User Designing

Requirement & Continued (14


Analysis (28 days) Coding Continued
System (7 days)
days)
Requirement
Designing
Specification Implementation
(21 days) Dummy Activity Alpha testing (7
(7 days) (2 days)
(0 day) days)
6.2 Dummy Activity
(0 day)

1 2 3 4 5 6.1 7.2

7.1 8 9 10 11 12

Feasibility Study Hardware & Coding (49


(7 days) Software days)
Requirement
(7 days) White-box testing Black-box testing Beta testing
(21 days) (7 days) (10 days)

PERT CHART