TA 1bhag

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

bhagawati pandey

Date 26-12-09
bus fair amritsar to hosiyarpur 2-man 180
riksha 50
print out photo copy 75
tie 120
site hwy125 hoh003 160 site clear sign by nsn engg. and bhagawati pande

RG 45 cable 120
date 27-12-09
site hoh013 hoh012 140 hoh013 poll mount not available and power supply given b

date 29-12-09
site hoh006 hoh014 145 site clear sign by nsn engg. and bhagawati pandey

date 2/1/2010
Regarroom 70
Total 1060

vedram patel

Date 26-12-09
bus fair amritsar to hosiyarpur 2-man 180
riksha 50
print out photo copy 75
tie 120
site hwy112 hoh004 260 site hoh112 mcv power shaired with one port in 2 IDU.

RG 45 cable 120
date 27-12-09
site hoh009 hoh002 135 site hoh009 mcv power shaired with port in t

date 29-12-09
site hoh014 hoh008 80 hoh008 idu not in racke

date 2/1/2010
site hoh008 hoh013 90 AT complte engg. Not availabel
Total 1110
and bhagawati pandey

and power supply given by baterry bank (hoh012 power supply given by baterry)

and bhagawati pandey

with one port in 2 IDU.

2 IDU.

You might also like