj (610 MW) 160.0 115.5 AFCL 52.0 52.1 Remarks:
Ghorasal (845 MW)* 185.0 53.8 JFCL 45.0 38.8
Siddhirganj (190 MW) 48.0 0.0 UFFL 45.0 40.7 *APS unit 1, 4 shutdown.
Siddhirganj (120X2 MW) 20.0 22.6 PUFF 14.0 14.6 *GPS unit 1, 3, 4, 6 shutdown.
Haripur (SBU 96 MW) 25.0 20.7 *NEPC is being operated by L.F.
1. TGTDCL Haripur(NEPC)110 MW 20.0 0.0 *SPS 190 MW shutdown.
Haripur P. P. 360 MW 55.0 54.4 *Meghna 450 MW GT-2 shutdown.
Meghna P. P. 450 MW 75.0 38.8
Tongi (105 MW) 25.0 19.5
RPCL (210 MW) 35.0 19.8
Madhabdi REB 35 MW 7.2 4.9 Total TGTDCL Power (including
Ashulia REB 45 MW 9.6 7.9 non-grid power) = 420.3
Tangail 22 MW SIPP 4.8 3.5
Narsingdi 22 MW SIPP 4.8 3.5
Maona 33 MW SIPP 7.5 6.0
Rupganj, N'ganj-SIPP (33) 7.5 5.6 Total TGTDCL (including
Sub-Total 689.4 376.5 156.0 146.1 827.6 1350.3 non-grid power) = 1394.0
Rauzan(2x180 MW) 90.0 0.0 CUFL 52.0 45.0 4.3 Remarks:
2. BGSL Sikalbaha (40 MW) 11.0 0.0 KAFCO 63.0 47.6 158.1 *Rauzan shutdown.
Sikalbaha (150 MW)* 38.0 0.0 *Sikalbaha (40 MW) shutdown.
Comilla REB 24 MW 5.0 4.8 *Sikalbaha (150 MW) shutdown.
Feni-22 MW SIPP 4.8 4.4 Total BGSL Power (including
Mohipal-11 MW SIPP 2.4 1.8 non-grid power) = 27.5
Barabkunda 22 MW SIPP 5.0 4.4
Jangalia-33 MW SIPP 7.5 5.4 Total BGSL (including
Sub-Total 163.7 20.8 115.0 92.6 162.4 275.8 non-grid power) = 282.6
Shahjibazar 2x30 MW 16.8 24.6 NGFF 18.0 0.3 Remarks:
S.Bazar 3 yrs rental 50 MW 7.2 6.9
S.Bazar 15 yrs rent 86 MW 19.2 17.7
Fenchuganj CC1 90 MW 16.8 15.7
Fenchuganj CC2 90 MW* 0.0 0.0 *Fenchuganj CC 2 shutdown
3. JGTDSL Kumargaon 20 MW 4.8 0.0 *F.ganj 3 yrs rent 50 MW shutdown.
K.gaon 3 yrs rent 50 MW 9.6 9.8 *NGFF shutdown for
K.gaon 15 yrs rent 10 MW 2.4 2.1 maintenance work.
Habiganj 11 MW SIPP 2.4 2.4
F.ganj 15 yrs rent 50 MW 10.0 9.6
F.ganj 3 yrs rent 50 MW* 7.5 0.0
Sub-Total 96.7 88.9 18.0 0.3 38.6 127.8
Westmont 70 MW 22.0 17.6 Remarks:
4. PGCL Baghabari (100+71 MW) 47.0 48.9
Bogra 15 yrs rent (20 MW) 4.8 4.8
Ullapara 11 MW SIPP 2.4 1.7
Sub-Total 76.2 73.0 0.0 17.0 90.0
5. BAPEX Bhola 3 yrs rent 34.5 MW 10.0 0.0 0 0.0 0.0
Total : 1036.0 559.2 289.0 239.0 1045.6 1843.9
Non-Grid Power : 848.3 (Considering diversity factor 0.85)
Meghna Energy 1.1
Rahim Energy 7.3 Remarks :
TGTDCL Unique Power 7.4
Alpha Power 40.0 2.8
Shah Power 2.4
CSI Power 5.9
Abdul Monem Power 2.9
Malancha Holdings 7.5
A. S. M. Power 2.1
Partex Energy 3.0
Everest Power 1.5
Sub-Total 40.0 43.7 43.7
BGSL Malancha Hold.45 MW 6.8 6.8
Total Non-Grid Power : 50.5 50.5
Grand Total 1076.0 609.7 289.0 239.0 1045.6 1894.4
% of Total Distribution 32.2 12.6 55.2 100
Copy to:
