PROJECT: PROPOSED CONSTRUCTION OF PBR COMMUNITY HEALTH CENTER

LOCATION: PETRON BATAAN REFINERY LIMAY, BATAAN , PHILIPPINES


SUBJECT: BAR CHART & S - CURVE
CONTRACTORS: SD PLATON CONST. INC.

ITEM WORK DESCRIPTION WT. 15th 30th 45th 60TH


GENERAL REQUIREMENT
A 0.024615
100%
SITE DEVELOPMENT
/ GUARD WORK
100%
B 0.152554
95%
%
CONST. OF BUILDING :
C FOOTING, 0.044985
%
S
1.2 WALL FOOTING 0.011818 %

85%
1.3 COLUMN & BEAM 0.044202
%
CONST. OF
80%
RECTIFICATION OF
2.0 0.033290
PERIMENTAL WALL
/ FENCE 75%
%
2.2 WALL PARTITIONS 0.062579 %
70%
2.3 SLAB ON FILL 0.054702
65%
%
2.4 FLOR FINISHER 0.024959
60%
%
2.5 OTHERS 0.035690
55%
CARPENTRY AND WOOD %
2.6 WOORKS 0.064739
50%
METAL AND TINSMITH %
2.7 WORKS 0.083030

%
55%

50%
2.7 0.083030
45%
%
ALUMINUM WINDOWS
2.8 GLASS WORKS 0.0133440
40%
%
2.9 BLINDS 0.015297
35%
2.1 DOORS AND WINDOWS 0.022988 %
30%

D SANITARY / PLUMBING 0.044048 %


25%
E ELECTRICAL WORKS 0.080583 %
20%
F PAINTING WORKS 0.044880 %
15%
OTHER MISCELLANEOUS
G WORKS 0.048386 %
10%
H VARIOUS EQUIPMENT 0.057980 %
5%
.
I OFFICE FURNITURES 0.035310 %
0%
TOTAL %
Accomplishment 0.1503 0.2038 0.33217 0.32373
Comm. Accomplishment 15.03% 35.410% 67.62% 100.00% %