REF. NO.

SPS-WI-QC-005
CV SPS WORK INSTRUCTION REV. NO. 00 DATE :
SHEET 1 OF 1

TEST METHODE FOR WET FILM THICKNESS

Reference Standard : ISO - 2808 - Paints and varnishes — Determination of film thickness

PREPARATION AND SET-UP :

EQUIPMENT / TOOLS :
- Wet Film Measuring Comb

Procedure :
1. after spraying the paint not over then 10 second Immediately measure the Wet Film thicknes.
Setelah sprey cat tidak lebih dari 10 detik segera ukur ketebalan Film cat basah tersebut (WFT).

2. Place gauge press into wet film at 90° angle and must
place on flat area.
Pasangkan WFT Comb tekan kedalam cat film yang basah
dengan sudut 90° dan perhatikan penempatan WFT harus
pada area yang rata.

3. Remove the gauge, and examine the teeth where teeth covered by paint and where teeth
not covered by pait to determine the wet Film thickness.
Lepaskan WFT Comb dan periksa gigi-giginya mana gigi yang tertutup cat dan mana yang tidak
tertutup cat untuk menentukan nilai WFT.

- Example (Contoh)
The drawing below indicates that tooth marked 3 mils is covered with the wet paint and tooth marked
4 mils is not covered. This indicates that the true wet film thickness of the material is between 3 and
4 mils thick.
Pada gambar dibawah menunjukkan bahwa gigi ke 3 mils tertutup cat basah dan gigi ke 4 mils tidak
tertutup cat. Dari penunjukkan ini ditentukan nilai Wet Film Thickness adalah terletak diantara 3 dan 4
mils, atau sama dengan 3,5 mils

4. Write down the result of Wet Film Thickness to the QC report and take photo if necessary.
Immediately report to SPV. Production and QC SPV about the result.
Tulis hasil pengukuran Humidity pada QC report form dan diphoto jika perlu. Kemudian segera
laporkan hasilnya kepada SPV. Produksi dan SPV. QC.
ECN NO DESCRIPTION
DATE
5. Clean gauge in any suitable solvent immediately after use TITLE : TEST METHODE FOR WET FILM THICKNESS
Segera bersihkan WFT Comb dengan thiner setelah selesai dipakai
APPROVED BY DATE PRODUCT Ship
PROCESS ENGR Avliandi PROCESS LOC. Blasting&Painting
IND ENGR OPER SEQ
PRODUCTION Avliandi STD TIME (SEQ)
QA Avliandi STD (SEQ)
PREPARE BY Avliandi RATE/HR
FILE NAME OUTPUT/DAY
GEN003