Professional Documents
Culture Documents
Ballet 0408 C
Ballet 0408 C
200 ft. Houston Ballet’s $46.6 million Center for Dance contains nine
Center for Dance
Pr Frank studios, a 200-seat theater, an academy dormitory, a large
es lin
45 ton Bayou
costume shop, music and video facilities and staff offices. The
six-story, 115,000-square-foot facility was completed several
by
lo Co
ffa
Bag
ng
ith
res months ahead of schedule, and the finished building cost
Bu
Sm
Prairie s about $6.4 million less than originally budgeted.
Alley
Theatre Inspired by a proscenium stage, Dormitory
Wortham the black granite facade frames for ballet
a
an
s
Lo
on top floor
Dance
studios
LOUISIA
N A
Offices,
meeting
rooms
SS
RE
G
N
O
C
Drive-t
hrough
Traffi
c flo
into d w from I-1
ownto 0
N
TO
wn
SMIT
ES
H
PR
Once construction is The Margaret Entrance Open-air sky
finished on the Congress Alkek Williams to lobby bridge provides
Street bridge, steps will Dance Lab has a backstage
be added to connect the retractable, entrance to
building to the walking bench-style the Wortham
path on Buffalo Bayou seating for 200 Theater Center
Sources: Gensler; Houston Ballet JAY CARR : C H R O N I C L E