HAIDER ALI
Employment
1992 till today; Water & Power Development Authority Pakistan (WAPDA)
PROFESSIONAL EXPERIENCE
(TOTAL WORK EXPERIENCE-------------19 YEARS)
Assistant Electrical Engineer in Electrical Maintenance Department at 3x210 MW Russian Steam Units at
Thermal Power Station WAPDA Muzaffargarh, Pakistan.
JOB RESPONSIBILITIES.
Responsible to look-after following equipments & to carryout routine, special checks for smooth
operation of 3x210 MW TPS, Muzaffargarh.
1. Generators, 210MW hydrogen, water-cooled.
1. 250 MVA Unit Transformers & 25MVA Auxiliary Transformers.
2. 220/6.6/0.4KV Switchgears.
i. Air blast Circuit breaker, Vacuum breakers, ACBs.
ii. C.Ts. P.Ts.
iii. 220KV Bus Bar (Double bus single breaker with transfer bus system.
3. 6.6KV & 0.4KV Motors.
4. D.C. Batteries.
During this stay Ist Inspection of Switch Yard, Transformers, C.Ts, P.Ts, 220KV Breakers after
commissioning of 3x210MW Russian Units was carryout under my supervision.
1. MAY 1996 TO FEBRUARY 1997.
Assistant Instrument Engineer at 1x320 MW Chinese Steam Unit (WESTING HOUSE TECIINOLOGY) at
Thermal Power Station WAPDA M/Garh Pakistan.
JOB RESPONSIBILITIES.
To inspect the material and the instruments shipped by the Contractor before installation and to supervise the
calibration, erection testing and commissioning of all I&C instruments & System including the latest distributed
control system (D.C.S) being installed by M/s CMEC CHINA.
2. MARCH 1997 TO DECEMBER 2000.
Operation Engineer for the operation of 1x320 MW Chinese Steam Unit (WESTING HOUSE
TECIINOLOGY) at Thermal Power Station WAPDA M/Garh Pakistan.
This is most modern electric power plant using the latest DCS control systems and & technology by
WESTING HOUSE USA.
JOB RESPONSIBILITIES.
I am responsible for smooth trouble free and efficient running of power plant. I am
quite familiar with Steam Cycle, Condensate Cycle, Feed Water Cycle, Gas & Oil
Firing in boiler. I have sufficient knowledge about different auxiliaries system, fuel
supply system & circulating water system.
A 220 KV Grid Station is also attached with Station. Being Shift Engineer I was also
responsible for the operation of grid station.
Scope of responsibilities extends to.
● Personnel and technical management for smooth and trouble free operation of plant.
● To minimize deprecation of plant & equipment.
● To ensure scheduled changeover of working and standby equipments to avoid any intricacy in maintenance
problems.
4) 18- OCT 1997 TO 25 OCT 1997 & 20 JAN TO 28 JAN 1998.
I was deputed from WAPDA side to witness the 7 days reliability run test of unit 1&2 of A.E.S. Lalpir in
Collaboration with KEMA Laboratories Holland. The main objective of the test is to monitor the
parameters of boiler, turbine and Generator as per power purchase agreement between WAPDA & A.E.S.
LALPIR M/Garh.
Signature