Professional Documents
Culture Documents
Recommendations For Calculating LV Distribution Project
Recommendations For Calculating LV Distribution Project
Recommendations For Calculating LV Distribution Project
BOQ FOR TDN AT AMUZU LOCATION: II 1 TOTAL LT SCOPE: 2 8.5MTR PLAIN LT POLES: 3 HT DUAL SCOPE: A 1 TOTAL LT SCOPE: 4 PLAIN LT SCOPE: 5 PLAIN LT SPAN: E 8.5MTR PLAIN LT POLES: 6 DUAL HT SPAN: 7 TOTAL LT SPAN: 8 70MM2 AAC CONDUCTOR: 9 EXTENSION STRAP: 1 0 EXTENSION POINTS: 1 0 SHACKLE INSULATORS: 1 1 D IRON W/PINS: 1 2 5/8 WASHERS: 1 3 5/8 x 9" BOLTS &NUTS: 1 4 5/8 x 8" BOLTS &NUTS: 1 5 LT STAY RODS: 1 6 LT STAY INSULATOR: 1 7 LT STAY BLOCKS: POLE HEIGHT: STAY BLOCK TO POLE BASE DISTANCE: SQUARE(POLE HEIGHT): SQUARE(STAY BLK. TO POLE BASE): ADD. SQUARE: MIN. STAY WIRE: 1 8 50MM2 STAY WIRE: DAT L.G.A: 3.15 km 43 nos 1 km 3.15 km 2.15 km span 43 s 43 nos span 20 s span 63 s 13230 mtrs 25.2 nos 6.3 nos 277.2 nos 277.2 nos 277.2 nos 108.10 8 nos 169.09 2 nos 35.1 nos 35.1 nos 35.1 nos 8.5 2 72.25 4 76.25 9.6053 37 372.24 73 mtrs E: APR 30 08
DISTANCE: R-B, B-Y, Y-N LT LINES: DISTANCE:POLE TIP TO NEUTRAL LT LINE: NEUTRAL LT LINE TO POLE BASE: 1 9 BI-METAL LINE TAP: 2 0 6FT EARTH RODS: 2 50MM2 COPPER 1 WIRE:
OLADIPO