Professional Documents
Culture Documents
3.2.23 Atc Wire & Conduit Illustration: DDC Panel
3.2.23 Atc Wire & Conduit Illustration: DDC Panel
120vAC
Notes:
Power
Minimum 3/4" EMT conduit and 20% spare capacity
Label junction boxes ATC
Conduit & Box for vertical riser
and "Primary/Building"
communications cable DDC
Plenum rated wire above ceilings (typical secondary
Panel communications), fastened with wire ties every 24
inches, fasten to the structure every 6 feet in a
Cable Trough workman like manner to avoid a conflict with electrical
or HVAC installations
Plaster ceiling