SUB CONT
ELEMENT
TAKER
DATE
:
:
:
:
:
1450 x 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Floor
6.00
6.00
6.00
6.00
6.00
Workdone
Top + Bottom
+ side (1)
4.1
2.00
1.00
2.00
2.00
4 panel
Workdone
2850 x 1200
Top + Bottom
+ side (2)
8.10
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Floor
Length
8.20
4.10
8.20
8.20
-
Length
2.00
2.00
2.00
2.00
2.00
Top +
Bottom +
side (2)
5.3
2.000
2.000
2.000
1.000
Length
10.60
10.60
10.60
5.30
-
Total
18.800
14.700
18.800
13.500
0.000
65.800
Total
-
0.000
0.000
0.000
0.000
0.000
0.000
Front elevation
1 panel
Workdone
Top + Bottom
+ side (2)
3.900
2.00
2.000
750 x 1200
Level
Ist Floor
Length
Total
7.80
2 panel (b)
Level
Ist Floor
Workdone
Top + Bottom
1450 x 1200
+ side (1)
4.10
2.00
2 panel (s)
850 x 1200
Level
2nd Floor
3rd floor
4th floor
5th Level
12.00
12.00
12.00
12.00
Length
-
Top +
Bottom +
side (2)
5.300
1.000
Length
5.30
Total
5.300
5.300
Workdone
Top + Bottom
+ side (1)
2.90
1.00
1.00
1.00
1.00
3 panel
Level
Ist Floor
7.800
7.800
Top + Bottom
2150 X 1200 + side (1)
5.50
4.00
Length
2.90
2.90
2.90
2.90
Top +
Bottom +
side (2)
4.1
4
4
4
2
Length
16.40
16.40
16.40
8.20
Total
19.300
19.300
19.300
11.100
69.000
Workdone
Length
-
Top +
Bottom +
side (2)
6.70
2.000
Length
13.40
Total
13.400
13.400
4 panel
Workdone
2850 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level
6.00
6.00
6.00
6.00
6.00
Summary
Left elevation
2 panel (b)
4 panel
Front elevation
1 panel
2 panel (b)
2 panel (s)
3 panel
4 panel
Total
Top + Bottom
+ side (2)
8.100
5.000
5.000
5.000
5.000
4.000
Length
40.50
40.50
40.50
40.50
32.40
194.400
total contract
workdone
65.80
-
7.80
5.30
69.00
13.40
194.40
355.70
626.60
355.700
PROJECT
SUB CONT
ELEMENT
TAKER
DATE
:
:
:
:
:
ok
3 panel
Workdone
2150 X 1200
Level
2nd Floor
3rd floor
4th floor
5th Floor
1.00
1.00
1.00
1.00
Top + Bottom
+ side (2)
6.70
1.000
1.000
1.000
1.000
4 panel
6.70
6.70
6.70
6.70
26.80
Workdone
2850 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level
Length
4.00
8.00
8.00
8.00
5.00
Top + Bottom
+ side (1)
6.900
0.000
2.000
2.000
2.000
2.000
Length
13.80
13.80
13.80
13.80
2 panel (b)
1450 x 1200
Level
2nd Floor
3rd floor
4th floor
5th Level
4.00
4.00
4.00
4.00
Top + Bottom
+ side (1)
4.10
2.00
2.00
2.00
1.00
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Floor
1.00
1.00
1.00
1.00
1.00
3 panel
8.20
8.20
8.20
4.10
ok
Top + Bottom
+ side (1)
2.70
1.00
1.00
1.00
1.00
1.00
Length
2.70
2.70
2.70
2.70
2.70
13.500
Workdone
2150 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Floor
Length
Workdone
750 x 1200
1.00
1.00
1.00
1.00
1.00
Length
8.10
32.40
24.30
24.30
16.20
Total
8.100
46.200
38.100
38.100
30.000
160.500
Workdone
Top +
Bottom +
side (2)
8.100
1.000
4.000
3.000
3.000
2.000
Top + Bottom
+ side (2)
6.70
1.000
1.000
1.000
1.000
1.000
Length
6.70
6.70
6.70
6.70
6.70
Top +
Bottom +
side (2)
5.300
2.000
2.000
2.000
3.000
Length
10.60
10.60
10.60
15.90
Total
18.800
18.800
18.800
20.000
76.400
33.500
4 panel
Workdone
2850 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level
3.00
3.00
3.00
3.00
3.00
Top + Bottom
+ side (2)
8.100
3.000
3.000
3.000
3.000
3.000
2.00
2.00
2.00
2.00
Length
24.30
24.30
24.30
24.30
24.30
121.500
ok
Workdone
Top + Bottom
1.70
1.00
1.00
1.00
1.00
Length
1.70
1.70
1.70
1.70
6.800
3 panel
Workdone
2150 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
2.00
2.00
2.00
2.00
Top + Bottom
+ side (2)
6.70
1.000
1.000
1.000
1.000
Length
6.70
6.70
6.70
6.70
26.800
ok
2 panel (b)
1450 x 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level
4.00
4.00
4.00
4.00
4.00
Workdone
Top + Bottom
+ side (1)
4.10
2.00
2.00
2.00
2.00
2.00
3 panel
8.20
8.20
8.20
8.20
8.20
Length
10.60
10.60
10.60
10.60
10.60
Total
18.800
18.800
18.800
18.800
18.800
94.000
Workdone
2150 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level
Length
Top +
Bottom +
side (2)
5.300
2.000
2.000
2.000
2.000
2.000
3.00
3.00
3.00
3.00
3.00
Top + Bottom
+ side (1)
5.50
2.00
2.00
2.00
2.00
2.00
Length
11.00
11.00
11.00
11.00
11.00
Top +
Bottom +
side (2)
6.70
1.000
1.000
1.000
1.000
1.000
Length
6.70
6.70
6.70
6.70
6.70
Total
17.700
17.700
17.700
17.700
17.700
88.500
1 panel
Workdone
750 x 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Floor
1.00
1.00
1.00
1.00
1.00
4 panel
Length
2.70
2.70
2.70
2.70
2.70
13.500
Workdone
2850 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level
Top + Bottom
+ side (1)
2.70
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Top + Bottom
+ side (2)
8.100
1.000
1.000
1.000
1.000
1.000
Length
8.10
8.10
8.10
8.10
8.10
40.500
Summary
Right elevation
3 panel
4 panel
2 panel (b)
26.80
160.50
76.40
94.00
88.50
13.50
40.50
702.30
242.50
180.50
423.00
total contract
total workdone
801.40