PROPOSED METHOD STATEMENT FOR WORKS

1. The chilled water piping shall be flushed out with water until the water sample is clear
of debris and contaminants. The chilled water system will be isolated from Chiller, FAHU
and FCUs during flushing process.
2. Chemical shall be added in chilled water system through Chemical Dosing pot as per the
procedure outlined by the Supplier and sample shall be approved by the laboratory
followed by the consultant.
3. Water shall be passed through the system including Chiller, FAHU and FCU after the
required approval of sample.
4. Chiller, FAHU and FCUs supplier shall be called for commissioning of the equipments.
5. All FCU will operate under no control as per the requirement for wild air system.
6. All Guest Rooms must be cleaned from dust and debris so that the filters of FCUs require
minimum maintenance; this should be done before FCUs are started for wild air system.