TABLE OF CONTENTS
LIST OF TABLES
Table 1: Traffic count on NH 4 - Road to Chennai ............................................................................. 7
Table 2: Traffic count on routes originating from Krishnagiri ........................................................... 8
Table 3: Average Daily Traffic (ADT) - Tolled Traffic ......................................................................... 9
Table 4: Seasonal Correction Factor...................................................................................................... 10
Table 5: Annual Average Daily Traffic (AADT) - Tolled Traffic ...................................................... 10
Table 6: Traffic Zones – OD Survey ...................................................................................................... 11
Table 7: Major Origin Destination Pairs............................................................................................... 11
Table 8: Major Commodity movement on project road .................................................................... 12
Table 9 : OD Matrix of vehicles plying between Hosur & Krishnagiri (in No.s) ........................... 13
Table 10 : OD Matrix of vehicles plying between Hosur & Krishnagiri (in % age) ....................... 14
Table 11: Registered Motor Vehicles in Tamil Nadu (2003-2008) (In Thousands)....................... 14
Table 12: Population - NSDP- PCDP .................................................................................................... 14
Table 13: Elasticity Values...................................................................................................................... 17
Table 14: Forecasted growth rate of Population - NSDP- PCDP ...................................................... 18
Table 15: Forecasted growth rate of Traffic - Tamil Nadu State ....................................................... 19
LIST OF FIGURES
Fig 1: Fig 1: NHDP map – Status as on Jan 31 2010 .............................................................................. 5
Fig 2: Location Map of project road, HOSUR - KRISHNAGIRI ......................................................... 5
Fig 3: Route diverting from Krishnagiri ................................................................................................ 7
Fig 4: Snaps showing survey in progress .............................................................................................. 9
Fig 5: Major commodity movement along project road .................................................................... 13
Fig. 6: Elasticity by Graphical Extrapolation Method ........................................................................ 17
Fig. 7: Forecast of growth rate of Population - NSDP- PCDP ........................................................... 18
GENERAL
The project Road, Hosur to Krishnagiri, is proposed to be developed on Design, Build, Finance,
Operate and Transfer (DBFOT) basis. The major source of revenue for the project developer
shall be the toll collection. For making the proper assessment of traffic volume, base year traffic
and its projection, consultant, Louis Berger Consulting Pvt. Ltd. has carried out the necessary
traffic surveys and investigations.
DESCRIPTION OF PROJECT ROAD
Project road corridor Hosur Krishnagiri is section of NH-7 from km 33.130 to km 93.000 in the
State of Tamil Nadu. The project road starts from Hosur Town (km 33/130) and traversing
through Sulagiri terminates at the outskirt of Krishnagiri Town (km 93/000). The existing road
is 4- Laned divided carriageway throughout, with the overall length of 60.0 km.
The project Road Hosur to Krishnagiri is part of Golden Quadrilateral, Mumbai-Chennai Link.
Fig 1 below presents the location of project road on NHDP map.
Mumbai – Chennai Link:
NH 4 (Mumbai – Bengaluru),
NH 7 (Bengaluru – Krishnagiri),
NH 46 (Krishnagiri – Ranipet),
NH 4 (Ranipet – Chennai)
The project Road Hosur to Krishnagiri (NH-7) is part of Golden Quadrilateral, Mumbai-
Chennai Link. However between Bengaluru & Chennai there exist two road routes.
1). Route via Project Road, Bengaluru to Krishnagiri via NH-7, Krishnagiri to Ranipet via NH-46
and Ranipet to Chennai via NH 4. (Length Bengaluru to Chennai is 360km)
2) Route via NH 4 (Also called old madras road). (Length Bengaluru to Chennai is 330km)
3) Proposed Expressway between Bangluru and Chennai. (Green Field Project)
The two alternatives take different route up to Ranipet and than Ranipet to Chennai (Length
114 km) follows same route (NH 4). The Bengaluru-Chennai section of the highway is
supplemented by the triangle of National Highways 7, 46, and returns to NH 4 at Ranipet.
Table below presents a comparison chart for the vehicles plying between Bengaluru and
Chennai via many options.
Sr. Description Via Project Road (NH 7) Via NH 4 Via Expressway
No.
1 Length 360 km 330 km Proposed
2 Lane 4-6 Lane divided Bengaluru to Mulbagal Proposed
Configuration carriageway throughout (70km) 4 lane in
progress,
Malbagul to Ranipet
(124km) 2 lane,
Ranipet to Chennai
(114km) 4/6 Lane.
3 Tolling Complete length tolled 2 lane section is non- Tolling will be
tolled. higher.
