Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

AMRAPALI CENTURIAN PARK - HIGH RISE

(TERRACE HOMES)

The various details of the project are as follows

• Secured Gated Community.


• High-Rise G+14 and G+19 storey towers with One Level Basement and grand entrance lobby.
• Multi-tier 24X7 security with 75% Open Area.
• 20 kms away from New Delhi Railway Station.
• 5 kms away from Metro Station.
• Power Back-up, Club, Swimming Pool.
• 100% power backup for common facilities.

AFFORDABLE TYPE PREMIUM TYPE


TYPE SPECIFICATION AREA TYPE OF SPECIFICATION AREA(approx)
OF FLAT
FLAT
1 2BHK+2 Toilets with 885 Sq Ft 1 3BHK+2Toilets with 1400 Sq Ft
Terrace Terrace
2 2BHK+2 Toilets +Study 990 Sq Ft 2 3BHK+3Toilets+Study 1600 Sq Ft
with Terrace with Terrace
3 3BHK+2 Toilets with 1185 SqFt 3 3BHK+4Toilets +Svt with
Terrace Terrace 1700 sq Ft
4 4BHK+4toilets+servant
2070 sq Ft
with Terrace

SPECIAL CORPORATE PRICES (flexi plan):


FLOORS BASIC SALE OTHER CHARGES TOTAL
PRICE
1-3 2000 100 2100
4-6 1930 100 2030
7-9 1840 100 1940
10-12 1790 100 1890
13-15 1750 100 1850
16 onwards 1710 100 1810

NOTE: These prices are inclusive of open car parking, EEC, FFC, Lease Rent, Power Backup 500 VA, Club
membership.

For the option of covered Car Parking Rs. 70,000/- will be charged extra.

Additional Rs. 25/ sq ft for IFMS and Rs. 25,000/-for Dual meter will be charged.

Additional Rs. 50/- for Park Facing PLC and Rs. 30/- for Road Facing PLC will be charged

For CLP Rs. 100/ sq ft will be charged extra.

This offer letter is valid for a minimum of 20 bookings.

Cheque/DD should be drawn in favor of “Amrapali Centurian Park Pvt. Ltd.”


Service tax extra @ 2.575% on total cost.

P
AYMENT PLAN

PLAN B CLP
ON BOOKING 10%
WITHING 30 DAYS FROM BOOKING 10%
ON EXCAVATION 10%
ON GROUND FLOOR CASTING 10%
ON FOURTH FLOOR CASTING 10%
ON EIGHT FLOOR CASTING 12.5%
ON TWELEVTH FLOOR CASTING 10%
ON TOP FLOOR CASTING 12.5%
ON BRICK WORK AND PLASTER 10%
ON FINISHING 5%
ON POSSESSION OTHER CHARGES

PLAN C Flexi payment Plan


ON BOOKING 10%
WITHING 45 DAYS FROM BOOKING 30%
ON GROUND FLOOR CASTING 10 %
ON FOURTH FLOOR CASTING 10%
ON EIGHT FLOOR CASTING 10%
ON TWELTH FOOR CASTING 10%
ON TOP FLOOR CASTING 10%
ON START OF FINISHING WORK 10%
ON POSSESSION OTHER CHARGES

You might also like