Status:
D 21.02.07 According to MOM at 13th TCM held between NTPC and PM/ORGRES dt
02.02.07-10.02.07
C 10.01.07 Crossreferences, Fire protection changes included
B 06.09.06 NTPC Ref. No.: CC:PES:9518:1082:21:959 Date: 30.06.2006. PM transmittal #1521 dated 15.08.2006
A 19.05.06 First submission
Rev. Date Description Drwn. Chkd. Appd.
SIPAT SUPER THERMAL POWER PROJECT STAGE - I (3 x 660 MW)
CONTRACT: MAIN PLANT TURNKEY PACKAGE (PART - B)
Customer
NATIONAL THERMAL POWER CORPORATION Ltd.
(A Government of India Enterprise)
EPC Contractor:
OJSC “POWER MACHINES”
NTPC document No: 9518-108-28-RU-PVI-G-057
Designed by: Format: A4 Total Pages: 11
Function Date Name Signature
Approved: 19.05.06 Borodkin
Checked: 19.05.06 Butenko
Drawn: 19.05.06 Gainullin
Date: 19.02.07
Revision: D
Sheet: 1
Contractor document No: SI1-1-TG-I-08-MAJ-0010
Sheets: 1
Subcontractor name: Document title:
Branch of Centre of Engineering UESR, JSC
FSG "Vacuum System". Logic diagrams for Step Logic
Firm Control.
ORGRES
Subcontractor file:
SI1-1-TG-I-08-MAJ-0010-D-drw.vsd
Sheet: 1 Sheets: 1
PROJECT: Page:
SIPAT SUPER THERMAL POWER PROJECT STAGE - I Description FSG "Vacuum System". Logic diagrams for Step Logic Control.
(3x660 MW) Pages: 1

CONTRACT: Contractor No SI1-1-TG-I-08-MAJ-0010 Date: 19.02.07


Main Plant Turnkey Package (Part - B) NTPC No 9518-108-28-RU-PVI-G-057 Format: A4
CAD file SI1-1-TG-I-08-MAJ-0010-D-drw.vsd Rev: D
From previous step

Step execution
criteria

Override step criteria


(jump to next step)
Tw= OVR CRT NNN Step command
Tm=

To next step

NNN – step number


Tw= -- step criteria waiting time, sec/min
Tm= -- step command monitoring time, sec/min

PROJECT: Page:
SIPAT SUPER THERMAL POWER PROJECT STAGE - I Description FSG "Vacuum System".
Step
Logic
logic
diagrams
macro. for Step Logic Control.
(3x660 MW) Pages: 1

CONTRACT: Contractor No SI1-1-TG-I-08-MAJ-0010 Date: 19.02.07


Main Plant Turnkey Package (Part - B) NTPC No 9518-108-28-RU-PVI-G-057 Format: A4
CAD file SI1-1-TG-I-08-MAJ-0010-D-drw.vsd Rev: D
10MAJ20AP001ZP12
10MAJ30AP001ZP12
10MAJ20AP001ZP15
OR
10MAJ30AP001ZP15
10MAJ20AP001ZP14
OR
10MAJ30AP001ZP14
10PAB10CP001XQ10
GT
10PAB10CP001XM11
10PAB20CP001XQ10
GT
10PAB20CP001XM11
10PAB30CP001XQ10
GT AND
10PAB30CP001XM11
10PAB40CP001XQ10
GT
10PAB40CP001XM11
10LCA06CP001XQ10 GT 2V3
10LCA06CP002XQ10
10LCA06CP003XQ10
10LCA06CP001XM11

10PCB40CP001XQ10 GT 1V2
10PCB40CP002XQ10
AND
10PCB40CP001XM11
SI1-1-TG-G-50-MYY-0140(FC-T01)
2 p23 10MAA00EU312-XK21
SI1-1-TG-G-50-MYY-0140(FC-T01) OR
3 p23 10MAA00EU312SZT01
SI1-1-TG-G-50-MYY-0140(FC-T01) AND S
4 p23 10MAA00EU322-XK21 10MAJ00EU100ZP01 1
SI1-1-TG-G-50-MYY-0140(FC-T01) OR R
5 p23 10MAA00EU322SZT01 10MAJ00EU100 1p8

