Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1.1 CAPACITY ADDITION & GENERATION DURING APR.

11

Description APR.11 APRIL.10


Target Achivement Target Achivement
CAPACITY ADDITION (MW)
THERMAL 735.00 735.00 1090.00 250.00
HYDRO 0.00 0.00 100.00 0.00
NUCLEAR 0.00 0.00 0.00 0.00
RES @
TOTAL 735.00 735.00 1190.00 250.00
GENERATION (MU)
THERMAL 58042.00 60014.14 55603.00 56699.37
NUCLEAR 2048.00 2659.67 1563.00 1764.64
HYDRO 7521.77 8874.87 7771.41 8475.30
BHUTAN IMPORT 166.00 112.20 302.54 165.50
TOTAL 67777.77 71660.88 65239.95 67104.81
@ Renewable Energy Sources (RES) includes Small Hydro Project(SHP), Biomass Gas(BG), Biomass Power(BP),
Urban & Industrial waste Power(U&I), and Wind Energy.
Note: Generation (MU) achieved in Apr,11 is provisional.
TARGET/ACHIVEMENT IN CAPACITY ADDITION ( MW ) DURING APR.11

3000

2500

2000

1500

1000 735 735 735 735

500
0 0 0 0
0
THERMAL HYDRO NUCLEAR TOTAL
Target Achievement

ACHIEVEMENT IN GENERATION ( MU ) DURING APR.11

8875 112

2660

60014

THERMAL NUCLEAR HYDRO Bhutan IMP

ENERGY SAVED IS ENERGY PRODUCED

You might also like