Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

V I E W

10 Steps for effective


Core Banking System Selection

Core Banking Systems are the backbone of products and infrastructure. For e.g. the IT Requirements for an Investment
services that Banks offer. With technology becoming a value Bank could be very different from that of a Retail Bank, or
differentiator, a wrong system selection may cost tremendous one that aspires to be.
opportunity losses. While there are multiple vendors offering
off-the-shelf packages, each one of them claiming they have a Ensure that the requirements are crafted in detail.
long list of implementations across the globe, one needs to be Requirements could be classified as 'data' requirements (e.g.
careful that the solution fits the Bank's requirement, and this Customer information) or 'processing' requirements (e.g.
is not always easy. Interest Accrual). It is also important to list down all reporting
requirements, and also classify them with their relevant utility-
How does one select the best-fit solution for a Bank in the
regulatory reporting, MIS and Operational reports.
most effective manner? How does one ensure that the
Requirements should also be defined in terms of technical
selection process is made objective, transparent and focused?
parameters and vendor related parameters. Defining all the
Cedar has conducted several Core Banking (and other ERP
requirements in detail is the foundation of a good selection
solutions as well) Selection and Implementation exercises in
process. It is also important to have this done by the business
the region. Based on our earlier experience, we present 10
users, to ensure that this is 'owned' by the business team.
steps for effective selection of Core Banking Systems:

2. Prioritize requirements - first things first:


1. Define business needs - and have them owned:

Not all requirements are equally important, some are more


20% of IT projects reportedly fail to achieve corporate
objectives, wasting $500 billion worldwide. It is critical for critical and need to be prioritized:

Banks to comprehend their business requirements - both


present and future, be it customer demands on products and • Domain level: Some business domains are more critical

services, or compliance requirements for business operations. than others. For instance, Islamic Banking would assume a
Business Strategy determines the imperatives for IT higher priority for Banks that plan to offer Islamic products.
www.cedar-consulting.com

• Unit level: Within a business area, some requirements identifying “whose fault was it” becomes the Bank's
assume higher criticality than others. For e.g. Capturing responsibility.
a customer's name, age and address is more critical than
4. Define Evaluation Criteria - upfront:
his/her family details.
Transparency of evaluation process depends on defining the
It is important to classify requirements by their priority, in
criteria upfront. When these criteria are not defined and
order to differentiate solutions that meet more of 'critical
frozen, there is every chance of being carried away by certain
requirements' from those that cater just the 'nice to have'.
good features of a system or on the contrary, a few limitations
This also ensures that final ranking of vendors is on the basis
overshadowing other features. Decide upfront on weights to
of a Bank's defined criticality rating, not
purely on overall conformance of vendors.

3. Determine sourcing model - what


suits you best?

IT Infrastructure is more than just the


Core Banking software. It involves
selection of multiple ancillary applications
(e.g. Branch automation) and also other
investments in hardware, networking and
third party software. There are two
sourcing models:

• Prime Vendor Model: Identify a one-


stop-shop vendor, for a 'turn-key'
assignment. The vendor is responsible for sourcing, be attached for functional, technical, support and
integration, implementation and providing support for all implementation parameters, chronology of evaluation and
necessary components. The advantage of this model is scoring methodology. It is also important to ensure that the
having a single point of contact, thereby minimizing effort approach to be adopted during the evaluation, and any other
within the Bank. Yet, this tends to be relatively rigid and selection criteria to be considered is decided upfront.
marginally expensive.
5. Manage RFP process - be objective, transparent and
focused:
• Best of Breed Model: Determine applications / IT
components that best suit individual requirement. Choose Simple as it may sound, this can be a really tough balancing
Best of Breed. This has clear cost - benefit advantage over act, between the degree of detail one needs to get into for
the Prime Vendor model, yet exposes to a potential risk of clarifying vendor queries, and the time window available for
“integration cracks”, where diagnosing issues and issuing of RFP, and receipt of their responses. The key factor
www.cedar-consulting.com

should be consistently based on what is documented in the


requirements specification document on 'absolute terms', and
not on 'relative terms'. This is critical to ensure that the
overall ranking is fair and objective.

7. Reference feedback - whom to ask, and what?

Unless conducted diligently, this could turn out to be a


'glorified exhibition'. Reference feedback is critical to make
qualitative judgment on vendors' track record of
implementation and support. The important factor is on
deciding “whom” to get this feedback from. It has to be

here would be to ensure that information is provided to all another Bank that is similar to yours in terms of size,

vendors, thereby enabling that the process is objective and operations and services. The other critical element is in

transparent. determining “what to ask”. Banks stumble upon very


interesting revelations during reference checks. What is the
6. Evaluate solutions - for what 'you want':
point in selecting the “seemingly” most sophisticated solution,
Banks get to review demonstrations once a decade whereas whose existing customers reveal otherwise!
vendors make them for a living. Evaluating solutions for “what
8. Define contractual terms - in detail:
you want” and not what the vendors would like to show-case
is the key to success. In addition to this there are challenges As they say, devil is in the detail! Care needs to be taken to

to be met regarding paucity of time, resources and the need ensure that all that is required to be committed by the

for adherence to scoring process. It is impractical for anyone vendor - in terms of resources, deliverables, timeframe, costs,

to remember a marathon of demonstrations.