10MAW10CP001XQ10 10MAJ00EU100 1p9


GT
10MAW10CP001XM11
10MAW10CT001XQ10 GT 1V2
10MAW10CT002XQ10
10MAW10CT001XM11
10MAJ00EU100XS50 S
R

10MAJ00EU100XS01
OR S
1 2p8 10MAY00EU205ZP01
SI1-1-TG-I-08-MAY-0015 Tp=1s R

SB-1

PROJECT: Page: 4
SIPAT SUPER THERMAL POWER PROJECT STAGE - I Description 10MAJ00EU100 «Vacuum System» Startup Program
(3x660 MW) Pages: 1

CONTRACT: Contractor No SI1-1-TG-I-08-MAJ-0010 Date: 19.02.07


Main Plant Turnkey Package (Part - B) NTPC No 9518-108-28-RU-PVI-G-057 Format: A4
CAD file SI1-1-TG-I-08-MAJ-0010-D-drw.vsd Rev: D
10MAJ09AA101ZP01
10MAJ09AA102ZP01

OR SB-1

3 p14 10MYY00EZ180ZP73 SI1-1-TG-I-08-MAY-0003


SI1-1-TG-I-08-MAY-0003 OR
4 p78a 10MYY00EZ181ZP73

1 2p7 10MAJ00EU104ZP01
10MAJ00EU100XS02
2 2p9 10MAJ00EU109ZP01

PROJECT: Page: 5
SIPAT SUPER THERMAL POWER PROJECT STAGE - I Description 10MAJ00EU100 «Vacuum System» Startup Program
(3x660 MW) Pages: 1

CONTRACT: Contractor No SI1-1-TG-I-08-MAJ-0010 Date: 19.02.07


Main Plant Turnkey Package (Part - B) NTPC No 9518-108-28-RU-PVI-G-057 Format: A4
CAD file SI1-1-TG-I-08-MAJ-0010-D-drw.vsd Rev: D
SI1-1-TG-I-08-MAY-0003
Tw= OVR CRT 1 10MAJ00EU101_ZP01 1
Tm=60s 10MAJ09AA101 3p273
10MAJ09AA102 3p274
10MAJ20AA101 4p275
10MAJ30AA101 4p276

10MAJ09AA101ZP02
10MAJ09AA102ZP02
10MAJ20AA101ZP02
AND
10MAJ30AA101ZP02
10MAJ20AP001ZP15
10MAK10AE001ZP11

10MAJ20AP001ZP14 SI1-1-TG-I-08-MAY-0003
Tw= OVR CRT 2 10MAJ00EU102_ZP01 2
Tm=5s 10MAJ20AP001 1p278

p-7

PROJECT: Page: 5
6
SIPAT SUPER THERMAL POWER PROJECT STAGE - I Description 10MAJ00EU100
"«Vacuum System»
«VacuumFG
System»
Startup"
Startup
Program
Program
(3x660 MW) Pages: 1

CONTRACT: Contractor No SI1-1-TG-I-08-MAJ-0010 Date: 19.02.07


Main Plant Turnkey Package (Part - B) NTPC No 9518-108-28-RU-PVI-G-057 Format: A4
CAD file SI1-1-TG-I-08-MAJ-0010-D-drw.vsd Rev: D
p-6

10MAJ30AP001ZP15
10MAJ09AA101ZP02
10MAJ09AA102ZP02
AND
10MAJ20AA101ZP02
10MAJ30AA101ZP02
10MAK10AE001ZP11

10MAJ30AP001ZP14

SI1-1-TG-I-08-MAY-0003

Tw= OVR CRT 3 10MAJ00EU103_ZP01 1


Tm=5s 10MAJ30AP001 1p277

10MAJ20AP001ZP11
OR Td=300s
10MAJ30AP001ZP11 AND
10MAW10AA101ZP02
10MAW10AA101ZP01 SI1-1-TG-I-08-MAY-0003
Tw= OVR CRT 4 10MAJ00EU104_ZP01 2
Tm=5s 10MAJ20AP001 2p278
10MAJ30AP001 2p277
10MAJ00EU100 1p5

