Professional Documents
Culture Documents
Ra For np-4 p-04
Ra For np-4 p-04
Concrete M-35 per Rmt Cum 3304.000 0.183 604.632 S.OR. 2005-2006
Concrete M-35 per Rmt Cum 3304.000 0.183 604.632 S.OR. 2005-2006
0.38
Providing and casting in situ
precast controlled cement
concrete M.350 for
Prestressed concrete work
Cu.M 500-00