The document lists various hydraulic, lubrication, cooling, and descaling systems for a steel mill, including the steckel mill high pressure system, roughing mill lubrication system, roll cooling system, and descaling system. It also provides tentative dates for studying and completing work on these systems, with timelines ranging from 15 days to 1 month and 15 days.
The document lists various hydraulic, lubrication, cooling, and descaling systems for a steel mill, including the steckel mill high pressure system, roughing mill lubrication system, roll cooling system, and descaling system. It also provides tentative dates for studying and completing work on these systems, with timelines ranging from 15 days to 1 month and 15 days.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
The document lists various hydraulic, lubrication, cooling, and descaling systems for a steel mill, including the steckel mill high pressure system, roughing mill lubrication system, roll cooling system, and descaling system. It also provides tentative dates for studying and completing work on these systems, with timelines ranging from 15 days to 1 month and 15 days.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
walking beam furnance hydraulic system roughing mill low pressure system roughing mill high pressure system vertical edger steckel mill low pressure system
steckel mill high pressure system
steckel mill hagc system down coiler hydraulic system
lubrication system
roughing mill morgoil lubrication system
roughing mill screw down drip lubrication system edger gear box lubrication system roughing mill main motor steckel mill morgoil system steckel mill main motor system hot coiler gear box pinch roll gear box down coiler lubrication system cooling water system
roll cooling system
wbf cooling system' instrumentation cooling system coiler cooling
descaling system
laminar cooling system
central grease lubrication system(cgls)
hydraulic system commencementdate of sdate of completion tentative date of co 15-10-2008 27 - 11- 2008 28-11-2008 5/12/2008 5/12/2008 12/12/1008 tative date of completion time alloted for complete study of a system 1 month 15 days 15 day 12/1008