Manufacturing To Facilities Design and Materials Handling: (Some Notes From Book by Meyers & Stephes)

You might also like

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 7

Manufacturing to Facilities

Design and Materials Handling


(Some notes from book by
Meyers & Stephes)
Chapter 1 Highlights
• Manufacturing Facilities Design
– Organization of physical faciliteis to maximize
efficiencies
• Material handling
– Moving stuff
• Fork Trucks
• Conveyors
• Employees
- Accounts for apx 50% of injuires,
- Accounts for apx 40%-80% of costs
Buzzwords
• Lean Manufacturing- Less of everything is better
• Muda - Waste
• Kaizen - Continous Improvement
• VSM - Value Stream Mapping
• Mission Statement – Primary Goals
• ROI – Return On Investment
• Value Added – Work that Transforms materials.
• Takt Time – Operating Time/Production Requirements
• Root Cause – 5 whys
• Pokayoke – Fool Proofing
• JIT – Just In Time
ISO 9000 is a family of standards for quality
manange systems:
• a set of procedures that cover all key processes in the
business;
• monitoring processes to ensure they are effective;
• keeping adequate records;
• checking output for defects, with appropriate and
corrective action where necessary;
• regularly reviewing 9000 – International Standards
for Quality management individual processes and the
quality system itself for effectiveness; and
• facilitating continual improvement
Subgoals of Mission Statement
1. Minimize unit and Production Cost
2. Optimize quality
3. Promote Effective use of:
– People
– Equipment
– Space
– Energy
4. Provide for:
– Employee Convenience
– Employee Safety
– Employee Comfort
• Control Project Costs
• Achieve Production Start Date
• Flexibility in the plan
• Reduce or eliminate useless inventory
• Achieve Miscellaneous Goals
5 S’s Principals
• Sifting
– Keeping only what is needed
• Sorting
– Puts things in their proper place
• Sweeping
– Cleaning
• Spick and Span
– Safety
• Strict
– Following Procedures, everyone on the same page
Types of MF Design Projects

1. New Facility
2. New Product (returns)
3. Design Changes
4. Cost Reduction
5. Retrofit

You might also like