4 Merits of NH 7 at Krishnagiri divert Only Connects Chennai. Being a
Project road to Salem, connecting Greenfield
over alternate central Tamil Nadu with project, will take
A major section is 2 lane
routes. Bengaluru and Mumbai. at least 10 years
configuration. in start of
operation.
Part of GQ, will be Traffic has to enter Highlights the
developed on priority. additional state of A.P., potential growth
For example : refer Box in project
below corridor
The 9.5-km expressway from Silk Board junction to Electronic City is a four-lane toll
road. It is expected to drastically reduce travelling time to the centre of IT industry as
the expressway passes over six major traffic bottlenecks.
In the quest to comprehend further, the traffic travelling on the project road can be divered on
the NH 4 (Alternate Route) consultant carried out one day count at 3 locations, three major
routes originating from Krishnagiri.
TRAFFIC SURVEYS
With a view to estimate the base year traffic volume in respect of goods and passenger carrying
vehicles, the Classified Traffic Volume Count (CTVC) survey at two locations, Turning
Movement survey at two locations and Origin-Destination (O-D) survey at one location were
conducted. For the purpose of traffic estimation and projections the year 2010-11 has been taken
as the base year.
SEW officials at toll plaza location Manual CTVC at Km 87+4 (Near Krishnagiri)
Manual CTVC at Km 34+000 (Near Hosur) Long Queuing at toll plaza km 87+500
Tractor 1.5 14 3
Tractor Trailor 4.5 39 13
Exempted vehicles 83 30
2 Wheelers 0.5 7055 7055
3 Wheelers 1.0 947 947
ADT TOTAL 29634 34385
(PCU) 53116 60895
The project road is passing through the urban section of Hosur and Krishnagiri, however no
major settlement exist in-between, but the quantum of non tolled traffic is high.
For arriving at the annual average daily traffic (AADT) consultant collected the monthly data of
traffic plying on the project road for complete one year. Table 4 below presents the calculation
of Seasonal Correction Factor (SCF) for calculating AADT from the ADT figures given in table
above. Survey was carried out in the month of March 2010.
Table 4: Seasonal Correction Factor
Car LCV / Mini Bus Bus / Trucks
Sr .No.
Monthly Revenue SCF Revenue SCF Revenue SCF
1 Jan-09 198,959 1.06 58,021 1.05 225,188 1.16
2 Feb-09 168,551 1.256 57,760 1.06 228,841 1.14
3 Mar-09 173,478 1.221 63,689 0.958 260,437 1.004
4 Apr-09 200,708 1.05 63,386 0.96 255,167 1.02
5 May-09 235,194 0.90 61,858 0.99 264,592 0.99
6 Jun-09 209,733 1.01 59,684 1.02 265,480 0.98
7 Jul-09 203,269 1.04 61,246 1.00 275,759 0.95
8 Aug-09 221,456 0.96 59,658 1.02 272,865 0.96
9 Sep-09 222,020 0.95 60,582 1.01 260,186 1.00
10 Oct-09 232,703 0.91 63,195 0.97 268,970 0.97
11 Nov-09 206,013 1.03 54,992 1.11 253,719 1.03
12 Dec-09 268,859 0.79 67,876 0.90 306,385 0.85
Ave. 211,745 60,996 261,466
The AADT values as calculated by multiplying the SCF with the ADT values arrived from 7
day 24 hour volume count is presented in Table 5 below.
Table 5: Annual Average Daily Traffic (AADT) - Tolled Traffic
PCU Km 87+400 Km 34+000
Vehicle Type Factors (Existing Toll Plaza) (For MSA calculations)
Car/Jeep 1.0 7652 11862
Mini Bus 1.5 97 234
Bus 3.0 3288 3357
Tempo/LCV 1.5 2918 2351
2 Axle 3.0 3040 5333
3 Axle 3.0 4754 4509
4 - 6 Axle 4.5 784 484
>6 Axle 4.5 30 69
Tractor 1.5 14 3
Based on the OD survey data collected from the toll plaza, survey locations, major Origin-
Destination pairs are presented in Table 7 below. Figure 5 below presents the major
commodity movement along the project road, along major routes.
Table 7: Major Origin Destination Pairs
Major OD Pair Vehicle Type
Commodity
From To
Truck 2A Parcel/Courier
Truck 3A Parcel, Vegetables
Bengaluru, Tumkur, Vellore, Kanchipuram,
Truck >3A Gas
Kolar, Mysore, Hasan Chennai
LCV Parcel, Food Products
Car -
Truck 3A Fruits/Vegetables
Bengaluru, Tumkur,
Salem, Erode LCV Parcel/Courier
Kolar, Mysore, Hasan
Bus -
Bengaluru being very near to the project road is generating lot of commercial as well as
passenger vehicles.
