DEFECT REPORT

No.1 PLTGU SWITCHYARD


Location : Dia. 5 to Budi Kemuliaan (Main Bus B)
Report Description : New CT 5.3 (phase T) was fractured
Incident Happening : 9 November 2010 / 10.00 am.
Pictures Report :

Remark : When the contractor has to opening the crate, the insulator of CT was
broken before lifted.

Reported by:
Insp. Switchyard.
10November 2010