Fig: Outside MBR

Fig: Inside MBR

Don't be Power Hungry

Energy costs are skyrocketing; look for efficiencies wherever possible. For example, continuous membrane aeration
can consume over 50% of a membrane bioreactor plant's total energy demand. However, the patented GE cyclic
aeration process can trim this energy demand by up to 75%, significantly reducing overall operating costs.