10MAJ30CE022XQ10
LE
10MAJ30CE022XM02 AND
10MAJ30AA101ZP01
10MAJ20AP001ZP14

SB-2

SI1-1-TG-I-08-MAY-0003
Tw= OVR CRT 5 10MAJ00EU105_ZP01 3
Tm=5s 10MAJ20AP001 3p278

p-8

PROJECT: Page: 5
7
SIPAT SUPER THERMAL POWER PROJECT STAGE - I Description 10MAJ00EU100
"«Vacuum System»
«VacuumFG
System»
Startup"
Startup
Program
Program
(3x660 MW) Pages: 1

CONTRACT: Contractor No SI1-1-TG-I-08-MAJ-0010 Date: 19.02.07


Main Plant Turnkey Package (Part - B) NTPC No 9518-108-28-RU-PVI-G-057 Format: A4
CAD file SI1-1-TG-I-08-MAJ-0010-D-drw.vsd Rev: D
p-7

10MAW10AA101ZP01
10MAJ30AP001ZP14
10MAJ20CE022XQ10 AND
LE
10MAJ20CE022XM02
10MAJ20AP001ZP11
SB-3
10MAJ20AA101ZP01
10MAJ30AP001ZP11
SI1-1-TG-I-08-MAY-0003
Tw= OVR CRT 6 10MAJ00EU106_ZP01 1
Tm=5s 10MAJ30AP001 3p277

10MAJ30CE022XQ10
LE
10MAJ30CE022XM02

AND
SB-2 S
1 1p4 10MAJ00EU100ZP01 R
OR

10MAJ30AA101ZP01

10MAG10CP002XQ10 LT 2V3
10MAG10CP003XQ10
10MAG10CP004XQ10
10MAG10CP002XM12 AND
10MAG20CP002XQ10 LT 2V3
10MAG20CP003XQ10
10MAG20CP004XQ10
10MAG20CP002XM12

10MAJ20AP001ZP15
SI1-1-TG-I-08-MAY-0003
Tw= OVR CRT 7 10MAJ00EU107_ZP01 2
Tm=5s 10MAJ20AP001 4p278

p-9

PROJECT: Page: 5
8
SIPAT SUPER THERMAL POWER PROJECT STAGE - I Description 10MAJ00EU100
"«Vacuum System»
«VacuumFG
System»
Startup"
Startup
Program
Program
(3x660 MW) Pages: 1

CONTRACT: Contractor No SI1-1-TG-I-08-MAJ-0010 Date: 19.02.07


Main Plant Turnkey Package (Part - B) NTPC No 9518-108-28-RU-PVI-G-057 Format: A4
CAD file SI1-1-TG-I-08-MAJ-0010-D-drw.vsd Rev: D
p-8
10MAJ30AP001ZP15

10MAJ20AP001ZP11
10MAJ20AA101ZP01
10MAJ30AP001ZP11
10MAJ30AA101ZP01
AND
SB-3 S
1 1p4 10MAJ00EU100ZP01 R
OR

10MAG10CP002XQ10 LT 2V3
10MAG10CP003XQ10
10MAG10CP004XQ10
10MAG10CP002XM12
10MAG20CP002XQ10 LT 2V3
10MAG20CP003XQ10
10MAG20CP004XQ10
10MAG20CP002XM12

AND
SI1-1-TG-I-08-MAY-0003
Tw= OVR CRT 8 10MAJ00EU108_ZP01 1
Tm=5s 10MAJ30AP001 4p277

AND
10MAJ20CE022XQ10
LE
10MAJ20CE022XM02 AND
OR
10MAJ30CE022XQ10
LE
10MAJ30CE022XM02
AND

10MAJ20AP001ZP12
AND
10MAJ20AA101ZP02
OR Tw= OVR CRT 9 10MAJ00EU109_ZP01 2
10MAJ30AP001ZP12
AND Tm= 10MAJ00EU100 2p5
10MAJ30AA101ZP02

