MINISTRY OF COMMUNICATION AND TRANSPORT ZANZIBAR ROADS

MECCO LTD DEPARTMENT


MAZIZINI-FUMBA ROAD UPGRADING PROJECT
ENGINEERING CONTRACT NO: MOCT/HQ/CW/01/2008/09 CONSULTANT

PRIME COAT SPRAY RATE CONTROLING SHEET

DATE TYPE OF BITUMEN MC


LOCATION DENSITY OF BITUMEN (A) 0.98
RESPONSIBLE TECHNICIAN REQUIRED SPRAY RATE 1.1

TRAY NO: NO: 1 4 6 10


B WEIGHT OF TRAY + BITUMEN kg
C WEIGHT OF EMPTY TRAY kg
D WEIGHT OF BITUMEN kg (B-C)
E AREA OF TRAY m2
F VOLUME OF BITUMEN kg/m2 (D/A)
G SPRAY RATE L/m2 (F/E)
AVERAGE SPRAY RATE L/m2

DATE TYPE OF BITUMEN MC


LOCATION DENSITY OF BITUMEN (A) 0.98
RESPONSIBLE TECHNICIAN REQUIRED SPRAY RATE 1.1

TRAY NO: NO: 1 4 6 10


B WEIGHT OF TRAY + BITUMEN kg
C WEIGHT OF EMPTY TRAY kg
D WEIGHT OF BITUMEN kg (B-C)
E AREA OF TRAY m2
F VOLUME OF BITUMEN kg/m2 (D/A)
G SPRAY RATE L/m2 (F/E)
2
AVERAGE SPRAY RATE L/m

0
INITIAL TEMPERATURE C
0
FINAL TEMPERATURE C
TRUCK SPEED Rpm
WEATEHER CONDITION sunny/cloud/rain

REMARKS
signature signature
for contractor for consultant