Power Generated from Jegurupadu (Phase-III) will be evacuated through 3(three) 400 kV transmission lines,
connected via two winding GSUT, BAT10.
All equipment required for 400 kV air-insulated switchyard, comprising of Two (2) Main Buses with one and
a half circuit breaker scheme will consist of the following bays with 25 mm/kV creepage, see reference 1.3
[2] for details.
• 2 No. Generator Transformer Bays
• 3 No.s Line Bays
The switchyard control and protection will be housed in switchyard control building. Synchronization of all
line breakers will be available from switchyard control room. Synchronization of Generator bay circuit
breakers will be normally available from GT control system.
For detailed operation refer 1.3 [6]