Task 1 - Distributed Matching Network: Yongzhen Chen Yi He
Task 1 - Distributed Matching Network: Yongzhen Chen Yi He
Yi He
50 Ω
ZIN = 50 Ω
Shunt shorted T-line
Stud of length L2
ZL = 20 + j20 Ω
TLINE
Z=50 ohm TLSC TL1
R=20 ohm
TL2 Z=50 ohm
Z=50 ohm L1=0.153 λ
L2=0.084λ F=2.45GHz
F=2.45GHz
feasibility
Z L 20 j 20
zL 0.4 j 0.4
ZR 50
2. Find then on chart
1 0.4 j 0.4 0.4 j 0.4
1.25 j1.25
0.4 j 0.4 0.4 0.4
2 2
0.32
at point A, extend OA to OA’ on the periphery and read 0.432λ on the
‘wavelength towards generator’ scale.
And at point B, extend OB to OB’ on the periphery and read 0.181λ on
the ‘wavelength towards generator’ scale.
Appendix
3. Rotate until g = 1
Draw a line through point C to C’, and read 0.334 on the ‘wavelength
towards generator’ scale.
Read bin = -1.15, so we have yin = 1 + j(-1.15) = 1 – j1.15.
z1 =Find
4. L1from
0.334 0.181the angle
= 0.153
1 2 z1 2(2 / )(0.153 ) 0.612
4 L
2 L or L1 1 0.612 0.153