Professional Documents
Culture Documents
Best Practice For Rack's Power Connectivity
Best Practice For Rack's Power Connectivity
Current Plan
Failure
Point
Failure
Points
1. Extending the Industrial socket will increase the number of failure points.
2. It is advisable to take the output from a DB to the Racks instead of connecting
directly from the same socket of any device. Incase of any short circuit in a specific
Rack , DB will help to isolate that circuit and all other Racks connected to the DB
will not be effected.
Thank You!