Valdes Engineering Company assisted an international corporation with expanding their Northern Illinois adhesive production facility by engineering the addition of a new building and process equipment to increase vinyl acetate ethylene copolymer adhesive capacity by 50%; the expansion included designing a 12,000 square foot process building and production area along with a high pressure reactor, heat exchanger, pump, and ethylene storage tank, with engineering completed within 10 months to allow construction to begin on schedule.
Valdes Engineering Company assisted an international corporation with expanding their Northern Illinois adhesive production facility by engineering the addition of a new building and process equipment to increase vinyl acetate ethylene copolymer adhesive capacity by 50%; the expansion included designing a 12,000 square foot process building and production area along with a high pressure reactor, heat exchanger, pump, and ethylene storage tank, with engineering completed within 10 months to allow construction to begin on schedule.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online from Scribd
Valdes Engineering Company assisted an international corporation with expanding their Northern Illinois adhesive production facility by engineering the addition of a new building and process equipment to increase vinyl acetate ethylene copolymer adhesive capacity by 50%; the expansion included designing a 12,000 square foot process building and production area along with a high pressure reactor, heat exchanger, pump, and ethylene storage tank, with engineering completed within 10 months to allow construction to begin on schedule.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online from Scribd
In anticipation of an expanding market, Valdes Engineering
Company (VEC) assisted an international corporation with the engineering/design of a plant expansion to increase production capacity at their Northern Illinois facility.
The plant produces vinyl
acetate ethylene (VAE) copolymer adhesives by means of a high pressure process utilizing vinyl acetate and cryogenic ethylene
All process equipment, utility
piping, vessels and structures were modeled in 3-D using PDS
Project Overview:
The plant expansion included the addition of a new building and
process equipment required to increase this facility’s adhesive production by 50%. VEC provided engineering and design services for a 12,000 ft2 process building and production area. Major process equipment included a high pressure reactor, heat exchanger, recirculation pump, and cryogenic ethylene storage tank. VEC met an aggressive schedule and completed the engineering phase of the project within 10 months. This enabled the client to begin the construction phase on schedule.