PROJECT: Page: 5
9
SIPAT SUPER THERMAL POWER PROJECT STAGE - I Description 10MAJ00EU100
"«Vacuum System»
«VacuumFG
System»
Startup"
Startup
Program
Program
(3x660 MW) Pages: 1

CONTRACT: Contractor No SI1-1-TG-I-08-MAJ-0010 Date: 19.02.07


Main Plant Turnkey Package (Part - B) NTPC No 9518-108-28-RU-PVI-G-057 Format: A4
CAD file SI1-1-TG-I-08-MAJ-0010-D-drw.vsd Rev: D
SI1-1-TG-G-50-MYY-0140(FC-T01)
5 p23 10MAA00EU312-XK21
SI1-1-TG-G-50-MYY-0140(FC-T01) OR
6 p23 10MAA00EU312SZT01
SI1-1-TG-G-50-MYY-0140(FC-T01) AND
7 p23 10MAA00EU322-XK21
SI1-1-TG-G-50-MYY-0140(FC-T01) OR
8 p23 10MAA00EU322SZT01
10LBB51AA001YQ10
LE
10LBB51AA001XM01
10LBB52AA001YQ10
LE
10LBB52AA001XM01
10MAJ20AP001ZP11
OR
10MAJ30AP001ZP11
AND
10MAL10AA103ZP02
10MAL10AA119ZP02
10MAL10AA120ZP02
10MAL30AA130ZP02 AND

10MAJ00EU500XS01
OR S
2 1p12 10MAY00EU555ZP01
SI1-1-TG-I-08-MAY-0015 Tp=1s R

10MAJ09AA101ZP01
OR
10MAJ09AA102ZP01

S
10MAJ00EU500ZP01 1
R
OR

3 p14 10MYY00EZ180ZP73 SI1-1-TG-I-08-MAY-0003


SI1-1-TG-I-08-MAY-0003 OR
4 p78a 10MYY00EZ181ZP73

1 2p11 10MAJ00EU552ZP01
OR
10MAJ00EU500XS02

PROJECT: Page: 10
SIPAT SUPER THERMAL POWER PROJECT STAGE - I Description 10MAJ00EU500 «Vacuum system» Shutdown Program
(3x660 MW) Pages: 1

CONTRACT: Contractor No SI1-1-TG-I-08-MAJ-0010 Date: 19.02.07


Main Plant Turnkey Package (Part - B) NTPC No 9518-108-28-RU-PVI-G-057 Format: A4
CAD file SI1-1-TG-I-08-MAJ-0010-D-drw.vsd Rev: D
SI1-1-TG-I-08-MAY-0003-D-02
Tw= OVR CRT 51 10MAJ00EU551_ZP01 1
Tm=5s 10MAJ20AP001 5p278
10MAJ30AP001 5p277
10MAJ00EL201-A
10MAJ20AP001ZP12 10MAJ00EL201-B
10MAJ20AA101ZP02
AND
10MAJ30AP001ZP12
10MAJ30AA101ZP02

Tw= OVR CRT 52 10MAJ00EU552_ZP01 2


Tm= 10MAJ00EU500 1p10

PROJECT: Page: 11
5
SIPAT SUPER THERMAL POWER PROJECT STAGE - I Description 10MAJ00EU500
"«Vacuum«Vacuum
System» system»
FG Startup"
Shutdown
Program
Program
(3x660 MW) Pages: 1

CONTRACT: Contractor No SI1-1-TG-I-08-MAJ-0010 Date: 19.02.07


Main Plant Turnkey Package (Part - B) NTPC No 9518-108-28-RU-PVI-G-057 Format: A4
CAD file SI1-1-TG-I-08-MAJ-0010-D-drw.vsd Rev: D