This production schedule outlines the filming of 5 scenes on March 11th for the project "Swell" at Christabel's House. Scene 001 will be filmed at 9am in the bedroom requiring a pregnancy test and casual clothing. Scene 002 will be filmed at 9:30am on the staircase with no props needed. Scene 003 in the kitchen at 10am will require kitchen appliances but extra safety precautions for knives. Scenes 004 and 005 will be filmed in the basement at 10:30am and 11am respectively, requiring party props like alcohol bottles and music but no health risks.
This production schedule outlines the filming of 5 scenes on March 11th for the project "Swell" at Christabel's House. Scene 001 will be filmed at 9am in the bedroom requiring a pregnancy test and casual clothing. Scene 002 will be filmed at 9:30am on the staircase with no props needed. Scene 003 in the kitchen at 10am will require kitchen appliances but extra safety precautions for knives. Scenes 004 and 005 will be filmed in the basement at 10:30am and 11am respectively, requiring party props like alcohol bottles and music but no health risks.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
This production schedule outlines the filming of 5 scenes on March 11th for the project "Swell" at Christabel's House. Scene 001 will be filmed at 9am in the bedroom requiring a pregnancy test and casual clothing. Scene 002 will be filmed at 9:30am on the staircase with no props needed. Scene 003 in the kitchen at 10am will require kitchen appliances but extra safety precautions for knives. Scenes 004 and 005 will be filmed in the basement at 10:30am and 11am respectively, requiring party props like alcohol bottles and music but no health risks.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd