Professional Documents
Culture Documents
GMB Prediction We
GMB Prediction We
T= 210 0F
OGIP = 823 BSCF
pi = 3200.0 psia ITERATION ON (WE )FRO
h= 120.00 ft THAT FROM UNSTEADY
f= 0.22
Swc = 0.23 of PV
Sgr = 0.30 of PV
gg = 0.67
mw = 0.40 cp
k= 120.00 md
cw = 3.00E-06 1/psi
cf = 8.00E-06 1/psi
f= 1.00 degrees
rR = 8350 ft
rA/rR = 10.00
Bw = 1.00 Assume ( Pi - P) to minimize the difference between (W
Wp = 0.00 DP= 40 play with this value
Pa 1000.00
Calculated Assume The tolerance between(Abs(Wem -Weu)<=)To
B = Aquifer Constant
B=1.119 h Φ Ct f re^2 22656.86 Tol= 0.5
3194.8226
CtD= tD constant
CtD =2.304*k/(Φ μw Ct re^2) 4.10
Max Recovery % = 99.43
N , No of data (Leave this) 38 OUT PUT
Time q Gp R%= tD
(yrs) (MMCF/d) Bscf Gp/G
0.00 200.0 0 0 0
0.25 200.0 18.25 2.22 1.024
0.50 200.0 ### 36.50 4.43 2.048
0.75 200.0 54.75 6.65 3.072
1.00 200.0 73.00 8.87 4.097
1.25 200.0 91.25 11.09 5.121
1.50 200.0 109.50 13.30 6.145
1.75 200.0 127.75 15.52 7.169
2.00 200.0 146.00 17.74 8.193
2.25 200.0 164.25 19.96 9.217
2.50 200.0 182.50 22.17 10.241
2.75 200.0 200.75 24.39 11.265
3.00 200.0 219.00 26.61 12.290
3.25 200.0 237.25 28.83 13.314
3.50 200.0 255.50 31.04 14.338
3.75 200.0 273.75 33.26 15.362
4.00 200.0 292.00 35.48 16.386
4.25 200.0 310.25 37.70 17.410
4.50 200.0 328.50 39.91 18.434
4.75 200.0 346.75 42.13 19.458
5.00 200.0 365.00 44.35 20.483
5.25 200.0 383.25 46.57 21.507
5.50 200.0 401.50 48.78 22.531
5.75 200.0 419.75 51.00 23.555
6.00 200.0 438.00 53.22 24.579
6.25 200.0 456.25 55.44 25.603
6.50 200.0 474.50 57.65 26.627
6.75 200.0 492.75 59.87 27.652
7.00 200.0 511.00 62.09 28.676
7.25 200.0 529.25 64.31 29.700
7.50 200.0 547.50 66.52 30.724
7.75 200.0 565.75 68.74 31.748
8.00 200.0 584.00 70.96 32.772
8.25 200.0 602.25 73.18 33.796
8.50 200.0 620.50 75.39 34.820
8.75 200.0 638.75 77.61 35.845
9.00 200.0 657.00 79.83 36.869
9.25 200.0 675.25 82.05 37.893
TION ON (WE )FROM MATERIAL BALANCE AND
FROM UNSTEADY STATE ( VE &H)
etween(Abs(Wem -Weu)<=)Tol
Clear Befor Run
RUN