Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 9

Operational Plan

UniTea
Daily Operations
Processing System
This processing system for
tea would be able to
produce 30 tons of liquid
tea for an hour.
This would entail Unitea’s
production capacity to
2,000 upto 36,000 150ml to
2.5 L bottles per hour.
Plant Layout

Labelling and
Cartooning Area
Processing system for tea (30 ton/hr)
Bottling Line
SPECIFICATIONS:

a) Rinser/Filler/Capper

b) Washing Machine, Filling


Machine, Capping Machine
Separated

c) Bottle material: PET

d) Bottle Volume: 150ml – 2.5L

e) Production capacity: 2,000 –


36,000 bottles per hour

Tea Bottling Machinery


Location
The Plant will be located in Brgy. Communal, Davao
City which is located at the Northern Part of Davao
City near Davao International Airport and Sasa Wharf
and some 30 minute ride from Downtown.

You might also like