PROJECT

SUB CONT
ELEMENT
TAKER
DATE

:
:
:
:
:

M Suite Hotel (Renovation)


You Keong
CRC coping
Noraisah Idros
16.6.11
Left elevation
2 panel (b)

1450 x 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Floor

6.00
6.00
6.00
6.00
6.00

Workdone
Top + Bottom
+ side (1)
4.1
2.00
1.00
2.00
2.00

4 panel

Workdone

2850 x 1200

Top + Bottom
+ side (2)
8.10

Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Floor

Length
8.20
4.10
8.20
8.20
-

Length

2.00
2.00
2.00
2.00
2.00

Top +
Bottom +
side (2)
5.3
2.000
2.000
2.000
1.000

Length
10.60
10.60
10.60
5.30
-

Total
18.800
14.700
18.800
13.500
0.000
65.800

Total
-

0.000
0.000
0.000
0.000
0.000
0.000

Front elevation
1 panel

Workdone
Top + Bottom
+ side (2)
3.900
2.00
2.000

750 x 1200
Level
Ist Floor

Length

Total

7.80

2 panel (b)

Level
Ist Floor

Workdone

Top + Bottom
1450 x 1200
+ side (1)
4.10
2.00

2 panel (s)

850 x 1200
Level
2nd Floor
3rd floor
4th floor
5th Level

12.00
12.00
12.00
12.00

Length
-

Top +
Bottom +
side (2)
5.300
1.000

Length
5.30

Total
5.300
5.300

Workdone
Top + Bottom
+ side (1)
2.90
1.00
1.00
1.00
1.00

3 panel

Level
Ist Floor

7.800
7.800

Top + Bottom
2150 X 1200 + side (1)
5.50
4.00

Length
2.90
2.90
2.90
2.90

Top +
Bottom +
side (2)
4.1
4
4
4
2

Length
16.40
16.40
16.40
8.20

Total
19.300
19.300
19.300
11.100
69.000

Workdone

Length
-

Top +
Bottom +
side (2)
6.70
2.000

Length
13.40

Total
13.400
13.400

4 panel

Workdone

2850 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level

6.00
6.00
6.00
6.00
6.00

Summary
Left elevation
2 panel (b)
4 panel
Front elevation
1 panel
2 panel (b)
2 panel (s)
3 panel
4 panel
Total

Top + Bottom
+ side (2)
8.100
5.000
5.000
5.000
5.000
4.000

Length
40.50
40.50
40.50
40.50
32.40
194.400

total contract
workdone
65.80
-

7.80
5.30
69.00
13.40
194.40
355.70

626.60
355.700

PROJECT
SUB CONT
ELEMENT
TAKER
DATE

:
:
:
:
:

M Suite Hotel (Renovation)


Yonseen
CRC coping
Noraisah Idros
16.6.11
Right elevation

ok

3 panel

Workdone

2150 X 1200
Level
2nd Floor
3rd floor
4th floor
5th Floor

1.00
1.00
1.00
1.00

Top + Bottom
+ side (2)
6.70
1.000
1.000
1.000
1.000

4 panel

6.70
6.70
6.70
6.70
26.80

Workdone

2850 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level

Length

4.00
8.00
8.00
8.00
5.00

Top + Bottom
+ side (1)
6.900
0.000
2.000
2.000
2.000
2.000

Length
13.80
13.80
13.80
13.80

2 panel (b)

1450 x 1200
Level
2nd Floor
3rd floor
4th floor
5th Level

4.00
4.00
4.00
4.00

Top + Bottom
+ side (1)
4.10
2.00
2.00
2.00
1.00

Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Floor

1.00
1.00
1.00
1.00
1.00

3 panel

8.20
8.20
8.20
4.10

ok

Top + Bottom
+ side (1)
2.70
1.00
1.00
1.00
1.00
1.00

Length
2.70
2.70
2.70
2.70
2.70
13.500

Workdone

2150 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Floor

Length

Workdone

750 x 1200

1.00
1.00
1.00
1.00
1.00

Length
8.10
32.40
24.30
24.30
16.20

Total
8.100
46.200
38.100
38.100
30.000
160.500

Workdone

Front elevation (grid 6a - 8a)


1 panel

Top +
Bottom +
side (2)
8.100
1.000
4.000
3.000
3.000
2.000

Top + Bottom
+ side (2)
6.70
1.000
1.000
1.000
1.000
1.000

Length
6.70
6.70
6.70
6.70
6.70

Top +
Bottom +
side (2)
5.300
2.000
2.000
2.000
3.000

Length
10.60
10.60
10.60
15.90

Total
18.800
18.800
18.800
20.000
76.400

33.500

4 panel

Workdone

2850 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level

3.00
3.00
3.00
3.00
3.00

Top + Bottom
+ side (2)
8.100
3.000
3.000
3.000
3.000
3.000

Front elevation (grid 8a- 9a)


2 panel (s)
850 x 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor

2.00
2.00
2.00
2.00

Length
24.30
24.30
24.30
24.30
24.30
121.500

ok
Workdone

Top + Bottom
1.70
1.00
1.00
1.00
1.00

Length
1.70
1.70
1.70
1.70
6.800

3 panel

Workdone

2150 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor

2.00
2.00
2.00
2.00

Top + Bottom
+ side (2)
6.70
1.000
1.000
1.000
1.000

Left elevation (grid f-6a)

Length
6.70
6.70
6.70
6.70
26.800

ok

2 panel (b)

1450 x 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level

4.00
4.00
4.00
4.00
4.00

Workdone
Top + Bottom
+ side (1)
4.10
2.00
2.00
2.00
2.00
2.00

3 panel

8.20
8.20
8.20
8.20
8.20

Length
10.60
10.60
10.60
10.60
10.60

Total
18.800
18.800
18.800
18.800
18.800
94.000

Workdone

2150 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level

Length

Top +
Bottom +
side (2)
5.300
2.000
2.000
2.000
2.000
2.000

3.00
3.00
3.00
3.00
3.00

Top + Bottom
+ side (1)
5.50
2.00
2.00
2.00
2.00
2.00

Length
11.00
11.00
11.00
11.00
11.00

Top +
Bottom +
side (2)
6.70
1.000
1.000
1.000
1.000
1.000

Length
6.70
6.70
6.70
6.70
6.70

Total
17.700
17.700
17.700
17.700
17.700
88.500

1 panel

Workdone

750 x 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Floor

1.00
1.00
1.00
1.00
1.00

4 panel

Length
2.70
2.70
2.70
2.70
2.70
13.500

Workdone

2850 X 1200
Level
Ist Floor
2nd Floor
3rd floor
4th floor
5th Level

Top + Bottom
+ side (1)
2.70
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00

Top + Bottom
+ side (2)
8.100
1.000
1.000
1.000
1.000
1.000

Length
8.10
8.10
8.10
8.10
8.10
40.500

Summary
Right elevation
3 panel
4 panel
2 panel (b)

26.80
160.50
76.40

Front elevation (grid 6a - 8a)


1 panel
13.50
3 panel
33.50
4 panel
121.50
Front elevation (grid 8a- 9a)
2 panel (b)
6.80
3 panel
26.80
Left elevation (grid f-6a)
2 panel (b)
3 panel
1 panel
4 panel

94.00
88.50
13.50
40.50
702.30

242.50
180.50
423.00

total contract
total workdone

801.40
702.30