1. BBA Sohar is working on dressing unit jobs for locations F110 and corniche, as well as tv cabinet dummy panels for locations G116 and F114. They have received materials and drawings for jobs that are 25% and 0% complete.
2. Royal office is working on window jobs for the first and second floors that is 80% complete. They are also working on another undisclosed job that is 0% complete and are still waiting on drawings.
3. Qasr al Alam is working on templates for gypsum work that is 50% complete and have received materials and drawings.
1. BBA Sohar is working on dressing unit jobs for locations F110 and corniche, as well as tv cabinet dummy panels for locations G116 and F114. They have received materials and drawings for jobs that are 25% and 0% complete.
2. Royal office is working on window jobs for the first and second floors that is 80% complete. They are also working on another undisclosed job that is 0% complete and are still waiting on drawings.
3. Qasr al Alam is working on templates for gypsum work that is 50% complete and have received materials and drawings.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd
1. BBA Sohar is working on dressing unit jobs for locations F110 and corniche, as well as tv cabinet dummy panels for locations G116 and F114. They have received materials and drawings for jobs that are 25% and 0% complete.
2. Royal office is working on window jobs for the first and second floors that is 80% complete. They are also working on another undisclosed job that is 0% complete and are still waiting on drawings.
3. Qasr al Alam is working on templates for gypsum work that is 50% complete and have received materials and drawings.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd
2 BBA Sohar F110 Dressing unit corniche 3 BBA Sohar G116,F114 tv cabinet dumy panel 4 BBA Sohar 5 Royal office First and second floor window 6 Royal office 7 Qasr al Alam Templates ply for Gypsum work 8 Nizwa Master bedroom ceiling fret panel 9 Nizwa 14401 ceiling beam side carving Qnty Drawing Material status 3 Received Received 25% 8 Received Received 0% 4 Received Received 0% 9 Received 0% 8 Received Received 80% 32 Received 0% 45 Received Received 50% 2 Received Received 0% Not received Received 0% Remarks