1. Chairman, Petrobangla.
2. Chairman/Member (Generation), BPDB (Fax: 9564765 / 9551093 / 9551296).
3. Director (Finance/PSC/Operation & Mines/Planning), Petrobangla. (Signed by)
4. PS to Hon' ble State Minister, Ministry of Power, Energy & Mineral Resources (Fax: 7170464). General Manager
5. PS to Secretary, Energy & Mineral Resources Division, MOEMR (Fax: 7161110). Production & Marketing Div.
6. Chevron/ CAIRN /Hydrocarbon Unit/ IT Dept.(www. petrobangla.org.bd) Tel: 9132092
12:49 PM

No: 41.01.09/ Petrobangla Date: 29-30/11/2010 (from 8:00 to 8:00)


Production & Marketing Division Gas in MMCFD
3, Kawran Bazar, Dhaka-1215 Units: Condensate/NGL in BBLD
LPG in Kg
Daily Gas & Condensate Production and Distribution Report
I. Production III. LPG Production
Gas No.of Produc Production Production Pro.as a % of Pro.as a % of
Company Fields ing Wells Capacity Gas Condensate T.Cap(Gas) T. Prod(Gas)
Titas 14 420 404.8 375.0 20.2 20.8 NGL To Production
Bakhrabad 4 34 33.7 20.0 1.6 1.6 LPG Plant LPG MS
Habiganj 9 240 259.3 13.1 1.7 1.7 584.9 n/a n/a
1. BGFCL
Narsingdi 2 35 31.9 66.1 1.6 1.6
Meghna 0 0 10.0 21.7 0.5 0.5 N-S & RA pipeline
Sub-Total 29 729 739.7 495.9 37.0 38.0 Delivered from N-S pipeline
Sylhet 1 2 10.0 78.2 0.5 0.5 AB 406.3 ,,
Kailashtila #1 2 23 20.6 200.9 1.0 1.1 BB: -1 119.2 ,,
2. SGFL Kailashtila #2 4 74 74.7 687.4 3.7 3.8 BB: - 2 212.8 ,,
Rashidpur 5 53 50.2 53.3 2.5 2.6 VS3: 23.9 ,,
Beanibazar 2 18 11.5 186.9 0.6 0.6 AM 403.2 ,,
Sub-Total 14 170 166.9 1206.8 8.3 8.6 Total: 1165.4 mmcfd
Salda 2 11 6.9 3.8 0.3 0.4
Fenchuganj 2 32 23.3 22.0 1.2 1.2 Remarks:
3. BAPEX
Shahbazpur 1 15 0.0 0.0 0.0 0.0
Sub-Total 5 58 30.2 25.8 1.5 1.6
Sub-Total (1+2+3) 48 957 936.9 1728.5 46.8 48.2
4. IOCs
CAIRN Sangu* 6 35 11.9 0.2 0.6 0.6
Jalalabad 4 230 126.6 1087.2 6.3 6.5
CHEVRON Maulavibazar 4 75 53.2 63.3 2.7 2.7
Bibiyana 12 600 695.6 3524.8 34.8 35.8
NIKO Feni 1 3 0.0 0.0 0.0 0.0
TULLOW Bangura 4 100 120.9 399.0 6.0 6.2
Sub-Total 31 1043 1008.3 5074.5 50.4 51.8
Grand Total (1+2+3+4): 79 2000 1945.1 6803.0 97.3 100.0
II. Company-wise Distribution
Power Fertilizer
Company Power Plants Demand Supply Company Max.Demand Supply Others-Supl. Total
Ashuganj (610 MW) 160.0 116.9 AFCL 52.0 51.7 Remarks:
Ghorasal (845 MW)* 185.0 74.3 JFCL 45.0 35.6
Siddhirganj (190 MW) 48.0 0.0 UFFL 45.0 39.3 *APS unit 1, 4 shutdown.
Siddhirganj (120X2 MW) 20.0 24.4 PUFF 14.0 14.6 *GPS unit 2, 4, 6 shutdown.
Haripur (SBU 96 MW) 25.0 20.7 *NEPC is being operated by L.F.
1. TGTDCL Haripur(NEPC)110 MW 20.0 0.0 *SPS 190 MW shutdown.
Haripur P. P. 360 MW 55.0 52.3 *Meghna 450 MW GT-2 shutdown.
