"Requested for IHI data. Got IHI data on 3 / 10 3 / 23Scheduled a meeting with irina at 3 / 25Found that reminder row was bypassed at 1 / 14" 1066980 "super ID / PRODUCT ID is having zeroes and so error message is coming as there is logic for the same"
"Requested for IHI data. Got IHI data on 3 / 10 3 / 23Scheduled a meeting with irina at 3 / 25Found that reminder row was bypassed at 1 / 14" 1066980 "super ID / PRODUCT ID is having zeroes and so error message is coming as there is logic for the same"
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as TXT, PDF, TXT or read online from Scribd
"Requested for IHI data. Got IHI data on 3 / 10 3 / 23Scheduled a meeting with irina at 3 / 25Found that reminder row was bypassed at 1 / 14" 1066980 "super ID / PRODUCT ID is having zeroes and so error message is coming as there is logic for the same"
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as TXT, PDF, TXT or read online from Scribd
3/23- Schedule a meeting with irina at 3/25- Found that reminder row was bypassed at 1/14." 1066980 "3/11- There is a problem with request xml. Sent an email to srini 3/14- SUPER ID/PRODUCT ID is having zeroes and so error message is coming as there is logic for the same. 3/16- Leah asked for another example 3/21- got some example and asked for HB01 requ" ADHOC "3/21- S928 populates cutback fields from DCRSSID server hence sent DUR team for further research 3/22- DCRSSID server is from DCRS team 3/23- Leah asked question and replied the finding" 1024660 S928 populates COPAY-PRICE field from the SP-COPAY of POSO000 and which is having as $47.53 hence sent to pOS 930965 979141 getting error from Elg and elg told no member found 1001522 425587 "Working with Chin-Lea. Still it is in progress - " 474008 "NEED IHI DATA.SENT AN EMAIL TO STACICE 3/05- still awaiting for IHI data and task is already created for Stacie to pr ovide the IHI data 3/23- Still no IHI data" 424662 "TAS is complete. There is TSD review on Monday for this ticket too. 21/021- TAS review done.. Need to schedule & Code 22/02 - TAS uploaded on sharepoint. Worklogs created -TAS HAS BEEN APPROVED. Program pcsps416 is in dev1-q" 474199/1000162 "08/02- ndc not found error mesg is coming, no source listing pr esent hence requested to add listing 09/02- Got Listing. NDC not found error is coming.. Capture req/res area and sent to Mohan in IDF team for futher analysis. Mohan replied that NDC is not " 1005948 "CP server is returning CLNT_SUBMISSION = 9 hence exception. Sent the re search to Leah and jones in CP team 02/24- SCHEDULE A MEETING with eSD team and identified that MFS server E120 need a fix 3/2- meeting schedule with eSD team regarding fix. 3/2- sched"