Co Ordinator

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

• Prior knowledge requirements:

o Application of the requirements of codes and standards


o Identification of relevant material, components
o Knowledge of heat treatment procedures and recording systems
o Knowledge of hydrostatic test methods, safety and best practice and
pneumatic testing
o Awareness of destructive mechanical testing
o Knowledge of quality related procedures and practices
o Health and safety requirements and practices
o Knowledge of associated manufacturing processes and operations
o Use and application of inspection quality test plans/written schemes of
examination

Planning; Inspection test plans (quality plans); review and acceptance of: material
certification, mechanical testing reports, welding procedures qualifications, welder
qualifications, PWHT reports and procedures, pressure testing reports, NDT reports,
as built drawing, engineering query, non conformance reports, final certification.

You might also like