Meghna P. P. 450 MW 75.0 38.0
Tongi (105 MW) 25.0 11.7
RPCL (210 MW) 35.0 19.7
Madhabdi REB 35 MW 7.2 4.7 Total TGTDCL Power (including
Ashulia REB 45 MW 9.6 7.3 non-grid power) = 431.0
Tangail 22 MW SIPP 4.8 4.0
Narsingdi 22 MW SIPP 4.8 3.4
Maona 33 MW SIPP 7.5 6.5
Rupganj, N'ganj-SIPP (33) 7.5 6.1 Total TGTDCL (including
Sub-Total 689.4 389.9 156.0 141.3 816.0 1347.1 non-grid power) = 1388.2
Rauzan(2x180 MW) 90.0 0.0 CUFL 52.0 45.0 4.1 Remarks:
2. BGSL Sikalbaha (40 MW) 11.0 0.0 KAFCO 63.0 46.5 168.8 *Rauzan shutdown.
Sikalbaha (150 MW)* 38.0 0.0 *Sikalbaha (40 MW) shutdown.
Comilla REB 24 MW 5.0 5.1 *Sikalbaha (150 MW) shutdown.
Feni-22 MW SIPP 4.8 4.5 Total BGSL Power (including
Mohipal-11 MW SIPP 2.4 2.4 non-grid power) = 28.3
Barabkunda 22 MW SIPP 5.0 4.6
Jangalia-33 MW SIPP 7.5 6.2 Total BGSL (including
Sub-Total 163.7 22.8 115.0 91.5 172.9 287.2 non-grid power) = 292.7
Shahjibazar 2x30 MW 16.8 23.3 NGFF 18.0 0.0 Remarks:
S.Bazar 3 yrs rental 50 MW 7.2 7.6
S.Bazar 15 yrs rent 86 MW 19.2 18.4
Fenchuganj CC1 90 MW 16.8 15.9
Fenchuganj CC2 90 MW* 0.0 0.0 *Fenchuganj CC 2 shutdown
3. JGTDSL Kumargaon 20 MW 4.8 0.0 *F.ganj 3 yrs rent 50 MW shutdown.
K.gaon 3 yrs rent 50 MW 9.6 10.8 *NGFF shutdown for
K.gaon 15 yrs rent 10 MW 2.4 1.9 maintenance work.
Habiganj 11 MW SIPP 2.4 2.4
F.ganj 15 yrs rent 50 MW 10.0 10.8
F.ganj 3 yrs rent 50 MW* 7.5 0.0
Sub-Total 96.7 91.1 18.0 0.0 40.8 131.9
Westmont 70 MW 22.0 17.7 Remarks:
4. PGCL Baghabari (100+71 MW) 47.0 45.9
Bogra 15 yrs rent (20 MW) 4.8 4.8
Ullapara 11 MW SIPP 2.4 1.7
Sub-Total 76.2 70.0 0.0 17.0 87.0
5. BAPEX Bhola 3 yrs rent 34.5 MW 10.0 0.0 0 0.0 0.0
Total : 1036.0 573.9 289.0 232.7 1046.6 1853.3
Non-Grid Power : 848.3 (Considering diversity factor 0.85)
Meghna Energy 0.6
Rahim Energy 7.9 Remarks :
TGTDCL Unique Power 7.0
Alpha Power 40.0 2.2
Shah Power 1.8
CSI Power 4.8
Abdul Monem Power 2.8
Malancha Holdings 6.8
A. S. M. Power 1.6
Partex Energy 3.6
Everest Power 1.9
Sub-Total 40.0 41.1 41.1
BGSL Malancha Hold.45 MW 5.5 5.5
Total Non-Grid Power : 46.6 46.6
Grand Total 1076.0 620.5 289.0 232.7 1046.6 1899.9
% of Total Distribution 32.7 12.3 55.1 100
Copy to:
1. Chairman, Petrobangla.
2. Chairman/Member (Generation), BPDB (Fax: 9564765 / 9551093 / 9551296).
3. Director (Finance/PSC/Operation & Mines/Planning), Petrobangla. (Signed by)
4. PS to Hon' ble State Minister, Ministry of Power, Energy & Mineral Resources (Fax: 7170464). General Manager
5. PS to Secretary, Energy & Mineral Resources Division, MOEMR (Fax: 7161110). Production & Marketing Div.
6. Chevron/ CAIRN /Hydrocarbon Unit/ IT Dept.(www. petrobangla.org.bd) Tel: 9132092