Students must design a major piece of equipment identified in Milestone 2 for Milestone 4. The design must include a detailed process design using rigorous and shortcut methods, as well as a mechanical design of the equipment's size, shape, material, and components. Students must also include schematic diagrams, engineering drawings, piping and instrumentation diagrams, cost estimates, and revisions based on previous milestones. The report is due on February 25th, 2011 and cannot exceed 30 pages following specific formatting guidelines.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
Students must design a major piece of equipment identified in Milestone 2 for Milestone 4. The design must include a detailed process design using rigorous and shortcut methods, as well as a mechanical design of the equipment's size, shape, material, and components. Students must also include schematic diagrams, engineering drawings, piping and instrumentation diagrams, cost estimates, and revisions based on previous milestones. The report is due on February 25th, 2011 and cannot exceed 30 pages following specific formatting guidelines.
Students must design a major piece of equipment identified in Milestone 2 for Milestone 4. The design must include a detailed process design using rigorous and shortcut methods, as well as a mechanical design of the equipment's size, shape, material, and components. Students must also include schematic diagrams, engineering drawings, piping and instrumentation diagrams, cost estimates, and revisions based on previous milestones. The report is due on February 25th, 2011 and cannot exceed 30 pages following specific formatting guidelines.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
Students must design a major piece of equipment identified in Milestone 2 for Milestone 4. The design must include a detailed process design using rigorous and shortcut methods, as well as a mechanical design of the equipment's size, shape, material, and components. Students must also include schematic diagrams, engineering drawings, piping and instrumentation diagrams, cost estimates, and revisions based on previous milestones. The report is due on February 25th, 2011 and cannot exceed 30 pages following specific formatting guidelines.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
KC40203 Briefing on Milestone 4: Detailed Process and Mechanical Design
Each student is to design a major equipment identified in MS2.
Without designing a major equipment a student will fail Milestone 4. Detailed Equipment Process Design (Heat and Mass transfer, thermodynamics, chemical reaction, Separation processes) by rigorous and short-cut / quick estimation methods. Without doing rigorous method a student can pass but not score. Mechanical design (based on equipment size calculated by detailed design above): wall thickness, shape, weight, material of construction, nuts and bolts, welding etc. Schematic diagrams of equipment showing the layout of components using standard symbols. Drawing software Autosketch, Solidworks acceptable. Mechanical drawing on key equipment (General Arrangement – Engineering Drawing) Piping & Instrumentation Diagram (Control) Costing Auxiliary Equipment Pumps and Piping Compare with mass and energy balances of MS3 and make revisions. Compare with HAZOP/HAZAN of MS2 and make revisions.
Report Due: Friday 25th Feb 2011
Report size: 30 pages, font 11, Arial, Times New Roman. 1-1/2 spacing.