Majority of traffic is not bound for Chennai but is going towards Salem, Erode and
Coimbatore.
Major commodities are Hardware, Parcels and Vegetables, Refer Table 8 below.
Table 8: Major Commodity movement on project road
Krishnagiri Hosur to
Bothways % distribution
Commodity to Hosur Krishnagiri
Hardware 57 101 158 35%
Parcel/Courier 55 23 78 17%
Fruits & Vegetables 48 19 67 15%
Vehicle 33 0 33 7%
Grocery 16 18 34 8%
Petrol/Diesel 11 33 44 9%
Construction material 10 18 28 6%
Food Grains 3 6 9 2%
Stationary 2 0 2 1%
Total 235 218 453 100.00%
Petrol/Diesel
5%
Construction
material
4%
Food Grains
1%
Stationary
Parcel/Courier 1%
23% Hardware
25%
Table 9 and 10 below presents the OD Matrix at the toll plaza location in both directions.
Table 9 : OD Matrix of vehicles plying between Hosur & Krishnagiri (in No.s)
Origin Destination
Zone Grand
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Total
Banglore 1 4 1 99 23 73 52 14 202 17 2 1 59 547
Hosur 2 1 2 73 11 46 5 5 87 10 1 18 259
Shoolagiri 3 1 1 2 1 1 6
krishnagiri, 4 65 78 10 1 2 5 161
Dharampuri 5 14 14 1 1 30
Salem 6 87 45 2 1 10 6 1 152
Coimbatore, 7 45 11 1 3 7 1 68
Pondycherry 8 65 35 7 3 110
Chennai 9 133 58 2 1 2 1 12 3 212
Andhra Pra. 10 6 3 1 1 1 4 16
Maha, Guj 11 2 1 1 13 12 6 28 1 1 13 78
N. India 12 2 1 6 8 5 4 2 2 4 34
South TN 13 32 21 3 1 3 4 64
Table 10 : OD Matrix of vehicles plying between Hosur & Krishnagiri (in % age)
Origin Destination
Zone Grand
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Total
Banglore 1 6% 1% 4% 3% 1% 12% 1% 3% 31%
Hosur 2 4% 1% 3% 5% 1% 1% 15%
Shoolagiri 3 0%
krishnagiri, 4 4% 4% 1% 9%
Dharampuri 5 1% 1% 2%
Salem 6 5% 3% 1% 9%
Coimbatore, 7 3% 1% 4%
Pondycherry 8 4% 2% 6%
Chennai 9 8% 3% 1% 12%
Andhra Pra. 10 1%
Maha, Guj 11 1% 1% 2% 1% 4%
N. India 12 2%
South TN 13 2% 1% 4%
Net State Domestic Product- Population- Per Capita Domestic Product (Tamil Nadu)
The Population, NSDP and Per Capita Income over the period from 2000 to 2009 for the state of
Tamil Nadu is presented in Table 12.
Table 12: Population - NSDP- PCDP
Logarithm Chart of cars per 1000 Population v/s per capita Domestic Product
2.80
2.70
ln(Cars per 1000 population)
2.60
2.50
2.40
y = 0.5855x - 3.287
2.30 R2 = 0.996
2.20
2.10
2.00
1.90
1.80
8.60 8.80 9.00 9.20 9.40 9.60 9.80 10.00 10.20 10.40 10.60
ln(PCDP)
Logarithm Chart of Mini Bus per 1000 Population v/s per capita Domestic Product
1.00
ln(Mini Bus per 1000 population)
0.50
y = 1.1975x - 11.287
0.00 R2 = 0.9775
-0.50
-1.00
8.60 8.80 9.00 9.20 9.40 9.60 9.80 10.00 10.20 10.40 10.60
ln(PCDP)
Logarithm Chart of Bus per 1000 Population v/s per capita Domestic Product
0.00
ln(Bus per 1000 population)
y = 1.2156x - 12.161
-0.50 2
R = 0.9848
-1.00
-1.50
-2.00
8.60 8.80 9.00 9.20 9.40 9.60 9.80 10.00 10.20 10.40 10.60
ln(PCDP)
12.30
12.10
11.90
y = 0.5817x + 5.2643
ln(LCV)
R2 = 0.9975
11.70
11.50
11.30
11.10
10.00 10.50 11.00 11.50 12.00 12.50
ln(NSDP)
12.60
12.40
y = 0.5949x + 5.4105
ln(Truck)
12.20
R2 = 0.9979
12.00
11.80
11.60
11.40
10.00 10.50 11.00 11.50 12.00 12.50
ln(NSDP)
65000
60000
y = 701.87x - 1E+06
55000
Population
R2 = 0.9987
50000
45000
40000
35000
1965 1970 1975 1980 1985 year1990 1995 2000 2005
310000
y = 20410x - 4E+07
260000
R2 = 0.925
NSDP
210000
160000
110000
1999 2000 2001 2002 2003 2004Year2005 2006 2007 2008 2009 2010
43000
y = 2929x - 6E+06
Per Capita - NSDP
38000
R2 = 0.9205
33000
28000
23000
18000
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Year
The above model is primarily used for passenger vehicles and assigned equal weightage to
population and per capita income. Similarly the model applied for estimating growth rate
of goods vehicles is as follows:
Tgr = NSDP gr * 100*E
Where,
Tgr = Traffic Growth Rate
NSDP gr = growth rate of NSDP (in real terms)
E = Elasticity value
Table 15 and 16 presents the traffic growth rates projected based on the economic parameters of
two states Tamil Nadu and Karnataka. As the project road is on the state border of Karnataka
and T.N. the growth rate of traffic on the project road is calculated based on the presentation of
vehicles as per the registration plate survey.
