This resource requirement sheet outlines the resources needed for a project including their name, the project they are assigned to, whether they are full-time or part-time, their current availability status, and the date they are required from. Several resources are listed including a full-time project manager and resources for full-time and part-time project flow, database, UI design, hardware, RFID and barcode modules, and coding.
This resource requirement sheet outlines the resources needed for a project including their name, the project they are assigned to, whether they are full-time or part-time, their current availability status, and the date they are required from. Several resources are listed including a full-time project manager and resources for full-time and part-time project flow, database, UI design, hardware, RFID and barcode modules, and coding.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
This resource requirement sheet outlines the resources needed for a project including their name, the project they are assigned to, whether they are full-time or part-time, their current availability status, and the date they are required from. Several resources are listed including a full-time project manager and resources for full-time and part-time project flow, database, UI design, hardware, RFID and barcode modules, and coding.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
Resource Name Project Type (Fulltime / Current Status Required from
Part-time) (Available / Not (Date) Available) <Resource 1> <PROJECT NAME> Full Time Project Management <Resource 2> Full Time, project flow, Database, UI design as per actual business logic, PartTime (Hardware & rfid module,Barcode module) Codind, UI Coding Coding