This document outlines 23 construction-related work items for a project, including their start and end dates. The work ranged from April 10, 2011 to June 05, 2011 and included tasks like block work, plastering, painting, waterproofing, tile installation, metal works, electrical work, and handover of the completed project.
This document outlines 23 construction-related work items for a project, including their start and end dates. The work ranged from April 10, 2011 to June 05, 2011 and included tasks like block work, plastering, painting, waterproofing, tile installation, metal works, electrical work, and handover of the completed project.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd
This document outlines 23 construction-related work items for a project, including their start and end dates. The work ranged from April 10, 2011 to June 05, 2011 and included tasks like block work, plastering, painting, waterproofing, tile installation, metal works, electrical work, and handover of the completed project.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd
1 Block work March 15,2011 April 15,2011 2 Plaser works April 16,2011 May 09,2011 3 Painting works May 10,2011 May 29,2011 4 Water Proofing and toilets May 01,2011 May 08,2011 5 Roof water proofing May 01,2011 May 13,2011 6 Floor tiles and toilets May 14,2011 May 25,2011 7 wall tiles and toilets May 10,2011 May 25,2011 8 Floor tiles at villa May 15,2011 May 25,2011 9 Skirting at villa May 25,2011 May 31,2011 10 Gypsum board wall at toilet May 10,2011 May 21,2011 11 Gypsum ceiling May 10,2011 May 25,2011 12 Sanitary fixtures May 27,2011 May 27,2011 13 Metal works at door May 23,2011 May 31,2011 14 Metal works at windows May 15,2011 May 31,2011 15 Kerb stone installation May 24,2011 May 26,2011 16 Tiles installation May 27,2011 May 31,2011 17 Punch list June 01,2011 June 02,2011 18 Hand over June 01,2011 June 05,2011 19 Out side drainage line April 23,2011 May 10,2011 20 Savito plaster April 23,2011 May 31,2011 21 Electrical April 14,2011 May 01,2011 22 Mob. Termination April 10,2011 May 20,2011 23 Electrical fixtures April 27,2011 May 31,2011