Clearing Limits

16’ - 0”

4’ - 0” Varies 3’ - 0” 10’ - 0” Bikeway 3’ - 0” Varies 4’ - 0”


Yellow
CL Stripe

1.5% 6:1
6:1
2 Max.
1 2 Max.
1

4” Bituminous Concrete
4” Topsoil & Seed (Typ.)
12” Gravel Base Course
Ordinary Borrow (Fill)
Existing Ground

TYPICAL SECTION #1: STANDARD OFF-ROAD SECTION


(Various Locations)
NTS
Clearing Limits

4’- 0” Varies 6’ - 0” 10’ - 0’ Bikeway 3 ’- 0” Varies 4’- 0”


Grass Walkway Yellow Shoulder
Stripe
CL 4” Topsoil
& Seed
(Typ.)
2 Max. 1.5 % 1.5 % 6:1
2 Max.
1 1
Canal

Existing San. Sewer Main 4” Bituminous Concrete


(Actual depth approx. 6’)
12” Gravel Base Course
Ordinary Borrow (Fill)

Existing Ground

TYPICAL SECTION #2: BIKEWAY WITH ADJACENT GRASSED WALKWAY


(Plummer’s Trail, Bikeway Section 3, Northbridge)
NTS
Clearing Limits

Approx. Limit Approx. Limit


of Disturbance of Disturbance
Varies 2’ - 0’ 8’ 0” Bikeway 2’ - 0” 4’ - 0’ 5’ - 0’
Prop.
Drainage
Swale

CL
Cemented
Stone Masonry 4’ - 6’ Safety Railing
Wall
1.5% Prop. Mechanically Stabilized Earth
(MSE) Retaining Wall

Existing Ground

Ordinary Borrow
4” Stabilized Soil (Fill)
12” Gravel Base Course

TYPICAL SECTION #3: MINIMUM CROSS-SECTION


(Goat Hill, Heritage, State Park, Bikeway Section 3, Northbridge, Uxbridge)
NTS
Clearing Limits

4’ - 0” Varies 3’ - 0” 10’ - 0” Bikeway 6’ - 0” 3’ - 0” Varies 4’ - 0”


Yellow
Stripe
CL

6
1.5% 1.5%
2 Max. 1
2 Max.
1 1

Existing
Ground

Ordinary Borrow (Fill) 4” Stabilized Soil


4” Topsoil & Seed (Typ) 12” Gravel Base Course
4” Bituminous Concrete

TYPICAL SECTION #4: BIKEWAY WITH ADJACENT EQUESTRIAN TRAIL


(SNETT Trail, Section 1, Millville & Blackstone)
NTS
Existing R.R. ROW - Width Varies
Clearing & Grubbing

3’ - 0” 3’ - 0”
CL Tracks
Varies 10’ 0” Bikeway 18’ - 25’ Railroad Offset

Safety Railing Railroad Tracks


x
6’ Chainlink
x
4” Topsoil & Seed Yellow Fence
Stripe x

1.5% 6:1 x
1 4” Ballast
Mechanically Stabilized Earth
2 Max.
(MSE) Grass Faced Slope
4” Topsoil & Seed
Wetland
4” Bituminous Concrete
12” Gravel Base Course

TYPICAL SECTION #5: BIKEWAY ADJACENT TO P&W R.R.


(Various Locations)
NTS
Clearing Limits

4’ - 0’ Varies 2’ - 0’ 3’ - 0’ 10’ - 0” Bikeway 3’ - 0’ 2’ - 0’ Varies 4’ - 0’

CL
Yellow
Stripe
1 1.5%
6:1 6:1 1
2 Max 2 Max

Existing Ground
4” Bituminous Concrete
4” Topsoil & Seed (Typ.) 12” Gravel Base Course

TYPICAL SECTION #6: BIKEWAY IN SHALLOW CUT


(Various Locations)
NTS
Existing Existing Existing Pavement Existing Pavment Existing Existing
5’+ Sidewalk 4’+ Grass Varies 12.3’+ to 14.5’ Varies 11.5’+ to 12.25’ 4’+ Grass 5’+ Sidewalk
(to remain) (to remain)
Varies Proposed 14’- 0” Travel Lane Proposed 14’- 0” Travel Lane Varies

1’ - 0” Sawcut
Into Existing Pavement

Sawcut
Existing
Roadway
Centerline

4” Topsoil & Seed (Typ) Pavement


Structure
Existing Pavement (Depth
Varies)

TYPICAL SECTION #7: SHARE-THE-ROAD BIKE ROUTE


(Portions of Maple Street, Bikeway Section 5, Millbury)
NTS
Existing Existing
8’ - 0” Sidewalk Existing Pavement 17’- 0” Existing Pavement 17’- 0” 8’ - 0” Sidewalk
Proposed Proposed 12’ - 0”
6’ - 0” Sidewalk Proposed 16’ - 0” Travel Lane Proposed 16’ - 0” Travel Lane Sidewalk/Bike Lane
Existing
Proposed Centerline
Centerline

TYPICAL SECTION #8: SHARED EXPANDED SIDEWALK


(Hermon Street, Bikeway Section 7, Worcester)
NTS
Clearing Limits

12’ 0” Varies 14’- 0” 4’ - 0”


Temporary Work Area to use
Timber Mat

CL
4’ - 6” Safety Railing

Existing Ground

TYPICAL SECTION #9 BOARDWALK


(TBD Location, Bikeway Section, Town(s))
NTS
14’- 0”

2’- 0” 10’- 0” 2’- 0”


Shoulder Bikeway Shoulder

4’- 6”

Timber or Concrete
Deck

TYPICAL SECTION #10: BIKEWAY BRIDGE


(All Bikeway Sections)
NTS
20’- 0”

2’- 0” 10’- 0” 6’- 0” 2’- 0”


Shoulder Bikeway Equestrian Shoulder

6’- 0” 4’- 6”

Timber

TYPICAL SECTION #11: BIKEWAY/EQUESTRIAN TRAIL BRIDGE


(SNETT Trail, Bikeway Section 1, Millville and Blackstone)
NTS