Implementation Terms Review
The scoring of vendors should be immediate
Critical Points for consideration, Vendor-1 Illustrative
and consistent. The key aspect to be 1. Project plan is based on 5 days week. This should be modified
Schedule impact
to reflect bank working time for all on-site activities, which is 5.5.
remembered is that 23% of IT projects do day week.
2. Milestone dates for all delivery milestones are not defined. Quality impact
not meet business expectations, due to lack
3. Data mapping activity 80 working days have been reduced to 15 Track changes
of business-IT alignment. It is therefore working days.
4. UAT for Non-CFL release indicated as 2 weeks. This is not Issue practicality
important for Business users to evaluate and practical Bank would require minimum 6 weeks to conduct full UAT
on new fully customized release.
score.
5. UAT Plan preparation (30 working days) activity has been
revised to 15 working days. The UAT Plan preparation would require Specific dates
One should also be careful not to set the 30 days and should begin on April 1, 2005 and would end on May
15, 2005.
goal-post of the second vendor on the basis 6. UAT Sign-off & Live cut over has been shown on the same date,
which is not practical. As discussed and agreed Live cut-over Reflects as discussed
of what one saw in the first vendor's would follow UAT sign-off post parallel run.
presentation! In other words, the evaluation 7. No parallel run indicated for pilot branch, Bank had clearly indicated
Plan to the detail
that there would be 30 working days parallel run for the pilot branch.
dependencies, etc. are clearly articulated. The success of wrong step either in prioritization or selection process can
implementation is directly proportional to the clarity and lead to project overrun.
detail of the vendor agreement.

One also has to ensure here that the contractual terms


are inclusive of all necessary documentation that refer to
the commitment made by the vendor throughout
the evaluation period. This helps in minimizing the
conflicts that are almost likely to occur, due to difference in
understanding of the user team during evaluation and
subsequently, during implementation.

9. Financial terms - read between the lines:

Measuring “Total Cost of Ownership (TCO)” and getting to


compare vendors on “apple-to-apple” terms is indispensable.
On the other hand if you have done the above homework
No negotiation is complete, unless the complete cost of
right, then it is half the job done! One can then be confident
implementation including "hidden costs" and "assumed costs"
that the vendor is the “best-fit” for the Bank and also be
such as internal resources requirement are compiled.
assured that implementation terms are tightly defined.
Cost structures should not be just seen from the software Execution of large IT projects demand senior management
license and implementation point of view. Investments in involvement and enormous commitment, and the efforts
hardware, networking, third party software, Database, invested will be rewarded in the long run.
Operating Systems, and additional investment that might be
Cedar Service Offering in IT Consulting:
required in data cleansing and migration, training, should all
• IT Strategy Development, in alignment with Business
be considered, before arriving at the TCO. Mapping on & off- Strategy • IT Operations Re-alignment
site activities and linking the payment terms to clearly • RFP Development and System Selection
• Implementation Project Management
identified deliverables is also imperative.
• IT Enabled Process Flow Alignment
10. Start your project - with half the job done!

As can be seen in the enclosed figure, timely delivery of the


project is dependent on conformance to 'critical path'. One V. Ramkumar
The author is Principal Consultant,
Asia/Middle East, Cedar Consulting

India Middle East South East Asia / China Cedar Management Consulting Cedar Technomic
703 Nirman Kendra PO Box 41785 10 Windsor Park Hill Road International LLC 118 S. Clinton St., Suite 370
Off E Moses Road 1102, Al Attar Tower Singapore 574200 300 Park Avenue, 17th Floor Chicago, IL60661
Mahalaxmi Al Maktoum Street M + 65 9068 5774 New York, NY 10022, USA T: +1 312-575-9626
Bombay 400 011 Deira, Dubai, UAE E seasia@cedar-consulting.com T + 1 212 5726314 F: +1 312-575-9627
India T +971 4 2210444 F + 1 212 5726499
T +91 22 6661 9800 F +971 4 2249454 E americas@cedar-consulting.com
F +91 22 6661 9801 E middleeast@cedar-consulting.com
E india@cedar-consulting.com
www.cedar-consulting.com
Offices in Principal Cities of the World

You might also like