Table 15: Forecasted growth rate of Traffic - Tamil Nadu State
Elasticity 0.5855 1.1975 1.2156 0.5817 0.5949
Vehicles Car Mini Bus Bus LCV Truck
2010-12 4.9% 10.1% 10.2% 5.3% 5.5%
2013-17 4.5% 9.2% 9.4% 4.8% 5.0%
2018-22 4.0% 8.3% 8.4% 4.3% 4.4%
2023-27 3.7% 7.5% 7.6% 3.9% 4.0%
> 2028 3.3% 6.8% 7.0% 3.5% 3.6%
The bifurcation of the vehicles on the project road as per the registration plate survey is
presented in Table 17 below.
Table 17: Vehicles – Registration Plate
Reg.
Car Bus LCV 2A 3A >3A
No.
% % % % % %
No.s No.s No.s No.s No.s No.s
age age age age age age
T.N. 280 63% 227 59% 75 62% 132 74% 171 62% 22 59%
Also based on the distribution of car, bus and trucks in table 17 above, segregated growth rate
for car, bus and trucks (2-Axle, 3 Axle and >3Axle trucks) are given in table 18 below.
Table 18A: Growth rate of Traffic – For revenue calculation (Most Likely)
Vehicle Car Mini Bus Bus LCV 2-Axle 3-Axle > 3 Axle
However the project road is very near to the Metro Bengaluru which is having much higher
growth as compared with the Karnataka and Tamil Nadu state, hence an optimistic approach
will be to consider traffic growth rate equivalent to the GDP growth rate of Bengaluru city, as
presented in table 18B below.
Table 18B: Growth rate of Traffic – For revenue calculation (Optimistic)
Vehicle Car Mini Bus Bus LCV 2-Axle 3-Axle > 3 Axle
2010-12 9.0% 6.8% 8.9% 6.8% 6.9% 7.6% 7.7%
2013-17 8.3% 5.7% 8.2% 6.1% 6.3% 6.9% 7.0%
2018-22 7.4% 5.1% 7.4% 5.4% 5.6% 6.2% 6.3%
2023-27 6.7% 4.6% 6.7% 4.9% 5.0% 5.5% 5.6%
>2028 6.2% 4.1% 6.1% 4.5% 4.5% 4.9% 5.0%
Similarly considering the worsening of economic slow down and its impact on the traffic
movement will result in decline in projected growth rate.
TRAFFIC PROJECTION
The projected traffic has been calculated based on the most likely growth rate scenario
presented in the table 18a above. Table 19 presents the projected traffic at the toll plaza location.
Table 19 : Traffic Projection - Toll Plaza at km 87+500
Financial Car/Van/ TRUCK
Mini Tempo/
Years Year Jeep/ Bus 2- 3- >3 PCU (Total)
Bus LCV
Ending Sumo Axle Axle Axle
Base
6269 101 3275 3047 3028 4963 813
Year 2011 48447
1 2012 6671 108 3567 3254 3225 5306 869 51917
2 2013 7098 115 3884 3475 3434 5672 930 55641
3 2014 7516 122 4203 3680 3637 6029 989 59276
9 2022 26 195 59
10 2023 27 223 67 10 years
11 2024 29 252 76
12 2025 30 282 85
13 2026 32 314 94
14 2027 33 347 104
15 2028 35 382 115 15 years
16 2029 37 419 126
17 2030 39 458 137
18 2031 41 498 150
19 2032 43 541 162
20 2033 45 586 176 20 Years
21 2034 47 633 190
22 2035 49 682 205
23 2036 52 734 220
24 2037 54 788 237
25 2038 57 846 254 25 Years