6 Month Periodic Report Inspection Findings and Assessment by Homogeneous Area
6 Month Periodic Report Inspection Findings and Assessment by Homogeneous Area
Note: Damage noted in tunnel area below building. When installing equipment to ceiling be certain all required safety procedures are followed to prevent expose to asbestos
fibers.
Page 2
6 MONTH PERIODIC REPORT
REINSPECTION STATUS
Reinspection Date Page 2 of 3
LEA Name: Cathedral Elementary School Building Name: Cathedral Elementary 10-13-09
Homog. Area Homogeneous Asbestos Containing Building Material Type & Condition (check one per column)
Code Area
ACBM? Area Assumed Friable Material Type Damage Potential For
ACBM? ACBM? Condition Damage
Yes/No Linear Feet Yes No TSI S Misc. No D SD PD PSD
Yes No
12A 9”X9” Floor Tile Yes 30’X24”
6th Grade Beige w/white
Reinspection Date:
COMPANY: Musser Environmental Consulting Inc. BUILDING NAME: Cathedral School PAGE_3_OF _3_
1-5-11
HOMOGENEOUS Provide a written explanation of changes, corrections, updates, or extent of damage as compared to data contained in original inspection findings.
AREA OR Recommended Response Action*
SALIENT ID
9“X9” Floor All floor tile was found to be in good condition O&M
tile
Spray-on Found to be in good condition. O&M
ceilings
TSI TSI has experienced light damage in crawl space. O&M
Recommended response action must be determined by an accredited “Management Planner”. Appropriate response actions should be filled in using the following AHERA named response actions: