Saic B 1001

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Pre-placement/Site Preparation Inspection SAIC-B-1001 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

The surface preparation and coating requirements shall be specified on SAES-B-006


A1
the applicable construction drawings. Sec. 8.4

When cementitious fireprotection is to be provided, steel surfaces shall


be coated with SAES-H-101 (APCS-1B) Epoxy coating system prior to
fire proofing; the coating shall consist of a primer of SAMS 09-612-362 SAES-B-006
A2
epoxy paint 50-100µm thick and at least 2 top coats of SAMS 09-612- Sec. 8.4
364 with a minimum Dry Film Thickness of 150µm. Total combined
coating system thickness of 275-400µm, minimum-maximum.

Wire mesh for concrete fireproofing shall be 4"x 4"-10ga x 10ga or SASD
A3
2"x 2"- 14ga x 14ga shall be installed in preparation for fireproofing. AD-036711

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-B-006 -- Fireproofing for Plants, 30 June 2003
2- AD-036711 -- Concrete Fireproofing for Structural Members, 09 May 1995

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1

You might also like