Professional Documents
Culture Documents
4.8 - List of Documentation, Part I and Part II and MappingV2
4.8 - List of Documentation, Part I and Part II and MappingV2
Appendix 8: List of Project
PART I DOCUMENTATION PART II DOCUMENTATION
YEAR YEAR
2009 Part II Consultation Report Final Draft : 2010
Report On Collection of Existing Data
Baseline Studies of Demography, Housing and
Report On Collection Of Existing Data Urbanization, Education, Health, Economy and
‐Annex1‐ Social Infrastructure 2009 Labour Market; Transportation, Water and
Sanitation, Energy, Environment.
2009 Needs Assessment,
Inventory of Land Tenure Categories in Rwanda
Risk and Suitability Analysis,
2009 Scenarios;
Socio Economic Study of Ecologically Sensitive Areas
Consultation Report
2009
Agro‐Ecological Investigation Introduction to Plan (Part II Version), PP 2010
Stakeholders Meetings Minutes (01‐10‐09, 22‐10‐09, Presentation
19‐11‐09) 2009 2010
GIS Modeling Concept, PP Presentation
Stakeholders Scenario GIS Modeling Results, PP 2010
Explanatory Note of the Stakeholders Meetings 2009 Presentation
Steering Committee Minutes (18‐02‐10, 30‐03‐10, 2010
4.8_List of Documentation, Part I and Part II and MappingV2 1 9/2/2010
Rwanda National Land Use Development Master Plan – Appendix 8
MAPPING
AERIAL PHOTOGRAPHY AND MAPPING YEAR
Aerial Photography Report 2008 2008
Technical Specifications for NLC GIS Data Base 2008
Aerial Photography Report 2009 2009
Road‐Map for the new Rwanda National Geodetic Systems 2009
Photo Control and National Geodetic Systems 2009
Production of ortho photo from aerial photos 2010
Production of ortho photo from satellite images 2010
Base map database description 2010
4.8_List of Documentation, Part I and Part II and MappingV2 2 9/2/2010