1.

HIGHLIGHTS OF POWER SECTOR


a Installed Generation Capacity (As on 31-03-10 )
All
Thermal
India
Coal
Gas
Diesel
MW
84198.38
17055.85
1199.75
%age
52.8
10.7
0.8
@ Based on data as on 30.09.2008.

Nuclear
Total
102453.98
64.3

Hydro
36863.40
23.1

RES@
Grand Total
(MNRE)
15521.11 159398.49
9.7
100.0

(Renewable)

4560.00
2.9

b Capacity Addition Target during 11th Plan


Hydro

Thermal

Nuclear

Total

15627
19.9

59693
75.8

3380
4.3

78700
100.0

Thermal

Nuclear

Total

13002.0

660.0

14507.0

9106.0
70.0

440.0
66.7

9585.0
66.1

MW
%age
c

Generation Capacity Addition Target/Achievement (2009-10)


Hydro
Target
(MW)
845.0
Achievement up to MAR.10
(MW)
39.0
%age
4.6

d Electricity Generation Target/achievement (2009-10)


Hydro
Target
MU
115468
Achievement up toMAR.10
MU
106655.9
%age
92.37
e

Nuclear

Bhutan
(Imp)

Total

648479.58

19000

6564

789511.58

640522.5
98.77

18653.68
98.18

5341.11
81.37

771173.16
97.68

Status of CEA Concurrence to Hydro Schemes


Period

2007-08
2008-09
2009-10

Thermal

Project

Carry forward

report

from

received

Prev. year

Under
Prelim.
Exam

Accepted Concurrence
for concurgiven
rence
by CEA

13
8

3
1

4
4

10
5

19

10

Project reports

returned
to Developer

All India Thermal PLF (%)

2001-02

2002-03

2003-04

2004-05

2005-06

2006-07

2007-08

2008-09

69.9

72.2

72.7

74.8

73.6

76.8

78.6

77.19

2009-10 *
upto Mar 10

* Provisional

ENERGY SAVED IS ENERGY PRODUCED

77.48

All India Annual per Capita consumption of Electricity


Year
Per Capita Consumption ( kWh)
(As per U. N. methodology)

2002-03
2003-04
2004-05
2005-06
2006-07
2007-08

566.7
592.0
612.5
631.5
671.9
704.2

All India Transformation, T&D and AT&C losses :


Year
T&D losses
2002-03
32.54
2003-04
32.53
2004-05
31.25
2005-06
30.42
2006-07
28.61
2007-08
26.91

AT&C Losses*

32.54
34.78
34.33
34.54
32.07
NA

* PFC Figs.

a) All India Village Electrification (as on 28.02. 2010):


b) Pumpsets Energised (as on 28.02. 2010):

All India Coal Consumption for Power Generation (Utilities)


YEAR
Coal Cunsumption
( Million Tonnes )
2001-02
240
2002-03
253
2003-04
263
2004-05
278
2005-06
280
2006-07
302
2007-08
330
2008-09
355
Average cost of power supply & average realization ( paise/kWh )
Year
cost of supply
realization(paise/unit)
(paise/unit)
Including
Only
Agriculture Agriculture
2001-02
246
181
58.67
2002-03
238
195
77.48
2003-04
239
203
72.39
2004-05
254
209
75.68
2005-06
258
221
79.37
2006-07
276
227
71.32

497838 (83.8%)
16184257 (81.5%)

Source:- PFC Reports on the performance of State Power Utilities

Power supply Position 2009-10(MAR,10)*


Region
Northern
Western
Southern
Eastern
North Eastern
All India

* Provisional

Energy(MU) Deficit%
Requirement
20,956
24,589
21,945
8,254
749
76,493

-10.6
-16.4
-9.4
-7.1
-10.3
-11.7

Peak

Deficit%

Demand(MW)
31,253
39,609
32,082
13,963
1,565
118,472

-14.1
-17.7
-9.4
-7.7
-13.2
-13.3

ENERGY SAVED IS ENERGY PRODUCED